HomeMy WebLinkAboutCertificate Of Termite Treatment 4-8-221/17/2022 County PCL Form
St Lucie County Inspections
ll�1 1
2300 Virginia Avenue
Ft Pierce FL 34982
(722) 462- 2172
CERTIFICATE OF TERMITE TREATMENT
CONSTRUCTION SOIL TREATMENT
PERMIT #
r��� s^ ® 5346 San Benedetto Pl, Fort Pierce, FL 34951-
�( JOB ADDRESS 4460
BUILDER Adams Homes South
PEST CONTROL CONTRACTOR HomeTeam Pest Defense, Inc.
PEST CONTROL LICENSE # JF0001886
RECENED
APR 0 8 2022
St. Pjve County
ermitting
We, the undersigned, hereby certify that we have pretreated the above -described construction for subterranean termites in accordance with the
standards of the National Pest Control Association.
Square feet of area treated: 220 Chemicals used: Bora-Care
Percentage of solution: .50%
Total gallons used: 2.5
Date of treatment: 01/12/22
Time of treatment: AM
FBC104.2.6 Certificate of Protective Treatment for prevention of termites.
A weather resistant jobsite posting board shall be provided to receive
® Footing
duplicate Treatment Certificates as each required protective treatment is
®1 st Treatment
completed, providing a copy for the person the poermit is ttsuued to and
❑ Re
another copyfor the building permit f les. The Treatment Certficate shall
-treat
provide the product used, identity of tee applicator, time and date of the
❑ Slab
treatment, site location, area treated, chemical used, percent concentration
❑ 1st Treatment
and number ofgallons used, to establish a verifiable record ofprotective
treatiment. If the soil chemical bonier methodfor termite prevention is used,
❑ Re -treat
final exterior treatment shall be completed prior to final building approval.
❑ Driveway
St Lucie County requires for the final inspection for CO, a Permanent
❑ 1 st Treatment
Sticker to be placed on the electrical panel box cover, listing all the
❑ Re -treat
treatments and dates of applications.
❑ Pools
❑ 1 st Treatment
❑ Re -treat
N Other Wood Stud Treatment
❑ 1 st Treatment
❑ Re -treat
® Perimeter for Final Inspection
S' nature of exterminator
NOTE: There must be a completed form far each required treatment or re -treatment and this form mast be on the job site to be picked up by the inspector at
time of each inspection or the scheduled inspection will fail and a re -inspection fee charged
https://ht-xb.pestpac.com/forms/countypcl_print_plain.asp?FormID=1938716&preprint=0&pdf= ill