Loading...
HomeMy WebLinkAboutCertificate Of Termite Treatment 4-8-221/17/2022 County PCL Form St Lucie County Inspections ll�1 1 2300 Virginia Avenue Ft Pierce FL 34982 (722) 462- 2172 CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT PERMIT # r��� s^ ® 5346 San Benedetto Pl, Fort Pierce, FL 34951- �( JOB ADDRESS 4460 BUILDER Adams Homes South PEST CONTROL CONTRACTOR HomeTeam Pest Defense, Inc. PEST CONTROL LICENSE # JF0001886 RECENED APR 0 8 2022 St. Pjve County ermitting We, the undersigned, hereby certify that we have pretreated the above -described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet of area treated: 220 Chemicals used: Bora-Care Percentage of solution: .50% Total gallons used: 2.5 Date of treatment: 01/12/22 Time of treatment: AM FBC104.2.6 Certificate of Protective Treatment for prevention of termites. A weather resistant jobsite posting board shall be provided to receive ® Footing duplicate Treatment Certificates as each required protective treatment is ®1 st Treatment completed, providing a copy for the person the poermit is ttsuued to and ❑ Re another copyfor the building permit f les. The Treatment Certficate shall -treat provide the product used, identity of tee applicator, time and date of the ❑ Slab treatment, site location, area treated, chemical used, percent concentration ❑ 1st Treatment and number ofgallons used, to establish a verifiable record ofprotective treatiment. If the soil chemical bonier methodfor termite prevention is used, ❑ Re -treat final exterior treatment shall be completed prior to final building approval. ❑ Driveway St Lucie County requires for the final inspection for CO, a Permanent ❑ 1 st Treatment Sticker to be placed on the electrical panel box cover, listing all the ❑ Re -treat treatments and dates of applications. ❑ Pools ❑ 1 st Treatment ❑ Re -treat N Other Wood Stud Treatment ❑ 1 st Treatment ❑ Re -treat ® Perimeter for Final Inspection S' nature of exterminator NOTE: There must be a completed form far each required treatment or re -treatment and this form mast be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re -inspection fee charged https://ht-xb.pestpac.com/forms/countypcl_print_plain.asp?FormID=1938716&preprint=0&pdf= ill