Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Project Information
Manual S Compliance Report Job: Lot 114 Phase 3 Waterston... wrightsoft® p p Date: Entire House By: ocs DEL AIR HTG, A/C & REFRIG. INC 531 CODISCOWAY, SANFORD,FL32771 Phore:407-333-2665 Fax:407-333-3853 Web: WWW.DELAIR.COMLicerse:CMC1249777 For: ADAMS HOMES 5337 Lugo Street, Fort Pierce, FL 34951 Cooling Equipment Design Conditions Outdoor design DB: 90.4 °F Sensible gain: 24881 Btuh Outdoor design W B: 77.4 OF Latent gain: 4767 Btuh Indoor design DB: 75.0 °F Total gain: 29647 Btuh Indoor RH: 50% Estimated airflow: 1167 cfrn Manufacturer's Performance Data at Actual Design Conditions Equipmenttype: SpIitASHP Manufacturer: Carrier Model: 25HBC537AP03+FX4DNB037L00 Actual airflow: 1167 cfm Sensible capacity: 28185 Btuh 113% of load Latent capacity: 5115 Btuh 1070/. of load Total capacity: 33301 Btuh 112% of load SHR: 85% Heating Equipment Design Conditions Entering coil DB: 76.4°F Entering coil WB: 63.2°F Outdoor design DB: 41.0 °F Heat loss: 28566 Btuh Entering coil DB: 69.5 °F Indoor design DB: 70.0 °F Manufacturer's Performance Data at Actual Design Conditions Equipment type: SpIitASHP Manufacturer: Carrier Model: 25HBC537AP03+FX4DNB037L00 Actual airflow: 1167 cfm Output capacity: 31707 Btuh 111 % of load Capacity balance: 36 °F Supplemental heat required: 0 Btuh Economic balance: -99 °F Backup equipment type: Elec strip Manufacturer: Model: Actual airflow: 1167 cfm , Output capacity: 6.8 kW 81 % of load Temp. rise: 18 °F Meets all requirements ofACCA Manual S. - A * wrightsoft® 2021-JU-2115U2:04 i� a •� me�� w���m�m Right-Sute®Uriversal2021 21.0.07 RSU23828 Page 1 terstore1820BGR1Lot114Pfs3Waterstone1820BGR.np Caic=W8 FrortDoorfaces: E Component Constructions Job: Lot 114 Phase 3 Waterston... - wrightsoft® p Date: Entire House By: DCS DEL AIR HTG, A/C & REFRIG. INC 531 CODISCO WAY, SANFORD, FL 32771 Phore:407-333-2665 Fax:407-333-3853 Web: W W W.DELAIR.COM Licerse: CMC 1249777 smiLeject Intormation For: ADAMS HOMES 5337 Lugo Street, Fort Pierce, FL 34951 Design Conditions Location: St Lude Cc Intl, FL, US Indoor: Indoor temperature (OF) Heating 70 Cooling 75 Elevation: 26 ft Design TD (OF) 29 15 Latitude: 28 ON Relative humidity (%) 30 50 Outdoor: Heating Cooling Moisture difference (gr/lb) 2.4 56.9 Dry bulb (OF) 41 90 Infiltration: Daily range (T) - Wet bulb (OF) - 15 (L 77 ) Method Construction quality Simplified Average Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions or Area U-value Insul R Htg HTM Loss Clg HTM Gain W Btuhftz1F ftz"F/Btuh BtuWt' Btuh Btu"Btuh Walls 1613-19ad: Knee wall, asphalt shingles roof mat, r-19 kw ins, 1/2" gypsum board int fnsh Blk wall, stucco ext, r--4 ext bd ins, 8" thk, 1/2" gypsum board int fnsh Partitions 12C-Osw: Frm wall, 1/2" gyp.bd ext, r-13 cav ins, 1/2" gypsum board int fnsh, ZM" wood frm, 16" o.c. stud n 20 0.049 19.0 1.42 28 2.59 52 e 20 0.049 19.0 1.42 28 2.59 52 s 20 0.049 19.0 1.42 28 2.59 52 w 20 0.049 19.0 1.42 28 2.59 52 all 80 0.049 19.0 1.42 114 2.59 207 n 534 0.201 4.1 5.83 3113 4.06 2168 e 127 0.201 4.1 5.83 739 4.06 515 s 611 0.201 4.1 5.83 3561 4.06 2481 w 317 0.201 4.1 5.83 1846 4.06 1286 all 1589 0.201 4.1 5.83 9260 4.06 6450 270 0.091 13.0 2.64 713 1.31 354 Windows 2A-2ov: 2 glazing, clr low-e outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/8" n thk; NFRC rated (SHGC=0.23); 50%drapes, medium; 1.33 ft overhang (3.2 It window ht, 0.8 it sep.); 6.67 It head ht 2A-2ov: 2 glazing, clr low-e outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/8" n thk; NFRC rated (SHGC=0.23); 50% drapes, medium; 1.33 ft overhang s (5.3 ft window ht, 0.8 ft sep.); 6.67 it head ht w all 2A-2ov: 2 glazing, clr low-e outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/8" e thk; NFRC rated (SHGC=0.21); 50%drapes, medium; 1.33 ft overhang (5.3 It window ht, 1 ft sep.); 6.67 it head ht 2B-2fv: 2 glazing, dr low-e outr, air gas, vnl frm mat, dr innr, 1/4" gap, 1/8" e thk; NFRC rated (SHGC=0.31); 9.33 ft overhang (1.4 ft window ht, 0 ft sep.); 6.67 It head ht 2B-2fv: 2 glazing, dr low-e outr, air gas, vnl fan mat, dr innr, 1/4" gap, 1/8" e thk; NFRC rated (SHGC=0.31); 9.33 ft overhang (6.7 ft window ht, 1.5 ft sep.); 6.67 it head ht 7 0.330 0 9.57 66 8.52 59 49 0.330 0 9.57 469 8.52 418 49 0.330 0 9.57 469 8.52 418 33 0.330 0 9.57 313 22.4 731 131 0.330 0 9.57 1251 12.0 1567 33 0.330 0 9.57 313 21.4 698 7 0.330 0 9.57 67 11.6 81 13 0.330 0 9.57 128 13.2 176 , -rk wrilghtsc ft- 2021-Jt1-21 15:02:04 C�" .a„•k•ia=.�.• u. «.gym m Righd-StiteOUriversal 2021 21.0.07 RSU23828 Page 1 14C terstore1820BGR1Lot114Phs3Waterstore1820BGR.W Calc=NUB FrortDoorfaces: E 10C-v: 2 glazing, dr low-e outr, air gas, vnl frm mat, dr innr, 1/4" gap, 1 /8" w thk; NFRC rated (SHGC=0.70); 12 ft overhang (6.7 ft window ht, 0.5 ft sep.); 6.67 ft head ht 2A-2ov: 2 glazing, clr low-e outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/8" w thk; NFRC rated (SHGC=0.23); 50% drapes, medium; 12 ft overhang (5.3 ft window ht, 0.5 ft sep.); 6.67 ft head ht Doors 11 JO: Door, mtl fbrgl type e Ceilings 16B-30ad: Attic ceiling, asphalt shingles roof mat, r-30 ceil ins, 1/2" gypsum board int fnsh Floors 22A-tpl: Bg floor, light dry soil, on grade depth 18 0.550 0 16.0 285 16.2 289 33 0.330 0 9.57 313 8.52 279 20 0.600 6.3 17.4 350 17.6 353 1835 0.032 30.0 0.93 1703 1.69 3100 212 0.989 0 28.7 6080 0 0 t - wrightsc ft- 2021-JU-21 1592:04 rta•ie••w 2x c mo Rght-Srite®Uriversal2021 21.0.07 RSU23828 Page 2 terstore1820BGR\Lot114Phs3Waterstone1820BGR.nQ Calc=W8 FrortDoorfaces: E -- wrightsoft® Project Summary Entire House DEL AIR HTG, A/C & REFRIG. INC 531 CODISCO WAY, SANFORD, FL 32771 Phone:407-333-2665 Fax:407-333-3853 Web: W WW.DELAIR.COM Licerse: CMG 1249777 Job: Lot 114 Phase 3 Waterston... Date: By. DCS For: ADAMSHOMES 5337 Lugo Street, Fort Pierce, FL 34951 Notes: JA8-18-15 Change to 3.0 ton 2/16/16 S. Finch L. S. 7-21-21 VW K Design • • Weather: St Lude Co Intl, FL, US Winter Design Conditions Summer Design Conditions Outside db Inside db 41 OF 70 °F Outside db Inside db 90 75 OF Design TD 29 OF Design TD 15 OF Daily range L Relative humidity Moisture difference 50 57 % grAb Heating Summary Sensible Cooling Equipment Load Sizing Structure Ducts 24346 Btuh Structure 19104 Btuh Central vent (0 cfm) 4220 Btuh 0 Btuh Ducts Central vent (0 cfm) 5777 0 Btuh Btuh none Humidification 0 Btuh (none) Blower 0 Btuh Piping 0 Btuh Equipment load 28566 Btuh Use manufacturer's data y Infiltration Rate/swin multiplier Equipmen�sensble load 1.00 24881 Btuh Method Construction quality Simplified Average Latent Cooling Equipment Load Sizing Fireplaces 0 Structure 3364 Btuh Ducts 1403 Btuh Central vent (0 cfm) 0 Btuh Area (ft2) Heating Cooling 1820 1820 (none) Equipment latent load 4767 Btuh Volume (ft3) 18350 18350 Air changes/hour Equiv. AVF (cfm) 0.38 0.20 116 Equipment Total Load (Sen+Lat) 29647 Btuh 61 Req. total capacity at 0.75 SHR 2.8 ton Heating Equipment Summary Cooling Equipment Summary Make Carrier Trade CARRIER Make Carrier Trade CARRIER Model 25HBC537AP03 AHRI ref 204837926 Cond 25HBC537AP03 Coil FX4DNB0371-00 Efficiency 8.5 HSPF AHRI ref 204837926 Efficiency 12.5 EER,16 SEER Heating input Heating output 34600 Btuh Qa 47°F Sensible cooling Latentcooling 26250 8750 Btuh Btuh Temperature rise Actual airflow 27 OF 1167 cfm Total cooling Actual airflow 35000 1167 Btuh cfm Airflowfactor Static pressure 0.041 cfm/Btuh 0.40 in H2O Air flow factor Static pressure 0.047 0.40 cfm/Btuh in H2O Space thermostat Capacity balance point = 36 °F Load sensible heat ratio 0.84 Iput = 7 kW, Output = 23253 Btuh, 100 AFUE Calculations approved byACCA to meet all requirements of Manual J 8th Ed. t � wrightsoft- 1 m Right-Srite®Uriversal2021 21.0.07 RSU23828 2021-Jri-21 15:02:04 �`...terstore182013GRIot114PFs3Waterstone1820BGR.np Calc=W8 FrortDocrfaces: E Page -- wrightsoft- Right-JO Worksheet Entire House DEL AIR HTG, A/C & REFRIG. INC 531 CODISCO WAY SANFORD, FL32771 Phone:407-333-2665 Fax:407-333-3853 Web.WWW nFI AIM r)NAI i,.e—•�U ,— 1 -, Job: Lot 114 Phase 3 Waterstone 1... Date: By: DCS 1 Room name 2 Exposed vdI Entire House BDRM2 3 Room height 212.0 ft 10.0 ft 36.0 8 4 Room dimensions d 10.0 It heat/cool 5 Room area 1835.0 13.0 x 13.0 ft ft2 169.0 112 Ty Construction number U-value (Btuh/ft2--q Or HTM (BtuhRt2) Area (ft2) Load Area (ft) Load or perimeter P (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/PiS Heat Cool 6 W__ 1661.9actta�� Blk vdl, stucco ext 0049'n_1.42 5.83 _ ?5" 9 2.. ?- 20.. y �20 3113 2A 2ov 0.201 0230 n n 957 4.06 852 590 7 534 2168 100 100 4 583 406 11 _ W �_ 2A 2ov_x� �_� _ 16B 19.ad _ y 0,330 0 049 n e. 9,57 .� 852 2 59 49 _20 0 0 66 469 59 �� 418 0 0 " __.0 0 T 0 0 _ 0 0 0 Blk wall, stucco ext 2A-2ov 2B-2fv 0.201 0.330 0,330 ^ a a _,1.42 5.83 957 _ 4.06 21.36 �__ 200 33 _ 20 �� 127 1 28 __w 739 313 52 _4 ' 515 698 w.___.__-_0 0 O 0,00 0 0 0 0 2B-2fv 0.330 a a 9.57 957 11.58 13.17 7 13 7 12 67 128 81 176 0 0 0 0 _w W,w y! 11J0 16B^19ad_ �a . Blk u�all, stu000 eM _0600 0049 0.201 a e S s 1740 _1.42 5.83 1758 259 4.06 20 w _,c20 660 20 - 20. ' y ' 611 350 . w 28 353 - - 52 M� 2481 0 0 p vw130 0 0 3 0 0 O 0 0 _,0 — L—G 2A 2ov 0.330 s 957 8.52 49 49 3561 130 758 528 W_Y 16B 19ad v Blk wall, stucco ext µ' 10c-v 0049 0.201 0550 ::�! w w 1,42 -' 5B3 1525 - _;259 4.06 1620 _ter, 20 400 18 r C 20 - 317 469 _ __.28 1846 _ 418 1286 _ 0 — 13C 0 r 114 0 .,_.0_ _. 663 0 : 0 461 2A-2ov 2A-2ov 0230 w 957 22.36 33 18 2 285 313 289 731 0 16 0 1 0 156 0 365 �¢ P C J2C Osw y 16B 30ad 0.330 0091 w 957 _ 2,64 852 131 33 , 270 33 270 313 713 279 _ . _ _7 35_4 _ , 0 0 _ 0 0 F 22A I Yy _ 0 032 0 93 1 89 1835 1835 1703 ��0080157 3100 _ 169 169 _ _ 157 286 _ _ - _ c) AED excursion r12 905 113 Envelope loss/gain 20642 14519 3349 2160 a) Infiltration b) Room ventilation 3704 1035 691 193 p p 0 0 13 Internal gains: Oocu tsCa 230 P� 5 1150 0 Appliances/other 2400 p 0 Subtotal (lines 6 to 13) 24346 19104 4040 2353 Less external load Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 0 0 0 0 15 Duct loads 17% 30% 24346 4220 19104 5777 17% 30% 4040 700 2353 711 Total room load Airrequired(cfm) :K�i 4194 30g4 Calculations approved byACCAto meet all requirements of Manual J 8th Ed ,� -�� wr_ YgtitsoR ,&per Right-SuteOUriversal2021 21.0.07 RSU23828 2021-JtJ-21 15 02:04 terstore1820BGR\Lot114Pfs3Waterstone1820BGR.rLp Calc=NU8 FrortDoorfaoes: E Page - - wrightsoft3 Right-M Worksheet Entire House DEL AIR HTG, A/C & REFRIG. INC 531 CODISCO WAY, SANFORD, FL 32771 Phone:407-333-2665 Fax:407-333-3853 Web: W W W.DELAIR.COM Ucerse: CMC 1249777 Job: Lot 114 Phase 3 Waterston 1... Date: By: DCS 1 2 Room name Exposed wall BATH 2 BDRM 3 3 4 Room height Room dimareensions 6.0 ft 10.0 ft heat/000l 13.0 ft 10.0 ft heaV000l 5 Room 13.0 x 6.0 ft 78.0 13.0 x 13.0 ft ftz 169.0 112 Ty Con on number U-value (Btuh/ftzf Or HTM Area (ft2) Load Area (ft2) Load or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 16 E19ad ___ __ Blk Hall, stucco ~ 0 049 �� �1.42 �_-259 _ n n 0 ext 2A 2ov 0.201 0.330 5.83 957 4.06 852 0 0 0 0 0 0 0 0 0 »� 0 11 V11 2A 2ov 16619ad,__ 0.330 - 0049 -,n _. e_ 957 142 852 259 _0 0 0 0 _ 0 0 0 _.. 0 0 0 _____ _- _ 0 0 _ 0 523 9.57 0 0 —~ 0 0 0 0 0 Blk Hall, stucoo e) 2A-2ov 0.201 0230 a a 4.06 21.36 0 0 0 0 0 —_.0. 0 2B-2N 0.330 a 957 11.58 0 0 0 0 0 26-21V 0 0 0 0 0 0 11 JO 0.330 a 9.57 13.17 0 0 0 0 0 0 0 0 W Vf/ Blk MI, stu Blk wall, stucco e)d 0.600 0201 a s 17.40 _ 5.83 17.58 „-.. _ 259 4.06 0 _ - 0 — 60 0 w 0 ._ . , 0 0 0 0 _.�... YO 0 �y ."0 0 _ w-0. 60 350 —J 244 __ 130 L- G 2A-2ov 0.330 114 663 461 Blkwall,stuccoext 0.201 s w 9,57 _.._ 1,42 5.83 8,52 ._�_ 2.5.9 4.0-6 _ 0 w 0 0 0 0 0 0 0 _ 0 V 6 __ .._ 16 _ 0 -___.__.0 16 �___. _ 156 . 139 0 10C-v 0550 w 1525 1620 0 0 0 0 2A-2ov 0 0 0 0 0 0 0 2A-2ov 0.330 w 9.57 22,36 0 0 0 0 0 0 0 0 �— P d _ C 12C Osnrµ;_: _ 16B 30ad 0.330 0091 w -_ 957 _264 852 __v. 0 0 0 0 0 0 0 0 - _ _ �0 032 —0.93 1 69 _78 78 72 72. 132 _ 169 169 _ 169 13 _157 ,.. -. ..., _... - ......_ -. ,-.....,m _ _ .._.__--.., , 6 c) AED excursion -19 44 Envelope loss/gain 594 357 1349 842 12 a) Infiltration b) Room ventilation 115 32 249 70 0 0 0 0 13 Internal gains: Occupants @ 230 0 0 0 Applianoesrother 0 0 0 Subtotal (lines6 to 13) 709 389 1598 912 Less extemalload 0 0 Less transfer 0 0 Redistribution 0 0 0 0 0 0 14 15 Subtotal Duct loads 709 389 0 1598 0 912 17% 30% 123 118 17 % 30 % 277 276 Total room load Air required (dm) 832 506 1875 1187 34 24 77 56 Calculations approved bvACCA to meet all requirements of Manual J 8th Ed - wr➢gt�tsoft^ R gk-Sute®Udversal 2021 21.0.07 RSU23828 2021-JU-21 15:02:04 terstorel820BGR\Lotll4PIs3Waterstorel82OBGR.rLp Calc=MJ8 FrontDoorlaees: E Page 2 -�- wrightsoft° Right-M Worksheet Entire House DEL AIR HTG, A/C & REFRIG. INC 531 CODISCO WAY SANFORD, FL 32771 Phone:407-333-2665 Fax:407-333-3853 Web: W WW.DELAIR.COM Licerse: CMC 1249777 Job: Lot 114 Phase 3 Waterston 1... Date: By: DCS 1 2 Room name Exposed wall DINING/FOYER DENBDRM4 3 Room height 25.0 ft 10.0 ft heaU000l 31.0 ft 10.0 ft heaUmol 4 5 Room dimensions Room area 1.0 x 276.0 It 13.0 x 13.0 It 276.0 ftz 169.0 ftz Ty Construction number U-vafue (BtuhHtz Or HTM (Biuh/ftz) Area (ftz) or Load Area (ftz) Load. perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/PB Heat Cool Gross N/PVS Heat Cool 6 4 Blk wall, stucco _,b_259 �. - w _ 0 ,.. a_:.0 . .. �_ ___ ,_._ 0_ __ 0 _ _ : _ 0 eM 2A 2ov 0201 0.330 n n 5.83 957 4.06 852 0 0 0 0 0 0.--- 0 50 50 291 203 11 W_ 2A 2ov 1.6B 19ad.. __ 0330 -_—0049 - ~ n ..;_e,_ 9.57 142 852 _ - 0 _ p T y 0 _____.. 0 0 0 M��172 0 _ 0 _:. : Q 0 :0 0 0 0 0- 0 0 0 Blk Hell, stucco ext 2A-2ov 0.201 a 588 4.06 70 30 120 _ 130 �~ 97 _- 567 395 2B-2fv 0.330 0,330 a a 957 957 2126 11.58 0 7 0 7 0 0 33 1 313 698 2B-2fv 0,330 a 957 13.17 13 12 67 128 81 176 0 0 0 0 0 0 0 0 W 11JO _ 16B-19ad � 0600 0049 a sw 1740 142 1758 259 20 20 350 353 0 0 0 0 µ Blkvell stuccoe��- 2A 2ov 0201 s 5b3 4.06 110 77 451 314 130 130 758 528 W --= - _16&19ad_ �`w_ 0.330 .�_ .:0049 s ;�w 957 _ 142 852 -T259 33 _.� _0 33 �:..._. _ 313 .__ _-. �0 _ 279 T_- -0 0 0 _ 0 Blk Heli, stucco eM 10C-v 0201 0550 w w 5.83 15.95 4.06 1620 0 0 _0 0 0 0 0 - 0 0 - 0 0 0 0 0 0 0 0 2A-2ov 0,330 w 9.57 22.36 0 0 0 0 0 0 0 0 P 2A 2ov 12C Osw 0.330 0091 w 957 8 52 0 0 0 0 0 0 0 C _ _ 16&30ad 0 185 .,0 _0 r U9 . _. 02 0989 0 $68 276 276 25 717 169 - 16-9 _31 17 =M9 r 286F_ _92._ 466 �w_ s .- - 6 c) AED excursion -102 102 Envelopeloss/gain 2638 1779 2975 2211 12 a) Infiltration b) Room ventilation 345 97 595 166 0 0 0 0 13 Internal gains: Occupants@ 230 1 230 0 0 Applianoes/other 0 0 Subtotal (lines6 to 13) 2984 2106 3570 2377 Less external load 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 15 Subtotal Duct loads 2984 2106 0 3570 0 2377 17% 30%1 517 637 179/6 30%1 619 719 Total room load Air required (cfm) 3501 2742 4189 3096 143 129 171 145 Calculations approved bvACCA to meet all requirements of Manual J 8th Ed CP. w�rigft,>tsoft� Jr1-2115,02:04 Right-Srite®Uriversal 2021 21.0.07 RSU23828 2021- Page 3 terstore1820BGR\Lot114Pts3Waterstone1820BGR.rup Calc=M18 FrortDoorfaces: E - wrightsoft° Right-JO Worksheet Entire House DEL AIR HTG, A/C & REFRIG. INC 531 CODISCOWAY,,SANFORD,FL32771 Phore:407-333-2665 Fax:407-333-3853 Web: WWW.DELAIR.COMLicense:CMC1249777 Job: Lot 114 Phase 3 Waterston 1... Date: By: DCS 1 2 Room name Exposed wall FAMILY RM IVISTR BDRM 3 Room height 13.0 ft 10.0 ft heat/cool 41.0 ft 10.0 ft heaUmol 4 5 Room dimensions Room area 13.0 x 22.0 It 14.0 x 17.0 ft 286.0 ft2 238.0 ft2 Ty Construction U-value Or HTM Area (ft2) Load Area (ft2) Load number (Btuh/itz-cq (Btuh/ t2) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/Pr5 Heat Cool 6 W._ _ W Il_�_G __. 16&19acj. ; BIk wall, stucco e# 2A-2ov V`'0049 0.201 _0c n r _ 1;42 5.83 - _: _259 4.06 - 170 1 b4 898 �y4 624 0 0 0 0 0230 n 957 852 0 0 0 0 0 0 0 0 11 W_,•_,i_ 2A 2ov �.� 16B•19ad, — _. _0.330 0049 M �0201 n _ems 957 1♦42 _.,5.83 852 ,_,-;259 �;;�;�20 0 0 ;_.:...`:._20 _ 0 28 _ 0 _'.-;, _ 16 � -0 0 ____......._ 0 156 -�_-.,. ,0 139 Blkxell,stucco ext 2A-2ov 0330 a a 957 4.06 2126 0 0 p 0 p 0 _..�52 0 0 0 0 0 0 0 .__.,._0 26-21v 0330 a 957 11.58 0 0 0 0 2B-2fv 0 0 0 0 0 0 0.330 a 957 13.17 0 0 0 0 0 0 0 0 VN 11JO &19ad _ _�" BIk wall, siucoo ext 0600 -- -_0049 0201 a - 5 s 1740 __.`t, 2 5.83 1758 _._ ,,25952 4.06 0 0 0 0 0 0 0 0 0 __. 0 0 .. 0, _ 0 .. 0 100 406 I—G 2A-2ov 0330 s 957 852 0 0 0 0 100 683 16Bw1_9ad�_ _� _4 BIk well, stucco ext 10C-v __. ' _ _ 004 0201 0550 w w w 1. 2 µ' 5.83 15.95 259 4.06 1620 20 130 18 ._ ",. 20 w�~ 479 18 463 285 .^ 3E3 0 _ t_ 0 140 0 . 0 .__m, 124 0 _O' -'� ' 721 0 -r __-_O _ 502 2A-2ov 0330 w 957 2226 0 0 0 289 0 0 16 0 1 0 156 0 365 _ 2A-2ov 0330 w ,957 852 33 33 313 279 0 0 0 P__ _ ; C :12,. Osw . ,__>, __ 16B 30ad_ 2,64 _.'__ 131 — 0 0 0 M0 Yw _ 0.032 __ 0989 _ _ _ 0 93 26.68 _i 69 _-�O,Oq 286 _. 286 286 ;` 13 __. _ _ ___ 265 _ 373 . _ 483 ` w ..__ 0 _•. _ 238 _ y _238 _ _ 238 _ 41 221 1176 _ 402 6 c) AED exwrsion 1033 19 Envelope losstgain 1813 2614 3909 2457 12 a) Infiltration b) Room ventilation 403 113 787 220 0 0 0 0 13 Internal gains: Occupants@ 230 3 690 1 230 Applianees/other 0 600 Subtotal (lines 6 to 13) 2216 3416 4696 3507 Lessextemal load 0 0 Lesstransfer 0 0 0 0 Redistribution 0 0 0 0 14 15 Subtotal Duct loads 2216 3416 0 4696 0 3507 17% 30% 384 1033 17% 30% 814 1061 Total room load Air required (cfm) 2600 4450 5225 4214 106 209 225 14 Calculations approved bvACCAto meet all requirements of Manual J 8th Ed -- wr•➢ghtsoft^ Right-Sute®Uriversa12021 21.0.07 RSU23828 2021-JU-21 15:02:04 terstorel820BGR\Lotll4Phs3Waterstoml82OBGR.rLp Calc=NU8 FrortDoorfaces: E Page - wrightsoft® Right-JO Worksheet Entire House DEL AIR HTG, A/C & REFRIG. INC 531 CODISCO WAY SANFORD, FL 32771 Phore:407-333-2665 Fax:407-333-3853 Web: W WW.DELAIR.COM Uoerse: CMC 1249777 Job: Lot 114 Phase 3 Waterston 1... Date: By: DCS 1 Room name M BATH M WIC 2 ExIcosed Hall 12.Oft Oft 3 4 Room height Room dimensions 10.0 ft heaV000l 10.0 ft heaV000l 5 Room area 1.0 x 119.0 ft 7.0 x 7D ft 119.0 ftz 49.0 ftz Ty Construction U-value Or HTM Area (ft2) Load Area (ft) Load number (Btuh/ftz9 (Btuh/ft2 or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/PIS Heat Cool 6 1N �.._ 16f319ad_ , ww 0049' �n_ _ 1..42 2- __ ., 0 _ 0 __. 0 _ .M 0 0 :. , 0 - O, Blk Hell, stucco ext 2A 2ov 0.201 0230 n n 5.83 957 4.06 852 120 7 113 0 659 66 _ .� 459 0 59 0 -� - 0 0 2A 2ov _ 0.330 n 9.57 _ 852 0 0 0 0 0 0 0 0, 0 0 0 0 11 W4- i6B•19ad _._:__ Blk Hell, stucco e:d _. 2A-2ov 0049Ye_ �0.201 0.330 a a _1..42 5.83 957 ..�259 4.06 21.36 T'Q 0., - 0 0_. 0 _ _ 0 ._ 0. JT 0 - 0 -O ~ 0 w _,. v �0 0 0 2B-2fv 0 0 0 0 0 0 0 0 0.330 a 957 11.58 0 0 0 0 0 0 0 0 2B-2fv 0.330 a 957 13.17 0 0 0 0 0 0 0 0 11J0 0600 a 17.40 1758 0 0 0 0 0_ 0 0 0 W v _ V►/ 16B 19ad• _ Blk Hell, stuccoext 0049:s'. 0201 s _, �1..42 5.83 9 - 4.06 _ :�0 0 is 0 0 .. 0 0 , _ _8 �.:0 0 - 0 r �__ _0 ~ - 0 -G 2A 2ov 0.330 s 957 852 0 0 0 0 0 0 W -._ ;16619ad Blk oiell, stucco eM 0049 0.201 _ w w __ 1.42 5.83 _ _. 259 4.66 _.w. ;, 0 _ _ 0 .. __ 0�._ "' 0 �- 0 0 _ _ 0 _..-Q 0 0 0 0 0 _ 0 0 0 10C-v 0550 w 15.95 1620 0 0 0 0 0 2A-2ov 0,330 w 957 22.36 0 0 0 0 0 0 0 0 0 0 0 2A 2ov 0.330 w_ 957 852 0 0 0 0 0 0 0 0 P ..:;_: C •12C Osw_;,, ..- 0091 - ,.2,64 1..31 ��.0 0 0 _ 0 __ p - �. 0 __ -0 F __;_ 161330ad_ _ - :22A,>p�,_.:;,___•------ 0 - 032 . �._.:_0.889 - ._.�� 093 ...:.28,68 19 -n 6 _ _-��0.00 119 _.._..�.119 119 .�.,,_.�.__12 _ -•_� 110 _.�...�;.�.344 201 49 n._ _._�. _� 0 _,.._,_ _..�49._.w_..>�._.0 w�0 _ _ 49 45 _,_..WW_�0 _ 83 ., . �_-0 - - n .,... 77 ._...,_..._. ..._ ._....w__.,. a ._-.. 6 c) AED excursion -36 -4 Envelope loss/gain 1180 683 45 79 12 a) Infiltration 230 64 0 0 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants@a 230 0 0 0 0 Appliances/other 0 0 Subtotal (lines 6 to 13) 1410 747 45 79 Less wdemal load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 14 Subtotal 1410 747 45 79 15 Duct loads 17 % 30% 244 226 17 % 30 % 8 24 Total roam load Air required (cfm) 1655 973 53 103 68 46 2 5 Calculations approved bvACCA to meet all requirements of Manual J 8th Ed CA - wrigF�tsoft ^ Right-Sute®Uriversal 2021 21.0.07 RSU23828 2021-JU-21 15:02:04Page 5 terstone1820BGR\Lot114Pfs3Waterstore1820BGR.np Calc=MJ8 FrortDoorfaces: E - wrightsofta Right-JO Worksheet Entire House DEL AIR KrG, A/C & REFRIG. INC 531 CODISCO WAY, SANFORD, FL 32771 Phone: 407-333-2665 Fax:407-333-3853 Web: W W W.DELAIR.COM License: CMC 124Q777 Job: Lot 114 Phase 3 Waterston 1... Date: By: DCS 1 2 Room name wall Krl-CHENMOOK LAUNDRY 3 4 Room height Room dimensions 29.0 it 10.0 ft heaU000l 6.0 ft 10.0 ft heal/cool 5 Rom area 1.0 x 246.0 ft 246.0 ftz 6.0 x 6.0 ft 36D ftz Ty Construction number U-value (Btu hHtz- Or HTIVI (Btuh/ftz) Area (ft') Load Area (ft2) Load or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat I Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 1N_ 166 79ad-_ Blk wall, stu000 . _ _ 0049 '-p_ 1,42 5.83 ._,_2..:59 � 0 _0 : r._ 0 _ eid 2A 2ov 0.201 0.330 n n 957 4.06 8.52 150 117 684 476 0 0 0 0 2A 2ov _ 16&19ad .. 0330 0049 _ n 9,57 1,42 852 __ 33 0 0 _ 0 _ 313 0 0 _ 279 0 _ _ ,0 _ 0 0 0 _ 0 0 _0 0 0 Blk well, stucco e)d 2A-2ov 28-21v -- 0.201 0.330 0.330 _e_ a a _ w _ 5.83 957 ,._259 4.06 21.36 _ 0 0 0 w, 0 0 0 -0 0 0 0 0 0 0 0 0 0 0 0 a 957 11.58 0 0 0 0 0 0 0 0 2B-2fv 11J0 0,330 a 957 13.17 0 0 0 0 0 0 0 0 W "- - t-GBIk __� _16 wall, s well, stucco eM __ 0600 __ 0049 0.201 a s - s 17.40 _ _ -- 1.92 5.83 1758 259 4.06 0 .__ 0 0 _ 0 __ . 0 0 0 _a 0 Y' l M0 0 - 0 0 - 0 ' 0_ . _ . _. _..,__0 6 0 ,. _ 0. _ 0 2A-2ov 0.330 s 957 852 0 0 0 0 0 0 0 -_ e -- BIk well, stucco e)d 10C-v - 0049._._v259 0201 0550 w w 5.83 15.95 4.06 1620 0 0 0 0 w-_ _....__.. 0 0 0 Y _ _ 0 0 0 .0 _ • _.� _ 0 0 0--0 0 0 0 2A-2ov 0,330 w 957 222 0 0 0 0 0 0 0 0 0 0 0 0 2A-2ov _ 0,330 w 957 852 0 0 0 0 0 0 0 0 P16B.._ C 16B 30ad_ _ _ _ 2,64 M 131. _._-_140 ,vim. 140 - F.__.._._ 22Aipl_.._:u_: 0032 0,93 1,69 0.00 246 24ti _246 29 228 �� 832 ___ 416 0 ., _._ _ 36 _-. _ 36 •, 36 v 33 .- :6 . r 6 c) AED excursion -122 -34 Envelope loss/gain 2426 1232 364 105 12 a) Infiltration 288 80 0 0 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants pa 230 0 0 0 Appliances/other 1200 0 600 Subtotal (lines 6 to 13) 2714 2512 364 705 Less external load 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 15 Subtotal Duct loads 2714 2512 0 364 0 705 17% 30% 470 760 17% 30% 63 213 Total room load Air required (cf n) 3184 3272 417 918 18 130 153 17 Calculations approved bvACCA to meet all requirements of Manual J 8th Ed ,C -�- wrigF�tso`ft^ 2021-Jt1-21 15U2:04 �� Right-Srite®Universal 2021 21.0.07 RSU23828 Page 6 terstone1820BGRtLot114Phs3Waterslore18208GR.rLQ Calc=W8 FrortDoorfaces: E -- wrightsoft® Duct System Summary Job: Lot 114 Phase 3 Waterston... Date: Entire House By: DCS DEL AIR HTG, A/C & REFRIG. INC 531 CODISCO WAY, SANFORD, FL 32771 Phone:407-333-2665 Fax:407-333-3853 Web: W WW.DELAIR.COM Licerse: CIVIC 1249777 For: ADAMS HOMES 5337 Lugo Street, Fort Pierce, FL 34951 External static pressure Pressure losses Available static pressure Supply/return available pressure Lowest friction rate Actual air flow Total effective length (TEL) Heating 0.40 in H2O 0.06 in H2O 0.34 in H2O 0.170/0.170 in H2O 0.300 in/100ft 1167 cfm 113 ft Cooling 0.40 in H2O 0.06 in H2O 0.34 in H2O 0.170/0.170 in H2O 0.300 in/100ft 1167 cfm Name Design (Btuh) Htg (cfm) Cig (cfm) Design FR Diam (in) H x W (in) Duct Mat Actual Ln (ft) Ftg.Egv Ln (ft) Trunk BATH 2 h 832 34 24 0.394 4.0 Ox 0 VI Fx 16.3 70.0 BDRM2 h 4740 194 144 0.366 8.0 Ox0 VIFx 22.9 70.0 BDRM3 h 1875 77 56 0.433 6.0 Ox0 MR 8.6 70.0 DENr8DRM4 DINING/FOYER h 4189 171 145 0.409 7.0 Ox 0 VIFx 13.2 70.0 h 3501 143 129 0.444 8.0 Ox 0 VIFx 6.5 70.0 FAMILYRM c 4450 106 209 0.330 8.0 Ox 0 VIFx 17.9 85.0 sti KITCHENMOOK c 3272 130 153 0.323 8.0 Ox 0 VIFx 20.1 85.0 sti LAUNDRY c 918 17 43 0.316 4.0 Ox 0 VIFx 22.7 85.0 sti M.BATH h 1655 68 46 0.317 5.0 Ox0 VIFx 22.2 85.0 sti M. WIG c 103 2 5 0.318 4.0 Ox 0 VI Fx 21.9 85.0 st1 MSTRBDRM h 5510 225 214 0.300 8.0 Ox0 VIFx 28.2 85.0 st1 Supply Trunk Detail Table Name Trunk Type Htg (cfm) Cig (cfm) Design FIR(fpm) Veloc Diam (in) H x W (in) Duct Material Trunk sti PeakAVF 549 670 0.300 627 14.0 0 x 0 VnlFlx l- wrightsoft, �eN/tr.pMmeaL..a��nepe.y Right-Sute®Uriversal 202121.0.07 RSU23828 ��...terstore1820BGRtLot114Pts3Waterstore18208GR.rLp Calc=WS FrortDoorfaces: E 2021-JU-21 15:02:05 Page 1 Return Branch Detail Table Name Grille Size (in) Htg (Cfm) Clg (Cfm) TEL (ft) Design FR Veloc (fpm) Diam (in) H x W (in) Stud/Joist Opening (in) Duct Mat Trunk rb1 Ox 0 1167 1167 0 0 0 0 Ox 0 VIFx ,` -#I&- wrightsoft° .N/p..6N.. e.Mwycump..Y Right-Sute®Uriversa1202121.0.07 RSU23828 J+C& ...terstore1820BGR1Lot114Pts3Waterstore1820BGR.nQ Calc=W8 FrortDooriaces: E 2021-JU-21 15fl2:05 Page 2 2020 -AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA TABLE 402.4.1.1 AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA Project Name: Lot 114 Phase 3 Waterstone 1820 BGR Builder Name: ADAMS HOMES Street: 5337 Lugo Street Permit Office: City, State, Zip: Fort Pierce , FL , 34951 Permit Number: Y Owner: Jurisdiction: 661000 w Design Location: FL, ST LUCIE CO INTL — — = U COMPONENT AIR BARRIER CRITERIA INSULATION INSTALLATION CRITERIA General A continuous air barrier shall be installed in the building envelope. Air -permeable insulation shall requirements The exterior thermal envelope contains a continuous air barrier. not be used as a sealing material. Breaks or'oints in the air barrier shall be sealed. Ceiling/attic The air barrier in any dropped ceiling/soffit shall be aligned with the insulation and any gaps in the air barrier shall be sealed. The insulation in any dropped ceiling/soffit Access openings, drop down stairs or knee wall doors to shall be aligned with the air barrier. unconditioned attic spaces shall be sealed. Walls The junction of the foundation and sill plate shall be sealed. Cavities within corners and headers of frame walls The junction of the top plate and the top of exterior walls shall be shall be insulated by completely filling the cavity sealed. Knee walls shall be sealed. with a material having a thermal resistance of R-3 per inch minimum. Exterior thermal envelope insulation for framed walls shall be installed in substantial contact and continuous alignment with the air barrier. Windows, skylights The space between window/door jambs and framing, and and doors skylights and framing shall be sealed. Rim joists Rim joists shall include the air barrier. Rim joists shall be insulated. Floors (including The air barrier shall be installed at any exposed edge of insulation. Floor framing cavity insulation shall be installed to above -garage maintain permanent contact with the underside of and cantilevered subfloor decking, or floor framing cavity insulation floors) shall be permitted to be in contact with the top side of sheathing, or continuous insulation installed on the underside of floor framing and extends from the bottom to the top of all perimeter floor framing members. Crawl space walls Exposed earth in unvented crawl spaces shall be covered with Where provided instead of floor insulation, insulation a Class I vapor retarder with overlapping joints taped. shall be permanently attached to the crawlspace wall . Shafts, penetrations Duct shafts, utility penetrations, and flue shafts opening to exterior or unconditioned s ace shall be sealed. Batts in narrow cavities shall be cut to fit, or narrow Narrow cavities cavities shall be filled by insulation that on installation readily conforms to the available cavity spaces. Garage separation Air sealing shall be provided between the garage and conditioned spac as. Recessed lighting Recessed light fixtures installed in the building thermal envelope Recessed light fixtures installed in the building shall be sealed to the finished surface. thermal envelope shall be air tight and IC rated. Plumbing and wiring Batt insulation shall be cut neatly to fit around wiring and plumbing in exterior walls, or insulation that on installation readily conforms to available space shall extpnrl behind and wiring, Shower/tub on exterior wall The air barrier installed at exterior walls adjacent to showers and piping Exterior walls adjacent to showers and tubs shall tubs shall separate them from the showers and tubs. be insulated. Electrical/phone box or The air barrier shall be installed behind electrical or communication exterior walls boxes or air -sealed boxes shall be installed. HVAC register boots HVAC supply and return register boots that penetrate building thermal envelope shall be sealed to the sub -floor, wall covering or Concealed When required to be sealed, concealed fire sprinklers shall only be sprinklers sealed in a manner that is recommended by the manufacturer. Caulking or other adhesive sealants shall not be used to fill voids a. In addition inspection over I of log walls shall be in accord th th a I ance wi a provisions of ICC-400. 7/21/2021 3:53 PM EnergyGauge® USA 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 1 of 1 FORM R405-2020 RESIDENTIAL ENERGY CONSERVATION CODE DOCUMENTATION CHECKLIST Florida Department of Business and Professional Regulation Simulated Performance Alternative (Performance) Method Applications for compliance with the 2020 Florida Building Code, Energy Conservation via the Residential Simulated Performance Alternative shall include: ❑ This checklist ❑ Form R405-2020 report ❑ Input summary checklist that can be used for field verification (usually four pages/may be greater) ❑ Energy Performance Level (EPL) Display Card (one page) ❑ HVAC system sizing and selection based on ACCA Manual S or per exceptions provided in Section R403.7 ❑ Mandatory Requirements (five pages) Required prior to CO: ❑ Air Barrier and Insulation Inspection Component Criteria checklist (Table R402.4.1.1 - one page) ❑ A completed 2020 Envelope Leakage Test Report (usually one page); exception in R402.4 allows dwelling units of R-2 Occupancies and multiple attached single family dwellings to comply with Section C402.5 ❑ If Form R405 duct leakage type indicates anything other than "default leakage" then a completed 2020 Duct Leakage Test Report - Performance Method (usually one page) 7/21/2021 3:52:32 PM EnergyGauge@ USA 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 1 of 1 Envelope Leakage Test Report (Blower Door Test) Residential Prescriptive, Performance or ERI Method Compliance 2020 Florida Building Code, Energy Conservation, 7th Edition Jurisdiction: 661000 Permit #: °Job•Information - • . - Builder: ADAMS HOMES Community: Lot: 114 Phase3 Address: 5337 Lugo Street City: Fort Pierce State: FL Zip: 34951 Air Leakage Test`Results , Passing,resulrsmustrrmeet;eitizerthePerformance, Prescriptive,,orERi"Method`` • Q PRESCRIPTIVE METHOD=The building or dwellirig unit shall be. tested and verified as having an airieakage rate of riot exceeding 7'air changes per, hour at a pressure 6f.02 mcfi w:g (50 ih'.Climate °Zones°1 and 2 •Pascals) Q ' PERFORMANCE or ERI METHOD The bwldrg or'dwelhng unit;§hall•be tested and verified as having an air leakage rate of not.exceeding , theselected ACH(50)value assfiownpn Firm R405-2020 (Rerformance).or.`R406 2020 (ERI)section.labeled `as'infiltration; sub-seetio_mAGH50. ACH(% •speoified on Form R405-2020-i0ergy Ca/c (Performance} or R406 2020; (ERI): " 7.000 x 60 _ 18200 = Method for calculating buildinq volume: CFM(50) Building Volume ACH(50) Q Retrieved from architectural plans F-1 PASS • Code software calculated When ACH(50) is less than 3, Mechanical Ventilation installation Q Field measured and calculated must be verified by building department. R402.4.1.2 Testing. Testing shall be conducted in accordance with ANSI/RESNET/ICC 380 and reported at a pressure of 0.2 inch w.g. (50 Pascals) Testing shall be conducted by either individuals as defined in Section 553.993(5) or (7), Florida Statues.or individuals licensed as set forth in Section 489.105(3)(f), (g), or (i) or an approved third party. A written report of the results of the test shall be signed by the party conducting the test and provided to thecode official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. During testing: 1. Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended weatherstripping or other infiltration control measures. 2. Dampers including exhaust, intake, makeup air, back draft and flue dampers shall be closed, but not sealed beyond intended infiltration control measures. 3. Interior doors, if installed at the time of the test, shall be open. 4. Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed. 5. Heating and cooling systems, if installed at the time of the test, shall be turned off. 6. Supply and return registers, if installed at the time of the test, shall be fully open. Testing Company Company Name: Phone: I hereby verify that the above Air Leakage results are in accordance with the 2020 7th Edition Florida Building Code Energy Conservation requirements according to the compliance method selected above. Signature of Tester: Printed Name of Tester: License/Certification #: Date of Test: Issuing Authority: 7/21/2021 3:53:24 PM EnergyGaugeO USA 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 1 of 1