Loading...
HomeMy WebLinkAboutLetter - Truss Design PackageI' 258 Southhall Lane, Suite 200 F D Maitland, Florida 32751 P: (321) 972-0491 1 F: (407) 880-2304 1 E: info@fdseng.com Website: www.fdseng.com ENGINEERING ASSOCIATES November 22, 2021 Building Department Ref: Adams Homes Lot: Lot 114 Bilk. Ph3 Subdivision: Fort Pierce - Waterstone Address: 5337 Lugo St. Model: 1820 B RHG KA # 21-10561 Truss Company: Builders First Source Date of drawings: 9/14/21 Job No.: 2866952 Wind Speed: 160 Exposure: C Truss Engineer: Andrew Johnson To whom it may concern, REVIEWED FOR CODE COMPLIANCE Sim LUCIE COUNTY S®CC We have reviewed the truss design package for the project referenced above. This truss package complies with the original design intent and the underlying structure will accommodate all indicated loads. We approve the truss package without comment based upon the truss layout and truss profiles supplied to us by the Truss Company with truss profiles sealed by the Truss Engineer. Please note, this review is only for general conformance with the design concept of the project. Contractor or sub -contractor is responsible for matching all structural components and details shown in the construction documents. Contractor or sub -contractor is also responsible for confirming all quantities and dimensions; selecting appropriate fabrication processes and techniques; and coordinating work with all other trades. Ilan. Note: Truss ID's may vary. If you have any questions, please do not hesitate to call. Sincerely, 11/22/2021 11/22/2021 Carl A. Brown, P.E. Scott Lewkowski, P.E. FL. # 56126 FL. #78750 FDS Engineering Associates, A TSG Company "Your Building Code Experts" Luis PabIV Torres, P.E. FL. # 878164 1 1i 3112 VLT 3/12 VLT 3112 VLT BRG X IA .nA 10'-0" CLG to .LIA 3112 VLT 3112 VLT 3/12 ODD SPACE ODD SPACE CONNECTORS SCHEDULE ROOF TRUSS m Ip MODEL ROOF UPLIFT SYM 0 A-11 LUS24 / JUS24 895 / 835 490 /510 ILK 7 A HTU26/ THD26 3600 / 3470 1555 / 2330 ILA 0 B HTU28 / THD28 4680 / 5040 2140 / 2330 ALB 0 C HTU26-2 / THD26-2 3600 / 3355 2175 / 2340 1 Lc 0 D HTU28-2 / THD28-2 1468015005 3485 / 2595 l<p 0 E HGUS26-2 / THDH26-2 5320 / 5245 2155 / 2340 1 LF 0 F HGUS28-2 / THDH28-2 7460 18025 3235 / 3330 1 IF 0 G HGUS26-3 / THDH26-3 5230 / 5245 2155 / 2340 1 Lo 0 H HGUS28-3 / THDH28-3 7460 / 7836 3235 / 4370 1 LH 0 J THJA26 / HJC26 9100 / 8990 4095 / 4370 1 W 3X8NCP El Reviewed and Approved ❑ Revise and Resubmit ❑ Reviewed with Notations ❑ Not Reviewed (see explanation) Corrections or comments made on equipment submittals or shop drawings during this review do not relieve contractor from compliance with requirements of the drawings and specifications. This check is only for review of general conformance with the concept of the project and general compliance with the information given in the contract documents. The contractor is responsible for confirming and correlating all quantities and dimensions; selecting fabrication processes and techniques of construction; coordinating his work with that of all other trades and performing his work in a safe and satisfactory manner 'FDS ENGINEERING ASSOCIATES Date: 11/22/2021 By: ES Submittal No.: Project No.: 21-10561 Project Eng.: Luis Project Name: Adams Homes - Fort Pierce - Waterston - Lot 114 Blk Ph3 VERIFY ALL DIMENSIONS MID CEJLING CONDITIONS PRIOR TO APPRWl SORE CEILING FRAM19NG REQUIRED IN FIELD BY BUODER IMN MO FORCE RESISTING SYSTEM NYSWD W ASCE7-16 ENCLOSEO E%POSURE CATEGORY C OCCUPANCY CATEGORY WIN LOAD 160 MPH WIND IMPORTANCE FACTOR 1.W TRUSSES HAVE SEEN DESIGNED FOR A 1MC FSF BOTTOM CHORD U VE LOAD NONCONCIIRiffM WITH ANY OTHER LIVE LOADS ROOF LOADING FLOOR LOADING TCLL• 20 PSF _ TCLL: 40 PSF TCDL: 07 PSF TCDL- 10 PSF BCDL: 10 PSF BCDL: 6 PSF TOTAL: 37 PSF TOTAL: 65 PSF DURATION: 1.26 DURATION: 1.00 IMPORTANT This Drawing Must Be Approved And Retumed Before Fabrication Will Begin. For Your Protection Check All Dimensions And Conditions Prior To Approval OF Plan. SIGNATURE BELOW INDICATES ALL NOTES AND DIMENSIONS HAVE BEEN ACCEPTED. By Date CAUTION!!! DO NOT ATTEMPT TO ERECT TRUSSES WITHOUT REFERRING TO THE ENGINEERING DRAWINGS AND BSC1431 SUMMARY SHEETS. ALL PERMANENT BRACING MUST BE IN PLACE PRIOR TO LOADING TRUSSES. (is. SHEATHING, SHINGLES, ETC.) ALL INTERIOR BEARING WALLS MUST BE IN PLACE PRIOR TO INSTALLING TRUSSES. REFER TO FINAL ENGINEERING SHEETS FOR THE FOLLOWING. 1) NUMBER OF GIRDER PLIES AND NAILING SCHEDULE 2) BEARING BLOCK REQUIREMENTS. 3) SCAB DETAILS (IF REQUIRED) 4) UPLIFT AND GRAVITY REACTIONS. WARNING Backcharges Will Not Be Accepted Regardless of Fault Without Prior Notification By Customer Within 48 Hours And Investigation By Builders First Source. NO EXECPTIONS. rho General Contractor Is Responsible For All Connections Other Than Truss to Truss, Gable Shear Wall, And Connections. Temporary and Permanent Bracing, And Ceiling And Roof Diaphragm Connections. ROOF PITCH: 6112 CEILING PITCH: 3112 TOP CHORD SIZE: 2 X 4 BOTTOM CHORD SIZE 2 X 4 OVERHANG LENGTH: IV' END CUT. Plumb CANTILEVER: — TRUSS SPACING: 24" BUILDING CODE: FBC2020 BEARING HEIGHT SCHEDULE Hatch Legend =8'-0" bearing ®10'4' bearing BUILDER: Adams Homes PROJECT: Single Family MODEL: 1820 B 3CAR DRESS: 6337 LUGO ST LOT / BLOCK: 1 114 PH3 SUBDIVISION: I WATERSTONE CITY: FT PIERCE DRAWN BY: KSANCHEZ 2866952 DATE: 09/13/2021 SCALE: NTS PLAN DATE: 2021 REVISIONS: 1. 2. 3. 4. 4408 Airport Road Plant City, FL 33563 Ph.(813) 305.1300 Fax (813) 305-1301