Loading...
HomeMy WebLinkAboutLetter Of Truss ApprovalGF;-D ENGINEERING ASSOCIATES December 10, 2021 Building Department 258 Southhall Lane, Suite 200 Maitland, Florida 32751 P: (321) 972-0491 1 F: (407) 880-2304 1 E: info@fdseng.com Website: www.fdseng.com Ref: Adams Homes Lot: Lot 173 Ph.3 Subdivision: Fort Pierce - Waterstone Address: 5317 Vespera St. Model: 1820 B RHG KA # 21-10564 Truss Company: Date of drawings: Job No.: Wind Speed: Exposure: Truss Engineer: Builders First Source 9/14/21 2866816 160 C Andrew Johnson To whom it may concern, REVIEWED FOR CODE COMPLIANCE ST. LUCIE COUNTY B®CC We have reviewed the truss design package for the project referenced above. This truss package complies with the original design intent and the underlying structure will accommodate all indicated loads. We approve the truss package without comment based upon the truss layout and truss profiles supplied to us by the Truss Company with truss profiles sealed by the Truss Engineer. Please note, this review is only for general conformance with the design concept of the project. Contractor or sub -contractor is responsible for matching all structural components and details shown in the construction documents. Contractor or sub -contractor is also responsible for confirming all quantities and dimensions; selecting appropriate fabrication process®�md: i e, I� . Ale techniques; and coordinating work with all other trades. 05 P NBLO TO o0•J�. •'�CEfYs' moo. Note: Truss ID's may vary. `� e �' F '• : �, No 8786 If you have any questions, please do not hesitate to call. Sincerely, • „ STATE F , SS i7io ` 12/10/2021 12/10/2021 12/1 /2021 Carl A. Brown, P.E. Scott Lewkowski, P.E. Luis Pablo Torre, P.E. FL. # 56126 FL. #78750 FL. # 87864 1 FDS Engineering Associates, A TSG Company "Your Building Code Experts" 13-04-00 6-04-00 - il 20-00-00 39-08-00 I] Reviewed and Approved ❑ Revise and Resubmit ❑ Reviewed with Notations ❑ Not Reviewed (see explanation) Corrections or comments made on equipment submittals or shop drawings during this review do not relieve contractor from compliance with requirements of the drawings and specifications. This check is only for review of general conformance with the concept of the project and general compliance with the information given in the contract documents. The contractor is responsible for confirming and correlating all quantities and dimensions; selecting fabrication processes and techniques of construction; coordinating his work with that of all other trades and performing his work in a safe and satisfactory manner / FDS ENGINEERING ASSOCIATES Date: 12/10/2021 By: BH Submittal No.: Project No.: 21-10564 Project Fag.: Luis Project Name: Adams Homes - Ft. Pierce - Lot 173 Ph.3 VERIFY ALL DIMENSIONS AND COUNG CONDITIONS PRIOR TO APPROVAL SOME CEIUNG FRAMING REQUIRED IN FIELD BY BUILDER MAIN WIND FORCE RESISTNG SYSTEMNCC HYBRID WRa1 ",,a7.16 1N 05E0 IMPORTANT EXPOSURE CATEGORY C OCCIIPaacYCATEOORY R This Drawing Must Be Approved And M WIND LOAD 150 PH WIND LOAD I ANFACTOR 1.00 Returned Berom Fabrication Will TRUSSES NAVE BEEN DE51GNm FOR A 10A PSF BOTTOM CNORD LIVE LOAD Begin. For Your Protection Check All NONCONCI RRENr WITH ANY OTNER UVE LOADS Dimensions And Conditions Prior To Approval Of Plan. SIGNATURE BELOW INDICATES ALL ROOF LOADING FLOOR LOADING NOTES AND DIMENSIONS HAVE TCLL• 20 PSF TCLL• 40 PSF BEEN ACCEPTED. TCDL: 07 PSF TCDL• 10 PSF By Date BCOL: 10 PSF BCDL: 6 PSF TOTAL, 37 PSF TOTAL: 65 PSF DURATION: 1.25 DURATION: 1.00 CAUTIONM DO NOT ATTEMPT TO ERECT TRUSSES WITHOUT REFERRING TO THE ENGINEERING DRAWINGS AND BSCI-B7 SUMMARY SHEETS. ALL PERMANENT BRACING MUST BE IN PLACE PRIOR TO LOADING TRUSSES. (is. SHEATHING, SHINGLES, ETC.) ALL INTERIOR BEARING WALLS MUST BE IN PLACE' PRIOR TO INSTALLING TRUSSES. REFER TO FINAL ENGINEERING SHEETS FOR THE FOLLOWING. 1) NUMBER OF GIRDER PLIES AND NAILING SCHEDULE. 2) BEARING BLOCK REQUIREMENTS. 3) SCAB DETAILS (IF REQUIRED) 4) UPLIFT AND GRAVITY REACTIONS. WARNING Backcharges Will Not Be Accepted Regardless of Fault Without Prior Notification By Customer Within 48 Hours And Investigation By Builders First Source. NO EXECPTIONS. The General Contractor is Responsible For All Connections Other Than Truss to Truss, Gable Shear Wall, And Connections. Temporary and Permanent Bracing, And Ceiling And Roof Diaphragm Connections. ROOF PITCH: 6112 CEILING PITCH: 3112 TOP CHORD SIZE: 2 X 4 BOTTOM CHORD SIZE: 2 X 4 OVERHANG LENGTH: 16" END CUT: Plumb CANTILEVER: — TRUSS SPACING: 24" BUILDING CODE: FBC2020 BEARING HEIGHT SCHEDULE Hatch Legend =8'-0" bearing ®10'-0" bearing BUILDER: Adams Homes PROJECT: I Single Family BLK MODEL 1 1820 B BLK ADDRESS: 1 6317 VESPERA ST LOT / BLOCK: 173 PH3 SUBDIVISION: WATERSTONE CITY: FORT PIERCE 'PRAWN BY: I SANCHEZ JOB # : 2866816 DATE: 1 09110/2021 1 SCALE: NTS PLAN DATE: 1 2021 REVISIONS: 1. 2. 3. 4, 4408 Airport Road Plant City, FL 33563 Ph.(813) 306-1300 Fax(813) 305-1301