Loading...
HomeMy WebLinkAboutLetter Of Truss Approval258 Southhall Lane, Suite 200 D Maitland, Florida 32751 P: (321) 972-0491 1 F: (407) 880-2304 1 E: info@fdseng.com Website: www.fdseng.com ENGINEERING ASSOCIATES November 17, 2021 Building Department Ref: Adams Homes Lot: Lot 171 Blk. Ph3 Subdivision: Fort Pierce - Waterstone Address: 5309 Vespera St. Model: 1820 D LHG KA # 21-10560 Truss Company: Builders First Source Date of drawings: 9/14/2021 Job No.: 2866910 Wind Speed: 160 Exposure: C Truss Engineer: Andrew Johnson To whom it may concern, REVIEWED FOR CODE COMPLIANCE ST. LUCIE COUNTY S®CC We have reviewed the truss design package for the project referenced above. This truss package complies with the original design intent and the underlying structure will accommodate all indicated loads. We approve the truss package without comment based upon the truss layout and truss profiles supplied to us by the Truss Company with truss profiles sealed by the Truss Engineer. Please note, this review is only for general conformance with the design concept of the project. Contractor or sub -contractor is responsible for matching all structural components and details shown in the construction documents. Contractor or sub -contractor is also responsible for confirming all quantities and dimensions; selecting appropriate fabrication processes and techniques; and coordinating work with all other trades. ���,�aa I L Note: Truss ID's may vary. If you have any questions, please do not hesitate to call. Sincerely, 11/17/2021 11/17/2021 Carl A. Brown, P.E. Scott Lewkowski, P.E. FL. # 56126 FL. #78750 FDS Engineering Associates, A TSG Company "Your Building Code Experts" Luis Pablo Torresf, P.E. FL. # 87864 IN IN � i", O.nI,EER-O■ �� N 1.,1 MAINOEM Pam .MIN mosol Win .' 1111,11 WIN M M 11 a I ­ - I - FEW! milk IN Exposed t. wind ENE IM =JN NNE ON Em Egg ■ FAmon mol Ems- wim -mEll ONE ME�\ ❑+ Reviewed and Approved ❑ Revise and Resubmit ❑ Reviewed with Notations ❑ Not Reviewed (see explanation) Corrections or comments made on equipment submittals or shop drawings during this review do not relieve contractor from compliance with requirements of the drawings and specifications_ This check is only for review of general conformance with the concept of the project and general compliance with the information given in the contract documents. The contractor is responsible for confirming and correlating all quantities and dimensions; selecting fabrication processes and techniques of construction; coordinating his work with that of all other trades and performing his work in a safe and satisfactory manner FDS ENGINEERING ASSOCIATES Date: 11/17/2021 BY: ES Submittal No.: Project No.: 21-10560 Project Eng.: Luis To Project Name: Adams Homes - Fort Pierce - Waterston - Lot 171 Blk Ph3 VERIFY ALL DIMENSIONS AND CEILING CONUTIONS PRIOR TO APPROVAL SOME CEWNG FRAMWG REQURED W REM BY SU MER MAIN V ND FORCE RESLSNNO SYSTEMICL HYRRID'MNO ASCEF40 ENCL0.5ED EXPOSURE OATEGORY C OCCUPANCY CATEGORY %HIND LOAD 16C MPN VAND IMPORTANCE FACTOR 1- TRUSSES HAVE BEEN DESIGNED FOR A 10.0 PSF BOTTOM CHORD LIVE LOAD NONCONCUR WITH ANY OTHER LIVE LOADS ROOF LOADING FLOOR LOADING TCLL- 20 PSF TCLL* 40 PSF TCDL: 07 PSF TCDL• 10 PSF BCDL: 10 PSF BCDL- 5 PSF TOTAL: 37 PSF TOTAL* 65 PSF DURATION: 1.25 DURATION: 1.00 IMPORTANT This Drawing Must Be Approved And Returned Before Fabrication Will Begin. For Your Protection Check All Dimensions And Conditions Prior To Approval Of Plan. SIGNATURE BELOW INDICATES ALL NOTES AND DIMENSIONS HAVE BEEN ACCEPTED. By Date CAUTION!!! DO NOT ATTEMPT TO ERECT TRUSSES WITHOUT REFERRING TO THE ENGINEERING DRAWINGS AND BSCI$1 SUMMARY SHEETS. ALL PERMANENT BRACING MUST BE IN PLACE PRIOR TO LOADING TRUSSES. (ie. SHEATHING, SHINGLES, ETC.) ALL INTERIOR BEARING WALLS MUST BE IN PLACE PRIOR TO INSTALLING TRUSSES. REFER TO FINAL ENGINEERING SHEETS FOR THE FOLLOWING. 1) NUMBER OF GIRDER PLIES AND NAILING SCHEDULE 2) BEARING BLOCK REQUIREMENTS. 3) SCAB DETAILS (IF REQUIRED) 4) UPLIFT AND GRAVITY REACTIONS. WARNING Backcharges Will Not Be Accepted Regardless of Fault Without Prior Notification By Customer Within 48 Hours And Investigation By Builders First Source. NO EXECPTIONS. The General Contractor Is Responsible For All Connections Other Than Truss to Truss, Gable Shear Wall, And Connections. Temporary and Permanent Bracing, And Ceiling And Roof Diaphragm Connections. ROOF PITCH: 6112 CEILING PITCH: 3112 TOP CHORD SIZE: 2 X 4 BOTTOM CHORD SIZE: 2 X 4 OVERHANG LENGTH: IV' END CUT: Plumb CANTILEVER: — TRUSS SPACING: 24" BUILDING CODE: FBC2020 BEARING HEIGHT SCHEDULE BUILDER: Adams Homes PROJECT: Single Family MODEL' 1820 D ADDRESS: 6309 VESPERA ST LOT I BLOCK: 171 PH3 UBDIVISION: WATERSTONE CITY: FT PIERCE DRAWN BY: KSANCHEZ JOB # : 2866910 DATE: 09/10/2021 SCALE: NTS PLAN DATE: 1 2021 REVISIONS: 1. 2. 3. 4. 4408 Airport Road Plant City, FL 33563 Ph. (813) 305-1300 Fax(813) 305-1301