Loading...
HomeMy WebLinkAboutBower Door TestEnvelope Leakage Test Re p �. Report(Blower Door Test) z Residential Prescriptive, Performance or ERI Method Compliance 2017 Florida. Building Code, Energy Conservation, 6th Edition Jurisdiction: lPermit#: 03 FO Job Information Builder: • Community: jMtgd+ 000 b Lot: I Address: 3 6 (3 & ro ve Unit: City: f State: F L Zip: 3 �/ Air Leakage Test Results Passing results must meet either the Performance, Prescriptive, or ERI Method OPRESCRIPTIVE METHOD- Th b '!d' e ui ing or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air changes per hour at a pressure of 0.2 inch w.g. (50 pascals) in Climate Zones 1 and 2. PERFORMANCE or ERI METHOD- The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding the selected ACH(50) value, as shown on FORM 11405-2017 (Performance) or R406-2017 (ERI), section labeled as Infiltration, sub -section ACH. ACH(50) specified on Form R405-2017-Energy Calc (Performance) or R406 2017 (ERI)., 7 • () f— x 60 - �-7 -7 76 Method for -calculating building ti CFM(50) Building Volume ACH(50) Retrieved from architectural plans COPASS ❑FAIL O Code software calculated When ACH(50) is less than 3, Mechanical Ventilation installation must be verified by building department. OField measured and calculated Testing. Testing shall be conducted in accordance with ANSVRESNETACC 380 and reported at a pressure or 0.2 inche w.g. (5o Pascals). Testing shall be conducted by either individuals as defined in Section 553.993(5) or (7), Florida statues, or individuals licensed as set forth in Section 489.105(3xf), (g), or (i) or an approved third parry. A written report of the results of the test shall be signed by the parry conducting the test and provided to the code official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. During testing: 1.Exterior windows and doors;,freplaee and stove doors shall be closed, but not sealed, beyond the intended weatherstripping or other infiltration control measures. 2.Dampers including exhaust, intake, makeup air, back draft and flue dampers shall be dosed, but not sealed beyond intended infiltration control measures. 3.1nterior doors, if installed at the time of the test, shall be open. 4.Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed. 5-Heating and. cooling systems, if installed at the time of the test, shall be turned off. 6.supply and return registers, if installed at the time of the test, shall be fully open. Testing Company Company Name: UES, Universal Engineering Sciences Phone: 772-924-3575 1 hereby verify that the above Air Leakage result re in accordance with the 2017 6th Edition Florida Building Code Energy_ Conservation requirements according,;6the cgypliance method selected above. Signature of Tester: Printed Name of Tester: Trevor LaPorte License/Certification #: 5064789 Date of Test: "'I / ( Z 0 2 2— Issuing Authority: BPI RECEIVED St. Lucie County Permitting