HomeMy WebLinkAboutLetter Truss Design Package258 Southhall Lane, Suite 200
Maitland, Florida 32751
DP: (321) 972-0491 1 F: (407) 880-2304 1 E: info@fdseng.com
Website: www.fdseng.com
ENGINEERING ASSOCIATES
December 10, 2021
Building Department
Ref:
Lot:
Subdivision:
Address:
Model:
KA #
Truss Company:
Date of drawings:
Job No.:
Wind Speed:
Exposure:
Truss Engineer:
Adams Homes
Lot 46 Ph.3
Fort Pierce - Waterstone
8689 Waterstone Blvd.
2508 CR LHG 3CF
21-10554
Builders First Source
9/14/21
2867031
160
C
Andrew Johnson
To whom it may concern,
We have reviewed the truss design package for the project referenced above. This truss package
complies with the original design intent and the underlying structure will accommodate all
indicated loads. We approve the truss package without comment based upon the truss layout and
truss profiles supplied to us by the Truss Company with truss profiles sealed by the Truss
Engineer.
Please note, this review is only for general conformance with the design concept of the project.
Contractor or sub -contractor is responsible for matching all structural components and details
shown in the construction documents. Contractor or sub -contractor is also responsible for
confirming all quantities and dimensions; selecting appropriate fabrication processes and
techniques; and coordinating work with all other trades. 1%e a a s a 1 a d
Note: Truss ID's may vary.
If you have any questions, please do not hesitate to'call.
Sincerely,
12/10/2021
Carl A. Brown, P.E.
FL. # 56126
01 C10"
12/10/2021
ti v � •• S s
4 No 87 6
e
m
-J�:° STA E OF : •<C/�
�U
R 1 O P \���e
1 I✓d/ �aa�ea°
Scott Lewkowski, P.E. Luis Pablo Torres
P.E.
FL. #78750 FL. # 87864
FDS Engineering Associates, A TSG Company
"Your Building Code Experts"
C1
t` f0 u7 U to N_ �-
U Q Q Q
E7
O Q m
9 1 ff Li
U
E7
E7
E7
E7
7-00-00
�7
E7
E7
E7
E7
E7
E7
E7
E7V
E7V
lt E7V
3/1
oE7VA
V uE7VC
tVat,112
14-04-00
under
SIMPSON CONNECTOR SCHEDULE
ROOF TRUSS
Q
ID
MODEL ROOF UPLIFT SYMBOL
0
1 A-11
LUS24
895
490
ALI
0
A
HTU26
3600
1555
ALA
0
B
HTU28
4680
2140
ALB
0
C
HTU26-2
3600
2175
1Lc
0
D
HTU28-2
14680
13485
1 1LD
0
1 E
I HGUS26-2
5320
2155
1LE
0
F I
HGUS28-2
7460
3235
1LF
0
G
HGUS26-3
5230
2155
1 LG
0
H
HGUS28-3
7460
3235
1 w
0
J
THJA-26
9100
4095
1 L1
32
3 X 8 NOR
CAUTION!!!
DO NOT ATTEMPT TO ERECT
TRUSSES WITHOUT REFERRING TO
THE ENGINEERING DRAWINGS AND
BSCI-81 SUMMARY SHEETS.
ALL PERMANENT BRACING MUST BE
IN PLACE PRIOR TO LOADING
TRUSSES. lie. SHEATHING,
SHINGLES, ETC.)\
ALL INTERIOR (BEARING WALLS
MUST BE IN PLACE PRIOR TO
INSTALLING TRUSSES.
REFER TO FINAL ENGINEERING
SHEETS FOR THE FOLLOWING.
1) NUMBER OF GIRDER PLIES AND
NAILING SCHEDULE.
2) BEARING BLOCK REQUIREMENTS.
3) SCAB DETAILS (IF REQUIRED)
4) UPLIFT AND GRAVITY REACTIONS.
WARNING
Backcharges Will Not Be Accepted
Regardless of Fault Without Prior
Notification By Customer Within 48
Hours And Investigation By
Builders First Source.
NO EXECPTIONS.
The General Contractor Is Responsible
For All Connections Other Than Truss
to Truss, Gable Shear Wall, And
Connections. Temporary and
Permanent Bracing, And Ceiling And
Roof Diaphragm Connections.
ROOF PITCH: 6112
CEILING PITCH: 3/12
TOP CHORD SIZE 2 X 4
BOTTOM CHORD SIZE: 2 X 4
OVERHANG LENGTH: 16"
END CUT: Plumb
CANTILEVER: —
TRUSS SPACING: 24"
BUILDING CODE FBC2020
BEARING HEIGHT SCHEDULE
Hatch Legend
�8'-0" aff
10'-0" aff
BUILDER:
Adams Homes
Single Family
❑+ Reviewed and Approved ❑ Revise and Resubmit
L:
2608 CR 3CAR
❑ Reviewed with Notations ❑ Not Reviewed (see explanation)
kPROJECT:J
ESS: 8689 WATERSTONE BLVD
Corrections or comments made on equipment submittals or shop drawings during this review donot
BLOCK:
461PH3
relieve contractor from compliance with requirements of the drawings and specifications.
VISION:
I WATERSTONE
This check is only for review of general conformance with the concept of the project and
CITY: I FT PIERCE
general compliance with the information given in the contract documents. The contractor is
DRAWN BY: KSANCHEZ
responsible for confirming and correlating all quantities and dimensions; selecting fabrication
processes and techniques of construction; coordinating his work with that of all other trades and
JO 2867031
performing his work in a safe and satisfactory manner
A 09/1012021 1 SCALE: I NTS
FDS ENGINEERING ASSOCIATES
PLAN DATE: 1 2021
Date: 12/10/2021 By: BH
REVISIONS:
Submittal No.: Project No.: 21-10554 Project Eng.: Luis To s
1.
Project Name: Adams Homes - Ft. Pierce -Lot 46 Ph.3
2
3.
VERIFY ALL DIMENSIONS AND CEILING CONDITIONS PRIOR TO APPROVAL
SOME CEILING FRAMING REQUIRED IN FIELD BY BUILDER
4.
MAIN WIND FORCE RESISTING SYSTEWCt HYBMD WINO MCU46
IMPORTANT
ENCLOSED
EXPOSURE CATEGORY
OCCUPANCY CATEGORY u
This Drawing Must Be Approved And
wWIND IMPOORLOAD TTAANCCE FACTOR 1.00
Returned Before Fabrication Will
TRUSSES HAVE BEEN DESIGNED FOR A IGO PSF BOTTOM CHORD LIVE LOAD
Begin. For Your Protection Check All
NONCONCURRENT PATH ANY OTHER LIVE
LOADS
Dimensions And Conditions Prior To
Approval Plan.
SIGNATURE BELOW INDICATES ALL
ROOF LOADING
FLOOR LOADING
NOTES AND DIMENSIONS HAVE
TCLL: 20 PSF
TCLL: 40 PSF
BEEN ACCEPTED.
TCDL: 07 PSF
TCDL: 10 PSF
By Date
BCDL: 10 PSF
BCDL• 6 PSF
TOTAL:* 37 PSF
TOTAL: 65 PSF
DURATION: 1.25
DURATION: 1.00
4408 Airport Road
Plant City, FL 33663
Ph.(813) 305-1300
Fax (813) 306-1301