HomeMy WebLinkAboutBuilding Permit Checklist5
BOARD OF PLANNING & DEVELOPMENT
COUNTY COUNTY
SERVICES DEPARTMENT
COMMISSIONERS IF L • R I • A Building & Code Regulation
CHECKLIST FOR RESIDENTIAL/COMMERCIAL BUILDING PERMIT
11 ,n/� RECEIVED
Project Location: ��l.3 s�%��/JU �C� _ Date:
� �
Permit Number: Technician:
MAR 2022
FFHiIEIRr
Required Documents:
Application completely filled out with Notarized Signatures ............................
YesX —No—N/A
Sub Agreements with Notarized Signatures (prior to issuance) ..........................
Yes^ No N/A
Owner / Builder Affidavit (signed in. office) .................................................
Yes^ No N/A
Filled Land Affidavit (prior to issuance) ...................................................
Yes^ No N/A
Recorded Warranty Deed, if applicable ......................................................Yes No _ N/A X
Recorded Notice of Commencement (prior to issuance or inspection) ................. Yes VINO N/A
Utility Agreement or Payment Receipt (prior to issuance).................................Yesy No N/A
Vegetation Removal Application with copy of survey .....................................Yes_ No N/A
Plans, Calculations & Attachments ( 3 copies commercial, 2 copies residential)
Complete set of plans with Engineer / Architect Raised Seal ........................... Yes^ No N/A
Truss Plans reviewed and approved by Engineer / Architect ............................ Yes^ No N/A
Landscaping and Parking plan (under 6,000 sgft)......................................... Yes No — N/A X
Approved Site Plans........................................................................... Yes^ No N/A
Sealed Survey with Dimensions, Finished floor ........................................... Yes^ No N/A
Elevations and Setbacks.............................................................. Yesv No N/A
Plot plan with Setbacks............................................................... YesX No N/A
Health Department approval stamped on survey and floor plan ........................
Yes
No
N/A
Health Department Food
—711�
Establishment Permit stamped on floor plan ................
Yes
No
N/A
Manual "J" or Manual "N" Calculations....................................................
v
Yes^
No
N/A
Signed Energy Calculations (1 set original signatures & signed in 2 spots) ........... .Yes^
vv
No
N/A
Sealed Wind Load -Compliance Certification ...............................................
Yes^
No
N/A
Product Review Affidavit.....................................................................
Yes
No
N/A
Excavating a pond for fill:
Site plan showing 25-foot(minimum) set back from all property boundaries, size, Yes_ No_ N/A
shape, location and quantities of proposed excavation and fill areas
Side slopes not to exceed 4 to 1 to a minimum of 3 feet below water level......... Yes No N/A
Depth of excavation does not exceed 12 feet in depth .................................... Yes No N/A
If Hauling fill off site (excess of 100 cubic yards) you must have a mining permit Yes_ No_ N/A
Other:
Health Department Permit Paperwork.......................................................
Yes
No
N/A
CD for Fire Department if commercial or multi -family ...................................
Yes
No
N/A
DEP, SFWMD or Army Corp of Engineers (dock, seawall, SF on beach)............
Yes —No
—N/A
PoolBarrier Affidavit..........................................................................
Yes —No
—N/A
Ground Sign Landscape Affidavit (signs) ...................................................
Yes
No
N/A
Burn Rate for Sign Cabinets..................................................................
Yes —No
—N/A