Loading...
HomeMy WebLinkAboutLetter- Truss Design Package258 Southhall Lane, Suite 200 rF D S Maitland, Florida 32751 P: (321) 972-0491 1 F: (407) 880-2304 1 E: info@fdseng.com Website: www.fdseng.com ENGINEERING ASSOCIATES December 10, 2021 Building Department Ref: Lot: Subdivision: Address: Model: KA # Truss Company: Date of drawings: Job No.: Wind Speed: Exposure: Truss Engineer: Adams Homes Lot 33 Ph.3 Fort Pierce - Waterstone 8694 Waterstone Blvd. 2508 CR RHG 3CF 21-10553 Builders First Source 9/14/21 2867055 160 C Andrew Johnson To whom it may concern, We have reviewed the truss design package for the project referenced above. This truss package complies with the original design intent and the underlying structure will accommodate all indicated loads. We approve the truss package without comment based upon the truss layout and truss profiles supplied to us by the Truss Company with truss profiles sealed by the Truss Engineer. Please note, this review is only for general conformance with the design concept of the project. ��� Contractor or sub -contractor is responsible for matching all structural components and ,S.� shown in the construction documents. Contractor or sub -contractor is also responsible b confirming all quantities and dimensions; selecting appropriate fabrication processes an techniques; and coordinating work with all other trades. z�gaazz�aas9. Note: Truss ID's may vary. If you have any questions, please do not hesitate to call. Sincerely, 12/10/2021 Carl A. Brown, P.E. FL. # 56126 12/10/2021 Scott Lewkowski, P.E. FL. #78750 Luis Pablo To es, P.E. FL. # 87864 I FDS Engineering Associates, A TSG Company "Your Building Code Experts" C1 required under A06-A09T E7 E7 E7 7-00-00 E7 E7 E7 E7 E7 E7 E7 E7V E� EN 3/12 E7 a1 SIMPSON CONNECTOR SCHEDULE ROOF TRUSS Q ID MODEL ROOF UPLIFT SYMBOL 0 A` LUS24 895 1490 ILA' 0 A HTU26 3600 1555 ILA 0 B HTU28 4680 2140 1LB 0 C HTU26-2 3600 2175 1 LC 0 1 D I HTU28-2 14680 3485 1 1 to 0 E HGUS26-2 5320 2155 1 LE 0 F HGUS28-2 7460 3235 1LF 0 G HGUS26-3 5230 2155 1 Le 0 H HGUS28-3 7460 3235 1 w 0 J THJA-26 9100 4095 1 w 32 3 X 8 NOP CAUTIONI I! DO NOT ATTEMPT TO ERECT TRUSSES WITHOUT REFERRING TO THE ENGINEERING DRAWINGS AND BSC1431 SUMMARY SHEETS. ALL PERMANENT BRACING MUST BE IN PLACE PRIOR TO LOADING TRUSSES. (le. SHEATHING, SHINGLES, ETC.) ALL INTERIOR BEARING WALLS MUST BE IN PLACE PRIOR TO INSTALLING TRUSSES. REFER TO FINAL ENGINEERING SHEETS FOR THE FOLLOWING. 1) NUMBER OF GIRDER PLIES AND NAILING SCHEDULE 2) BEARING BLOCK REQUIREMENTS. 3) SCAB DETAILS (IF REQUIRED) 4) UPLIFT AND GRAVITY REACTIONS. WARNING Backcharges Will Not Be Accepted Regardless of Fault Without Prior Notification By Customer Within 48 Hours And Investigation By Builders First Source. NO EXECPTIONS, The General Contractor Is Responsible For All Connections Other Than Truss to Truss, Gable Shear Wall, And Connections. Temporary and Permanent Bracing, And Ceiling And Roof Diaphragm Connections. ROOF PITCH: 6/12 CEILING PITCH: 3112 TOP CHORD SIZE: 2 X 4 BOTTOM CHORD SIZE: 2 X 4 OVERHANG LENGTH: 16" END CUT: Plumb CANTILEVER: — TRUSS SPACING: 24" BUILDING CODE: FBC2020 BEARING HEIGHT SCHEDULE Hatch Legend 8'-0" aff 10'-0" aff E A „ C1 Adams Homes 0 B1 - PROJECT: Single Family 18F O E7VB 12 Va It D01S +❑ Reviewed and Approved ❑ Revise and Resubmit MODEL• 2608 CR 3CAR o 1 E /11 c ❑ Reviewed with Notations ❑ Not Reviewed (see explanation) ADDRESS: 8694 WATERSTONE BLVD D01S LOT I BLOCK: 33IPH3 B 10 Corrections or comments made on equipment submittals or shop drawings during this review do not relieve contractor from compliance with requirements of the drawings and specifications. SUBDIVISION: I WATERSTONE D01S This check is only for review of general conformance with the concept of the project and 14-04-00 6-08-00 10-04-00 BQ9 CITY: FT PIERCE general compliance with the information given in the contract documents. The contractor is D01 responsible for confirming and correlating all quantities and dimensions; selecting fabrication DRAWN BY• KSANCHEZ 808C o processes and techniques of construction; coordinating his work with that of all other trades and JOB # 2867055 o c c performing his work in a safe and satisfactory manner D E: 9/10/2021 SCALE: NTS Dot FDS ENGINEERING ASSOCIATES N O c ry 607 ry &PCAN DATE- 2021 D02 m Date: 12/10/2021 By: BH REVISIONS: B06C F01 Submittal No.: Project No.:21-10553 ProjectEng.: Luis Terre 1- B05 Project Name: Adams Homes - Ft. Pierce - Lot 33 Ph.3 2. 3. VERIFY ALL DIMENSIONS AND CEILING COMMONS PRIOR TO APPROVAL 4. B05 SOME CEILING FRAMING REGURED IN FIELD BY BUIDER MAIN YAN FORCE RESISTING SYSTMNVC NYERIOYnND ASC046 IMPORTAN ENCLOSED EXPOSURE CATEGORY C B05 OCCUPANCY CATEGORY II This Drawing Must Be �an oved And .r "Arm LOAD IN MPH Retuned Before Fabon Will Builders I WIND IMPORTANCE FACTOR T.O6 - 604 TRUSSES HAVE SEEN DESIGNED FOR A 10.0 PSF BOTTOM CHORD UVE LOAD Begin. For Your ProtecCheck All NONCONCURRENT WITH ANY OTHER UVELOADS Dimensions And Conditions Prior To m A royal Of Plan. ROOF LOADING FLOOR LOADING BO3 SIGNATURE BELOW INDICATES ALL NOTES AND DIMENSIONS HAVE 13-04-00 8-08-00 9-04-00 30-00-00 18-08-00 TCLL: 20 PSF TCLL• 40 PSF BEEN ACCEPTED. Plant Cit08 FL Road PSF 3563 60-00-00 BCDL: 10 PSF BCDL: 60 PSF By Date Ph.(813) 305-1300 Fax (813) 305-1301 TOTAL, 37 PSF TOTAL: 65 PSF DURATION: 1.26 DURATION: 1.00