HomeMy WebLinkAboutENERGY CONSERVATION CODEFORM R405-2020
RESIDENTIAL ENERGY CONSERVATION CODE DOCUMENTATION CHECKLIST
Florida Department of Business and,Professional Regulation
Simulated Performance Alternative (Performance) Method
Applications for compliance with the 2020 Florida Building Code, Energy Conservation via the residential
Simulated Performance method shall include:
❑ This Checklist
❑ Form R405-2020 report
❑ Input summary checklist that can be used for field verification (usually four pages/may be greater).
❑ Energy Performance Level (EPL) Display Card (one page)
❑ HVAC system sizing and selection based on ACCA Manual S or per exceptions provided in Section R403.7
❑ Mandatory Requirements (rive pages)
Required prior to CO:
❑ Air Barrier and Insulation Inspection Component Criteria checklist (Table 402.4.1.1- one page)
❑ A completed 2020 Envelope Leakage Test Report (usually one page); exception in R402.4 allows dwelling units
of R - 2 Occupancies and multiple attached single family dwellings to comply with Section C402.5
❑ If FORM R405 duct leakage type indicates anything other than "default leakage ° then a completed 2020 Duct
Leakage Test Report - Performance Method (usually one page).
V rightSID g 2022-Jan-06 16:0 e 1
Ri ht-Suite®Universal 2021 21.0.11 RSU27054 Right -Energy® Florida 2020 Section R405.4.1 Compliant Software Page 1
ew �•ri. s r.�r r currents\Wrightsoft HVAC\10930 Myrtlbwood Ln.rup Calc = MJ8 Front Door faces: N
t !
FORM R405-2020
i
FLORIDA ENERGY EFFICIENCYCODfE FOR BUILDING CONSTRUCTION
Florida Department of Business and Professionall Regulation - Residential Performance Method
Project Name: Reed Residence I I
Builder Name: Telese Builders
Street: 10930 Myrtlewood Ln
Permit Office:
1f
City, State, Zip: Port St Lucie, FL 34986
Permit Number:
Owner: Mark & Iris Reed !
Jurisdiction: St Lucie
Design Location: FL, St Lucie Co Intl !
i County: St Lucie (Florida Climate Zone 2)
1. New construction or existing New (From Plans)
9. Wall types (4156 ft=)
Insulation (R) Area (ft2)
2. Single family or multiple family Single -Family I
a. Blk Wall, Stucco Ext, R 4.1 Ext
b. Frm Wall, 112" Gyp Bd Ext, R-11
4.1 3440.23
11.0 716.00
3. Number of units, if multiple family 1 i
c. WA
4. Number of bedrooms 3
d. NIA
10 Ceiling types (3982 ft2)
Insulation (R) Area (W)
5. Is this a worst case? Yes
a_ Attic, Tile Roof, R-20 Roof Deck
0.0 3981.75
6. Conditioned floor area above grade (fF) 3981.75 i
b. NIA
Conditioned floor area below grade (fF) 0
c. NIA
11 Ducts
R Area (ft2)
7. Windows (681 ft2) Description Area (ft2)
a,Sup: AH 1 Attic, Ret: AH 1 Attic. AH: (Unconditioned) 6.0 684.18
a, U-Factor. Dbl Impact, 0.560 158.00
i b Sup: AH 2 Attic, Ret: AH 2 Attic, AH: (Unconditioned) 6.0 254.47
SHGC: 0.24
b. U-Factor. Dbl Impact, 0.430 130.50
12 Cooling systems
kBtu/hr Efficiency
SHGC: 0.26
a.Split air conditioner
47.0 SEER: 15.0
c. U-Factor: Dbl Impact, 0.690 290.00
b.Split air conditioner
18.0 SEER: 16.0
SHGC: 0.22
13. Heating systems
kBtu/hr Efficiency
d. U-Factor. other (see details) 102.00
a.Electdc strip
, b.Electric strip
43.0 AFUE:100.0
19.8 AFUE: 100.0
SHGC: other (see detaisl)
Area Weighted Average Overhang Depth: 8.126 ft
14! Hot water systems
Area Weighted Average SHGC: 0.230
I a.Propane instantaneous (0 gal)
Cap: 0 gal
UEF: 0.93
8 FloorInsulation (R) )
b anon features
a. n Grade Depth, Tile Fir Fnsh 0.p3981.75?
(None)
b. NIA
c. NIA
15: Credits Pstat
Glass/Floor area: 0.171 Total Proposed Modified Loads: 98.50
PASS
Total Baseline
Loads: 128.65
a7�7
hereby certify that the plans and specifications covered by I
Review of the plans and specifications
�41E S%r
this calculation are in compliance with the Florida Energy
Code.
covered by this calculation indicates
compliance with the Florida Energy
p _ -
k$�
Code. Before construction is completed,
y _,t��;r• ,;. �
Prepared By Vicki Lynne NiSa
this building will be inspected for
compliance with Section 553.908
ry
Signature Ilz�o&,�.f,)4�.--Date 01 /06/2022
FI }rida Statutes.
�ii� •�
I hereby certify that this building, as designed, is in
C4U
compliance with the Florida/Energy Code. !
j
WE��
Owner/Age t Name I'Q-b j
Building Official Name
Signature Date / /d 2v
signature Date
- Compliance requires certification by the air handler unit manufacturer that the air handler enclosure qualifies as
certified factory -sealed in accordance with R403.3.2.1.
- Compliance requires an Air Barrier and Insulation Inspection Checklist in accordance with R402.4.1.1 and this project
requires an envelope leakage test report with envelope leakage qo greater than 7.0 ACH50 (R402.4.1.2).
I i
i I 2022.1an-0616:03:40
W69ghtSoft" Right-Sufte®Universal 202121.0.11 RSU27054 Right-Energy®Florida2020 Section R405.4.1 Compliant Software Page
...wmentslWrightsoR WAC110930 Myrtlewood Ln.rup }Calc=MJ8 Front Door faces: N
FORM R405-2020
Building Input Summary Report
PROJECT
Title:
Reed Residence
Bedrooms:
3
Address type:
Street
address
Building Type: FLAsBuilt
Bathrooms:
3
Lot#:
Owner:
Mark & Iris
Reed
Conditioned Area:
3982
Block/Subdivision:
# of Units: 1
Total Stories:
1
Platbook:
Builder Name: Telese Builders
Worst Case:
Yes
Street:
10930 Myrtlewood Ln
Permit Office:
Rotate Angle:
0
County: St Lucie
State, Zip: Port St Lucie, FL 34986
Jur' diction:
St Lucie
Cross Ventilation:
No
City,
Family Type: Single -Family
New Plans)
Whole House Fan:
Terrain:
No
Ocean/Lake
New/Existing:
(From
Year Construct:
Shielding:
Suburban
Comment:
CLIMATE
IECC Design Temp
Int Design Temp
Heating
Design
Daily Temp
Design Location
TMY Site
Zone 97.5 % 2.5 %
Winter Summer
Degree Days
Moisture
Range
FL, St Lucie Co Intl
FL -Fort -Pierce
2 41
90
70
75
486
57
Low
BLOCKS
#
Name
Area
Volume
1
AH 1
2791.25 ft2
31062.50 f?
2
AH 2
1190.50 W
12704.00 ft'
SPACES
#
Area
Volume
Kitchen
Occupants Bedrooms
Infil ID
Finished
Cooled
Heated
1
WIC 3
42.75 ft2
427.50
ft'
No
0
0
1
Yes
Yes
Yes
2
Bed 3
202.50 ft2
2025.00
ft'
No
0
1
1
Yes
Yes
Yes
3
Bath 3
88.00 W
880.00
ft'
No
0
0
1
Yes
Yes
Yes
4
Linen
10.00 ft2
100.00
fe
No
0
0
1
Yes
Yes
Yes
5
6
Butler's Pantry
Bed 2
72.00 ft
224.75 ft22247.60
720.00
fts
ft
No
No
0
0
0
1
1
1
Yes
Yes
Yes
Yes
Yes
Yes
7
Bath 2
91.00 ft2
910.00
ft'
No
0
0
1
Yes
Yes
Yes
8
Hall Bath
84.50 ft2
845.00
W
No
0
0
1
Yes
Yes
Yes
9
Mud Room
71.50 ft2
715.00
W
No
0
0
1
Yes
Yes
Yes
10
11
Laundry
Pantry
97.50 ft2
71.25 ft2
975.00
712.50
ft'
ft'
No
No
0
0
0
0
1
1
Yes
Yes
Yes
Yes
Yes
Yes
12
Kitchen
298.50 ft2
3402.90
ft'
Yes
2
0
1
Yes
Yes
Yes
13
Kitchen Nook
246.50 ft2
3056.60
ft'
No
0
0
1
Yes
Yes
Yes
14
Bonus Room
437.00 ft2
5025.50
ft'
No
0
0
1
Yes
Yes
Yes
15
16
Hall
Foyer
81.00 ft2
94.50 ft2
810.00 If
1134.00
ft'
No
No
0
0
0
0
1
1
Yes
Yes
Yes
Yes
Yes
Yes
17
Study
224.00 ft2
2688.00
ft'
No
0
0
1
Yes
Yes
Yes
18
Great Boom
540.00 ft2
6696.00
ft'
No
2
0
1
Yes
Yes
Yes
19
Master Bedroom
351.00 ft2
3861.00
ft'
No
0
1
1
Yes
Yes
Yes
20
21
M Hall
WIC
28.00 ft2
18.00 ft2
280.00
180.00
ft'
ft'
No
No
0
0
0
0
1
1
Yes
Yes
Yes
Yes
Yes
Yes
22
M Linen
11.25 fF
112.50
fP
No
0
0
1
Yes
Yes
Yes
23
M Bath
224.75 ft2
2247.50
ft'
No
0
0
1
Yes
Yes
Yes
24
His
76.50 ft2
765.00
ft'
No
0
0
1
Yes
Yes
Yes
25
Wtr Clst
27.00 ft2
270.00
W
No
0
0
1
Yes
Yes
Yes
26
27
Hers
Hallway
192.50 ft2
28.50 ft2
1925.00
285.00
ft'
ft'
No
No
0
0
0
0
1
1
Yes
Yes
Yes
Yes
Yes
Yes
28
Cist
9.00 ft2
90.00
ft'
No
0
0
1
Yes
Yes
Yes
29
WIC 2
38.00 ft2
380.00
ft'
No
0
0
1
Yes
Yes
Yes
2022-Jan-06 16:03:40
-- wrightsoftg Right-Suite®Universa12021 21.0.11 RSU27054 Right -Energy® Florida2020 SectionR405.4.1 Compliant Software Page
aKxa•r�r;,an:.+r ...cuments\Wrightsoft HVAC110930 Myrtlewood Ln.rup Calc = MJ6 Front Door faces: N
PnRnn PAn-_gngn
FLOORS
(Total Exposed Area = 3982 sq.ft.)
#
Floor Type
Space Perimeter R-Value Area
U-Factor
Tile Wood Carpet
1
On Grade Depth, Tile Fir Fnsh
WIC 3
19 ft
0
42.75 ft2
0.989
1.0
0
0
2
On Grade Depth, Tile Fir Fnsh
Bed 3
19 ft
0
202.50 ft2
0.989
1.0
0
0
3
On Grade Depth, Tile Fir Fnsh
Bath 3
10 ft
0
88.00 ft2
0.989
1.0
0
0
4
On Grade Depth, Tile Fir Fnsh
Linen
0 ft
0
10.00 ft2
0.989
1.0
0
0
5
On Grade Depth, Tile Fir Fnsh
Butler's Pantry
0 ft
0
72.00 ft2
0.989
1.0
0
0
6
On Grade Depth, Tile Fir Fnsh
Bed 2
16 ft
0
224.75 ft2
0.989
1.0
0
0
7
On Grade Depth, Tile Fir Fnsh
Bath 2
9 ft
0
91.00 ft2
0.989
1.0
0
0
8
On Grade Depth, Tile Fir Fnsh
Hall Bath
7 ft
0
84.50 ft2
0.989
1.0
0
0
9
On Grade Depth, Tile Flr Fnsh
Mud Room
9 ft
0
71.50 ft2
0.989
1.0
0
0
10
On Grade Depth, Tile Flr Fnsh
Laundry
17 ft
0
97.50 ft2
0.989
1.0
0
0
11
On Grade Depth, Tile Fir Fnsh
Pantry
0 ft
0
71.25 ft2
0.989
1.0
0
0
�-
12
On Grade Depth, Tile Fir Fnsh
Kitchen
0 ft
0
298.50 ft2
0.989
1.0
0
0
13
On Grade Depth, Tile Fir Fnsh
Kitchen Nook
22 ft
0
246.50 ft2
0.989
1.0
0
0
14
On Grade Depth, Tile Fir Fnsh
Bonus Room
65 ft
0
437.00 ft2
0.989
1.0
0
0
15
On Grade Depth, Tile Fir Fnsh
Hall
7 ft
0
81.00 ft2
0.989
1.0
0
0
16
On Grade Depth, The Fir Fnsh
Foyer
9 ft
0
94.50 ft
0.989
1.0
0
0
17
On Grade Depth, Tile Fir Fnsh
Study
33 ft
0
224.00 ft2
0.989
1.0
0
0
18
On Grade Depth, Tile Fir Fnsh
Great
Room
23 ft
0
540.00 ft2
0.989
1.0
0
0
19
On Grade Depth, Tile Fir Fnsh
Master Bedroom
57 ft
0
351.00 ft2
0.989
1.0
0
0
20
On Grade Depth, Tile Fir Fnsh
M Hall
0 ft
0
28.00 ft2
0.989
1.0
0
0
21
On Grade Depth, Tile Fir Fnsh
WIC
0 ft
0
18.00 ftz
0.989
1.0
0
0
22
On Grade Depth, Tile Fir Fnsh
M Linen
5 ft
0
11.25 ft
0.989
1.0
0
0
23
On Grade Depth, Tile Fir Fnsh
M Bath
10 ft
0
224.75 ft2
0.989
1.0
0
0
24
On Grade Depth, Tile Fir Fnsh
His
9 ft
0
76.50 W
0.989
1.0
0
0
25
On Grade Depth, Tile Fir Fnsh
Wtr Clst
0 ft
0
27.00 ft2
0.989
1.0
0
0
26
On Grade Depth, Tile Fir Fnsh
Hers
37 ft
0
192.50 ft2
0.989
1.0
0
0
27
On Grade Depth, Tile Fir Fnsh
Hallway
4 ft
0
28.50 ft2
0.989
1.0
0
0
28
On Grade Depth, Tile Fir Fnsh
Clst
0 ft
0
9.00 ft2
0.989
1.0
0
0
29
On Grade Depth, Tile Fir Fnsh
WIC 2
0 ft
0
38.00 ft2
0.989
1.0
0
0
ROOF
Roof
Gable Roof Rad
Solar SA
Emitt
Emitt
Deck Pitch
#
Type Materials
Area
Area Color Barr
Absor. Tested
Tested
Insul. (deg)
1
Hip RoofTile
3024 ft2
Medium N
0.75 No
0.90
No
20
23
2
Hip RoofTile
1290 ft2
Medium N
0.75 No
0.90
No
20 23
3
Hip RoofTile
1645 ft2
Medium N
0.75 No
0.90
No
20 23
ATTIC
#
Type Ventilation
Vent Ratio 1 in
Area RBS
IRCC
1
Full attic Unvented
0
2791.25ft2 N
N
2
Full attic Unvented
0
1190.50ft2 N
N
3
Full attic Unvented
0
1518.75ft2 N
N
CEILING
(Total Exposed Area = 3982 sq.ft.)
#
Ceiling Type
Space
R-Value
U-Factor
Area
Framing Fraction
Truss Type
1
Attic, Tile Roof, R-20 Roof Deck Ins
WIC 3
0
0.405
42.75 ft2
0.10
Wood
2
Attic, Tile Roof, R-20 Roof Deck Ins
Bed 3
0
0.405
202.50 ft2
0.10
Wood
3
Attic, Tile Roof, R-20 Roof Deck Ins
Bath 3
0
0.405
88.00 ft2
0.10
Wood
4
Attic, Tile Roof, R-20 Roof Deck Ins
Linen
0
0.405
10.00 ft2
0.10
Wood
5
Attic, Tile Roof, R-20 Roof Deck Ins Butler's Pantry
0
0.405
72.00 ft2
0.10
Wood
6
Attic, Tile Roof, R-20 Roof Deck Ins
Bed 2
0
0.405
224.75 ft2
0.10
Wood
7
Attic, Tile Roof, R-20 Roof Deck Ins
Bath 2
0
0.405
91.00 ft2
0.10
Wood
8
Attic, Tile Roof, R-20 Roof Deck Ins
Hall Bath
0
0.405
84.50 ft2
0.10
Wood
9
Attic, Tile Roof, R-20 Roof Deck Ins
Mud Room
0
0.405
71.50 ft2
0.10
Wood
10
Attic, Tile Roof, R-20 Roof Deck Ins
Laundry
0
0.405
97.50 ft2
0.10
Wood
11
Attic, Tile Roof, R-20 Roof Deck Ins
Pantry
0
0.405
71.25 ft2
0.10
Wood
12
Attic, Tile Roof, R-20 Roof Deck Ins
Kitchen
0
0.405
298.50 ft2
0.10
Wood
13
Attic, Tile Roof, R-20 Roof Deck Ins
Kitchen Nook
0
0.405
246.50 ft2
0.10
Wood
14
Attic, Tile Roof, R-20 Roof Deck Ins
Bonus Room
0
0.405
437.00 ft2
0.10
Wood
15
Attic, Tile Roof, R-20 Roof Deck Ins
Hall
0
0.405
81.00 ft2
0.10
Wood
16
Attic, Tile Roof, R-20 Roof Deck Ins
Foyer
0
0.405
94.50 W
0.10
Wood
17
Attic, Tile Roof, R-20 Roof Deck Ins
Study
0
0.405
224.00 ft2
0.10
Wood
18
Attic, Tile Roof, R-20 Roof Deck Ins
Great Room
0
0.405
540.00 ft2
0.10
Wood
19
Attic, Tile Roof, R-20 Roof Deck InsMlaster Bedroom
0
0.405
351.00 ft2
0.10
Wood
20
Attic, Tile RoofR-20 Roof Deck Ins
M Hall
0
0.405
28.00 ft2
0.10
Wood
21
Attic, Tile Roof,, R-20 Roof Deck Ins
WIC
0
0.405
18.00 ft2
0.10
Wood
22
Attic, Tile Roof, R-20 Roof Deck Ins
M Linen
0
0.405
11.25 ft2
0.10
Wood
23
Attic, Tile Roof, R-20 Roof Deck Ins
M Bath
0
0.405
224.75 fe
0.10
Wood
24
Attic, Tile Roof, R-20 Roof Deck Ins
His
0
0.405
76.50 ft2
0.10
Wood
25
Attic, Tile Roof, R-20 Roof Deck Ins
Wtr Clst
0
0.405
27.00 ft2
0.10
Wood
26
Attic, Tile Roof, R-20 Roof Deck Ins
Hers
0
0.405
192.50 ft2
0.10
Wood
27
Attic, Tile Roof, R-20 Roof Deck Ins
Hallway
0
0.405
28.50 ft2
0.10
Wood
28
Attic, Tile Roof, R-20 Roof Deck Ins
Clst
0
0.405
9.00 ft20.10
Wood
29
Attic, Tile Roof, R-20 Roof Deck Ins
WIC 2
0
0.405
38.00 ft2
0.10
Wood
2022-Jan-06 16:03:40
9MIP`i9� tsaft" Right -Suite® Universal 2021 21.0.11 RSU27054 Right -Energy® Florida 2020 Section R405.4.1 Compliant Software Page 4
nvss•c cuments\Wrightsoft HVAC\10930 Myrtiewood Ln.rup Calc = MJ8 Front Door faces: N
Cnone DAnr,_,3n,)n
WALLS
(Total Exposed Area = 4156 sq.ft.)
Adjacent
Cavity
Width
Height Sheathing
Ll- Frm.
Solar
Below
✓ # Ornt
To
Wall Type Space R-Value
Ft In
Ft In Area R-Value
Factor Frac.
Absor.
Grade%a
1
NE
Exterior
Blk Wall Stucco WIC 3
0
4 6
10 0 45.0
ft2
4
0.109 0.22
0.20
0
2
Partition
Frm Walt, 1/2" Gy WIC 3
11
14 0
10 0 140.0
ft2
0
0.101 0.25
0.75
0
3
NE
Exterior
Blk Wall, Stucco Bed 3
0
15 6
10 0 155.0
ft2
4
0.109 0.22
0.20
0
4
-
Partition
Frm Wall, 1/2" Gy Bed 3
11
3 0
10 0 30.0
ft2
0
0.101 0.25
0.75
0
5
NE
Exterior
Blk Wall, Stucco Bath 3
0
7 0
10 0 70.0
ft2
4
0.109 0.22
0.20
0
6
SE
Exterior
Blk Wall, Stucco Bath 3
0
1 6
10 0 15.0
ft2
4
0.109 0.22
0.20
0
7
8
NW
NE
Exterior
Exterior
Blk Wall, Stucco Bath 3
Blk Wall, Stucco Bed 2
0
0
1 6
15 6
10 0 15.0
10 0 155.0
ft2
ft2
4
4
0.109 0.22
0.109 0.22
0.20
0.20
0
0
9
NE
Exterior
Blk Wall, Stucco Bath 2
0
7 0
10 0 70.0
ft2
4
0.109 0.22
0.20
0
.- 10
SE
Exterior
Blk Wall, Stucco Bath 2
0
2 0
10 0 20.0
ft2
4
0.109 0.22
0.20
0
11
NE
Exterior
Blk Wall, Stucco Hall Bath
0
6 6
10 0 65.0
ft2
4
0.109 0.22
0.20
0
12
-
Partition
Frm Wall, 1/2" Gy Mud Room
11
8 6
10 0 85.0
ft2
0
0.101 0.25
0.75
0
13
SE
Exterior
Blk Wall, Stucco Laundry
0
10 0
10 0 100.0
ft2
4
0.109 0.22
0.20
0
0
14
SW
Exterior
Blk Wall, Stucco Laundry
0
3 6
10 0 35.0
ft2
4
0.109 0.22
0.20
15
-
Partition
Frm Wall, 1/2" Gy Laundrryy
11
3 0
10 0 30.0
ft2
0
0.101 0.25
0.75
0
16
SW
Exterior
Blk Wall, Stucco Kitchen; ook
0
9 0
12 5 111.6
ft2
4
0.109 0.22
0.20
0
17
NW
Exterior
Blk Wall, Stucco Kitchen Nook
0
13 0
12 5 161.2
ft2
4
0.109 0.22
0.20
0
18
NE
Exterior
Blk Wall, Stucco Bonus Room
0
23 0
11 6 264.5
ft2
4
0.109 0.22
0.20
0
19
SW
Exterior
Blk Wall, Stucco Bonus Room
0
23 0
11 6 264.5
ft2
4
0.109 0.22
0.20
0
20
NW
Exterior
Blk Wall, Stucco Bonus Room
0
19 0
11 6 218.5
ft2
4
0.109 0.22
0.20
0
21
SW
Exterior
Blk Wall, Stucco Hall
0
2 6
10 0 25.0
ft2
4
0.109 0.22
0.20
0
22
W
Exterior
Blk Wall, Stucco Hall
0
4 3
10 0 42.4
ft2
4
0.109 0.22
0.20
0
23
SE
Exterior
Blk Wall, Stucco Foyer
0
9 0
12 0 108.0
ft2
4
0.109 0.22
0.20
0
0
24
NE
Exterior
BIk Wall, Stucco Study
0
5 6
12 0 66.0
ft2
4
0.109 0.22
0.20
25
SE
Exterior
Blk Wall Stucco Study
0
14 0
12 0 168.0
ft2
4
0.109 0.22
0.20
0
26
-
Partition
Frm Walt, 1/2" Gy Study
11
13 0
12 0 156.0
ft2
0
0.101 0.25
0.75
0
27
NW
Exterior
Blk Wall, Stucco Great Room
0
22 6
12 5 279.0
ft2
4
0.109 0.22
0.20
0
28
NE
Exterior
Blk Wall, Stucco Master Bedroom
0
19 0
11 0 209.0
ft2
4
0.109 0.22
0.20
0
0
29
SW
Exterior
Blk Wall, Stucco Master Bedroom
0
19 6
11 0 214.5
ft2
4
0.109 0.22
0.20
30
NW
Exterior
Blk Wall, Stucco Master Bedroom
0
18 0
11 0 198.0
ft2
4
0.109 0.22
0.20
0
31
SW
Exterior
Bilk Wall, Stucco M Linen
0
4 6
10 0 45.0.
ft2
4
0.109 0.22
0.20
0
32
SW
Exterior
Bilk Walt, Stucco M Bath
0
10 0
10 0 100.0
ft2
4
0.109 0.22
0.20
0
33
SW
Exterior
Blk Wall, Stucco His
0
9 0
10 0 90.0
ft2
4
0.109 0.22
0.20
0
34
SW
Exterior
BIk Wall Stucco Hers
0
13 0
10 0 130.0
ft2
4
0.109 0.22
0.20
0
0
35
-
Partition
Frm Waif, 1/2" Gy Hers
11
24 0
10 0 240.0
ft2
0
0.101 0.25
0.75
36
-
Partition
Frm Wall, 1/2" Gy Hallway
11
3 6
10 0 35.0
ft2
0
0.101 0.25
0.75
0
WINDOWS
(Total Exposed Area = 681 sq.ft.)
Wall
Overhang
Interior
✓ #
Ornt ID Frame Panes NFRC LI-Factor
SHGC
Impact
W x H, Area
Depth
Separation
Shade
Screening
1
NE 3 Metal
Low-E Double Yes 0.560
0.24
Yes
6'0" x 6'0" 36 ft2
2 ft 0 in
2 ft 0 in
Blinds 45'
outdoor
2
NE 5 Metal
Low-E Double Yes 0.430
0.26
Yes
3'0" x 1'6" , 5 ft2
2 ft 0 in
2 ft 0 in
Blinds 45°
outdoor
3
NE 8 Metal
Low-E Double Yes 0.560
0.24
Yes
6'0" x 6'0" 36 ft2
2 ft 0 in
2 ft 0 in
Blinds 45°
outdoor
4
NE 9 Metal
Low-E Double Yes 0.430
0.26
Yes
3'0" x 2'0'I , 6 ft2
2 ft 0 in
2 ft 0 in
None
None
5
NE 11 Metal
Low-E Double Yes 0.430
0.26
Yes
3'0" x 2'0" , 6 ft2
2 ft 0 in
2 ft 0 in
None
None
6
7
SE 13 Metal
SW 16 Metal
Low-E Double Yes 0.560
Low-E Double Yes 0.690
0.24
0.22
Yes
Yes
2'0" x 4'0" 8 ft2
8'6" x 10'0" , 85 ft2
2 ft 0 in
12 ft 0 In
2 ft 0 in
2 ft 0 In
Blinds 45°
None
outdoor
None
8
NW 17 Metal
Low-E Double Yes 0.690
0.22
Yes
8'6" x 10-0" , 85 ft2
12 ft 0 in
2 ft 0 in
None
None
9
NE 18 Metal
Low-E Double Yes 0.430
0.26
Yes
6'0" x 2'0" , 12 ft2
2 ft 0 in
2 ft 0 in
None
None
10
NW 20 Metal
Low-E Double Yes 0.430
0.26
No
5'0" x 2'0" , 10 ft2
2 ft 0 in
2 ft 0 in
Blinds 45'
outdoor
11
NW 20 Metal
Low-E Double Yes 0.430
0.26
Yes
5'0" x 6'0" , 30 ft2
2 ft 0 in
2 ft 0 in
Blinds 45°
outdoor
12
NW 20 Metal
Low-E Double Yes 0.560
0.24
Yes
4'0" x 6'0" , 24 ft2
2 ft 0 in
2 ft 0 in
Blinds 45'
outdoor
13
W 22 Metal
Low-E Double Yes 0.730
0.20
Yes
2'10" x 8'0" , 23 ft2
14 ft 0 in
2 ft 0 in
None
None
14
SE 23 Metal
Low-E Double Yes 0.430
0.26
Yes
6'0" x 2'0" , 12 ft2
7 ft 6 in
2 ft 0 in
None
None
15
SE 23 Metal
Low-E Double Yes 0.730
0.20
Yes
6'0" x 8'0" , 48 ft2
7 ft 6 in
2 ft 0 in
None
None
16
SE 25 Metal
Low-E Double Yes 0.560
0.24
Yes
5'0" x 6'0" 30 ft2
2 ft 0 in
2 ft 0 in
Blinds 45°
outdoor
17
18
NW 27 Metal
NE 28 Metal
Low-E Double Yes 0.690
Low-E Double Yes 0.730
0.22
0.20
Yes
Yes
12'0" x 1010" ft2
2'8" x 8'0" 1 2� ft2
14 ft 0 in
22 ft 0 in
2 ft 0 in
2 ft 0 in
None
None
None
None
19
NW 30 Metal
Low-E Double Yes 0.430
0.26
Yes
5'0" x 6'0" ft2
2 ft 0 in
2 ft 0 in
Blinds 45°
outdoor
20
NW 30 Metal
Low-E Double Yes 0.560
0.24
Yes
4V' x 6'0" , 24 ft2
2 ft 0 in
2 ft 0 in
Blinds 45°
outdoor
21
SW 32 Metal
Low-E Double Yes 0.430
0.26
Yes
5'0" x 2'0" , 10 ft2
2 ft 0 in
2 ft 0 in
Blinds 45°
outdoor
22
SW 33 Metal
Low-E Double Yes 0.430
0.26
Yes
5'0" x 2'0" , 10 ft2
2 ft 0 in
2 ft 0 in
Blinds 45°
outdoor
23
SW 34 Metal
Low-E Double Yes 0.430
0.26
Yes
510" x 2'0" 10 ft2 2 ft 0 in
2 ft 0 in
Blinds 45°
outdoor
GARAGE
✓ #
Floor Area Ceiling Area Exposed Wall Perimeter Avg. Wall Height
Exposed Wall Insulation
1
0
INFILTRATION
Scope
Method SLA
C M 50
ElA E LA
ACH
ACH 50
1
Wholehouse Blower Door 0.000490
5106
280.9 527.4
0.53 7.00
HEATING SYSTEM
✓ #
System Type Subtype
Efficiency
Capacity
Block
Ducts
1
Electric strip
AFUE: 100.0 43.0 kBtu/hr
1
sys#1
2
Electric strip
AFUE: 100.0 19.8 kBtu/hr
2
sys#2
4022-Jan-06 16:03:40
wr igihtsoft° Right -Suite® Universal 2021 21.0.11 RSU27054 Right -Energy® Florida 2020 Section R405.4.1 Compliant So are Page 5
ANfA'J Ntiw ftk�"&.V.ZV ... cuments%Wrightsoft HVAC110930 Myrtlewood Ln.rup Calc= MJe Front Doorfaces: N
re%nn e n Anc nnnn
COOLING SYSTEM
✓ #
System Type
Subtype Efficiency
Capacity Air Flow
SHR
Block
Ducts
1
Split air conditioner
SEER: 15.0
47.0 kBtu/hr 1567 cfm
0.70
1
sys#1
2
S lit air conditioner
SEER: 16.0 18.0 kBtu/hr 600 cfm
0.70
2
s s#2
HOT WATER SYSTEM
1 #
System Type Subtype
Location EF Cap
Use
SetPnt
Conservation
1 Propane instantaneous
0.93 UEF 0 gal
60 al
120 °F
None
DUCTS
-----
-- Return -----
Air
CFM 25
Percent
HVAC #
✓Supply
# Location R-Value Area
Location Area Leakage Type
Handler
Out
Leakage
QN
RLF Heat Cool
1 AH 1 Attic 6.0 684ft2
AH 1 Attic 61 ft2 Default Leakage (Unconditioned)
Default
6.00
0.08
1 1
2 AH 2 Attic 6.0 254 ft2
AH 2 Attic 165 ft2 Default Leakage (unconditioned)
(Default)
6.00
0.08
2 2
TEMPERATURES
Programmable Thermostat: Y
Ceiling Fans:
Cooling [ X ]Jan
[ X] Feb [ X1 Mar
X] Apr [ X] May [ X] Jun [ X] Jul
[ X] Aug
[ X] Sep
[ X] Oct
[ X] Nov
[ X] Dec
Heating [ X ]Jan
[ X] Feb [X] Mar
IX
Apr [ X] May [ X] Jun [ X] Jul
[ X] Aug
[ X] Sep
[ X] Oct
[ X] Nov
[ X] Dec
Venting [ X ]Jan
[ X] Feb [ X] Mar
[ X]
Apr [ X] May [ X] Jun [ X] Jul
[ X] Aug
[ X] Sep
[ X] Oct [ X] Nov
[ X] Dec
Thermostat Schedule: Florida Building Code, 7th Edition Hours
Schedule Type
2020 1
2
3 4 5 6
7
8
9
10
11
12
Cooling (WD)
AM 75
75
75 75 75 75
75
75
75
75
75
75
PM 75
75
75 75 75 75
75
75
75
75
75
75
Cooling (WEH)
AM 75
75
75 75 75 75
75
75
75
75
75
75
PM 75
75
75 75 75 75
75
75
75
75
75
75
Heating (WD)
AM 72
72
72 72 72 72
72
72
72
72
72
72
PM 72
72
72 72 72 72
72
72
72
72
72
72
Heating (WEH)
AM 72
72
72 72 72 72
72
72
72
72
72
72
PM 72
72
72 72 72 72
72
72
72
72
72
72
- 40
wrlg tSofte Right -Suite® Universal 2021 21.0.11 RSU27054 Right -Energy® Florida 2020 Section R405.4.1 Compliant Software Jan-os 1 P ge s
Aak;.l ... cumentsXVVrightsoft HVAC\10930 Myrtlewood Ln.rup Calc = MJB Front Door faces: N
FORM R405-2020
ENERGY PERFORMANCE LEVEL (EPL) DISPLAY CARD
ESTIMATED ENERGY PERFORMANCE INDEX = 77
The lower the EnergyPerformance Index, the more efficient the home.
1. New home or addition 1. New (From Plans) 12. Ducts, location & insulation level
a. Supply ducts: R 6.0
2. Single-family or multiple -family 2. Single -Family b. Return ducts: R 6.0
c. AHU location: (Unconditioned),(Unconditioned)
3. Number of units, if multiple -family
3.
1
4. Number of bedrooms
r.
4.
3
5. Is this a worst case? (yes/no)
5.
Yes
6. Conditioned floor area (ft2)
6.
3981.75
7. Windows, type and area*
a. U-Factor:
Dbldm2act(Avg), 0.612
b. Solar Heat Gain Coefficient (SHGC):
7b.
0.23
c. Area (fF)
7c.
681
8. Skylights
a. U-Factor:
8a.
b. Solar Heat Gain Coefficient (SHGC):
8b.
9. Floor type, insulation level
a. Slab -on -grade (R-value):
9a.
0.0
b. Wood, raised (R-value):
9b.
c. Concrete, raised (R-value)
9c.
10 Wall type and insulation:
a. Exterior:
1. Wood frame (insulation R-value):
10al.
2. Masonry (Insulation R-value):
10a2.
4
b. Adjacent:
1. Wood frame (Insulation R-value):
10bl.
11
2. Masonry (Insulation R-value):
10b2.
11. Ceiling type and insulation level
a. Under attic (R-value):
11 a.
0.0
b. Single assembly (R-value):
11 b.
c. Knee walls/skylight walls (R-value)
11c.
d. Radiant barrier installed
11 d.
13. Cooling systems
Capacity
65.0
a. Split system:
SEER
16.00
b. Single package:
SEER
c. Ground/water source: SEER/COP
d. Room unit/PTAC:
EER
e. Other:
14. Heating systems
Capacity
62.8
a. Split system heat pump:
HSPF
b. Single package heat pump:
HSPF
c. Electric resistance:
COP
100.00
d. Gas furnace, natural gas:
AFUE
e. Gas furnace, LPG:
AFUE
f. Other:
15. Water heating systems
a. Electric resistance:
b. Gas fired, natrual gas:
c. Gas fired, LPG:
0.93 UEF
d. Solar system with tank:
e. Dedicated heat pump with tank:
f. Heat recovery unit:
HeatRec%
g. Other:
16. HVAC credits claimed (Performance Method)
a. Ceiling fans:
b. Cross ventilation:
c. Whole house fan:
d. Multizone cooling credit:
Yes
e. Multizone heating credit:
Yes
f. Programmable thermostat:
Yes
*Label required by Section 303.1.3 of the Florida Building Code, Energy Conservation, if not DEFAULT.
I certify that this home has complied with the Florida Building Code, Energy Conservation,through the above energy saving features
which will be installed (or exceeded) in this home before final inspection. Otherwise, a new EPL Display Card will be completed
based on installed Code compliant features.
Builder Signature: Date:
Address of New Home: 10930 Myrtlewood Ln City/FL Zip: Port St Lucie, FL 34986
2022-Jan-06 16:03:40
- - rnrrightSOW Right-Suite®Universal 2021 21.0.11 RSU27054 Right -Energy® Florida2020 SectionR405.4.1 Compliant Software
Page
em4.4-1 Utd;wrdxf.Wr ...cuments\Wrightsoft HVAC\10930 Myrtlewood Ln.rup Calc = MJB Front Doorfaces: N
FORM R405-2020
Florida Building Code, Energy Conservation, 7th Edition (2020)
Mandatory Requirements for Residential Performance, Prescriptive and ERI Methods
ADDRESS: 10930 Myrtlewood Ln PERMIT #:
Port St Lucie, FL 34986
MANDATORY REQUIREMENTS - See individual code sections for full details.
SECTION R401 GENERAL
R401.3 Energy Performance Level (EPL) display card (Mandatory). The building official shall require that an energy performance level (EPL)
display card be completed and certified by the builder to be accurate and correct before final approval of the building for occupancy. Florida law
(Section 553.9085, Florida Statues) requires the EPL display card to be included as an addendum to each sales contract for both presold and
ngnpresold residential buildings. The EPL display card contains information indicating the energy performance level and efficiencies of components
installed in a dwelling unit. completed and signed by the builder The building official shall verify that the EPL display card accurately reflects the plans
and specifications submitted to demonstrate compliance for the building. A copy of the EPL display card can be found in Appendix RD.
SECTION R402 BUILDING THERMAL ENVELOP
R402.4 Air leakage (Mandatory). The building thermal envelope shall be constructed to limit air leakage in accordance with the requirements of
Sections R402.4.1 through R402.4.5.
Exception: Dwelling units of R-2 Occupancies and multiple attached single family dwellings shall be permitted to
comply with Section C402.5.
R402.4.1 Building thermal envelope. The building thermal envelope shall comply with Sections R402.4.1.1 and R402.4.1.2. The sealing
methods between dissimilar materials shall allow for differential expansion and contraction.
R402.4.1.1 Installation. The components of the building thermal envelope as listed in Table R402.4.1.1 shall be installed in accordance
with the manufacturer's instructions and the criteria listed in Table 402.4.1.1, as applicable to the method of construction. Where required
by the code official, an approved third party shall inspect all components and verify compliance.
R402.4.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate not exceeding seven air
changes per hour in Climate Zones 1 and 2, and three air changes per hour in Climate Zones 3 through 8. Testing shall be conducted in
accordance with ANSI/RESET/ICC 380 and reported at a pressure of 0.2 inch w.g. (50 Pascals). Testing shall be conducted by either
individuals as defined in Section 553.993(5) or (7), Florida Statutes or individuals licensed as set forth in Section 489.105(3)(f) (g), or (i) or
an approved third party. A written report of the results of the test shall be signed by the party conducting the test and provided to the code
official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope.
Exception: Testing is not required for additions, alterations, renovations, or repairs, of the building thermal envelope of existing
buildings in which the new construction is less than 85 percent of the building thermal envelope.
During testing:
1. Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended
weatherstripping or other infiltration control measures.
2. Dampers including exhaust, intake, makeup air, backdraft and flue dampers shall be closed, but not sealed beyond
intended infiltration control measures.
3. Interior doors, if installed at the time of the test, shall be open.
4. Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed.
5. Heating and cooling systems, if installed at the time of the test, shall be turned off.
6. Supply and return registers, if installed at the time of the test, shall be fully open.
R402.4.2 Fireplaces. New wood -burning fireplaces shall have tight -fitting flue dampers or doors, and outdoor combustion air. Where
using tight -fitting doors on factory -built fireplaces listed and labeledin accordance with UL 127, the doors shall be tested and listed for the
fireplace. Where using tight-figging doors on masonry fireplaces,the doors shall be listed and labeled in accordance with UL 907.
R402.4.3 Fenestration air leakage. Windows, skylights and sliding glass doors shall have an air infiltration rate of no more than 0.3 cfm per
square foot (1.5 Us/m2), and swinging doors no more than 0.5 cfm per square foot (2.6 Us/m2), when tested according to NFRC 400 or
AAMA/WDMA/CSA 101/I.S.2/A440 by an accredited, independent laboratory and listed and labeled by the manufacturer.
Exception: Site -built windows, skylights and doors.
2022-Jan-06 16:03:40
-{ - wrightsoftV Right -Suite® Universal 2021 21.0.11 RSU27054 Right -Energy® Florida 2020 Section R405.4.1 Compliant Software Page 8
...cements\Wrightsoft HVAC\10930 Myrtlewood Ln.rup Calc = MJ8 Front Door faces: N
FORM R405-2020
MANDATORY REQUIREMENTS -(Continued)
R402.4.4 Rooms containing fuel -burning appliances In Climate Zones 3 through 8, where open combustion air ducts provide combustion air to
open combustion fuel burning appliances, the appliances and combustion air opening shall be located outside the building thermal envelope or
enclosed in a room, isolated from inside the thermal envelope. Such rooms shall be sealed and insulated in accordance with the envelope requirements
of Table R402.1.2, where the walls, floors and ceilings shall meet not less than the basement wall R-value requirement. The door into the room shall be
fully gasketed and any water lines and ducts in the room insulated in accordance with Section R403. The combustion air duct shall be insulated where it
passes through conditioned space to a minimum of R-8.
Exceptions:
1. Direct vent apliances with both intake and exhaust pipes installed continuous to the outside.
2. Fireplaces and stoves complying with Section R402.4.2 and Section R1006 of the Florida Building Code, Residential.
❑R402.4.5 Recessed lighting. Recessed luminaires installed in the building thermal envelope shall be sealed to limit air leakage
between conditioned and unconditioned spaces. All recessed luminaires shall be IC -rated and labeled as having an air leakage rate not
more than 2.0 cfm (0.944 Us) when tested in accordance with ASTM E283 at a 1.57 psf (75 Pa) pressure differential. All recessed
luminaires shall be sealed with a gasket or caulk between the housing and the interior wall or ceiling covering.
SECTION R403 SYSTEMS
R403.1 Controls
11403.1.1 Thermostat provision (Mandatory). At least one thermostat shall be provided for each separate heating and cooling system.
R403.1.3 Heat pump supplementary heat (Mandatory). Heat pumps having supplementary electric -resistance heat shall have controls
that, except during defrost, prevent supplemental heat operation when the heat pump compressor can meet the heating load.
R403.3.2 Sealing (Mandatory). All ducts, air handlers, filter boxes and building cavities that form the primary air containment passageways
for air distribution systems shall be considered ducts and plenum chambers, shall be constructed and sealed in accordance with Section
C403.2.9.2 of the Commercial Provisions of this code and shall be shown to meet duct tightness criteria below.
Duct tightness shall be verified by testing in accordance with ANSI/RESNET/ICC 380 by either individuals as defined in Section 553.993(5) or (7),
Florida Statutes, or individuals licensed as set forth in Section 489.105(3)(f), (g), or (i), Florida Statutes, to be "substantially leak free" in
accordance with Section R403.3.3.
R403.3.2.1 Sealed air handier. Air handlers shall have a manufacturer's designation for an air leakage of no more than 2 percent
of the design air flow rate when tested in accordance with ASHRAE 193.
0 R403.3.3 Duct testing (Mandatory). Ducts shall be pressure tested to determine air leakage by one of the following methods:
1. Rough -in test: Total leakage shall be measured with a pressure differential of 0.1 inch w.g. (25 Pa) across the system, including the
manufacturer's air handler enclosure if installed at the time of the test. All registers shall be taped or otherwise sealed during the test.
2. Post construction test: Total leakage shall be measured with a pressure differential of 0.1 inch w.g. (25 Pa) across the
entire system, including the manufacturer's air handler enclosure. All registers shall be taped or otherwise sealed during the test.
Exceptions:
1. A duct leakage test shall not be required where the ducts and air handlers are located entirely within the building thermal envelope.
2. Duct testing is not mandatory for buildings complying by Section 405 of this code. Duct leakage testing is required
for Section R405 compliance where credit is taken for leakage, and a duct air leakage Qn to the outside of less
than 0.080 (where Qn = duct leakage to the outside in cfm per 100 square feet of conditioned floor area tested at 25 Pascals)
is indicated in the compliance report for the proposed design.
A written report of the results of the test shall be signed by the party conducting the test and provided to the code official.
0 R403.3.5 Building Cavities (Mandatory). Building framing cavities shall not be used as ducts or plenums.
R403.4 Mechanical system piping insulation (Mandatory). Mechanical system piping capable of carrying fluids above 105°F (41°C)
or below 55"F (13°C) shall be insulated to a minimum of R 3.
R403.4.1 Protection of piping insulation. Piping insulation exposed to weather shall be protected from damage, including that
caused by sunlight, moisture, equipment maintenance, and wind, and shall provide shielding from solar radiation that can cause
degradation oft the material. Adhesive tape shall not be permitted.
R403.5.1 Heated water circulation and temperature maintenance systems (Mandatory). Heated water circulation systems shall be in
accordance with Section R403.5.1.1. Heat trace termperature maintenance systems shall be in accordance with Section R403.5.1.2.
Automatic controls, temperature sensors and pumps shall be accessible. Manual controls shall be readily accessible.
R403.5.1.1 Circulation systems. Heated water circulation systems shall be provided with a circulation pump. The system return pipe
shall be dedicated return pipe or a cold water supply pipe. Gravity and thermosiphon circulation systems shall be prohibited.
Controls for circulating hot water system pumps shall start the pump based on the identification of a demand for how water within the
occupancy. The controls shall automatically turn off the pump when the water in the circulation loop is at the desired temperature and
when there is no demand for hot water.
R403.5.1.2 Heat trace systems. Electric heat trace systems shall comply with IEEE 515.1 or UL 515. Controls for such systems
shall automatically adjust the energy input to the heat tracing to maintain the desired water temperature in the piping in accordance
with the times when heated water is used in the occupancy.
�- Wr1J3 1ftOfV 9 g gy 2022-Jan-0616:0e
Ri ht-Suite®Universal 2021 21.0.11 RSU27054 Ri ht-Ener ®Florida 2020 Section R405.4.1 Compliant Software Page 9
euragsaH+bisamaur ...cumentslwrightso8 HVAC110930 Myrtlewood Ln.rup Cale = MJS Front Door faces: N
FORM R405-2020
MANDATORY REQUIREMENTS -(Continued)
rl R403.5.5 Heat traps (Mandatory). Storage water heaters not equipped with integral heat traps and having vertical pipe risers shall have heat
traps installed on both the inlets and outlets. External heat traps shall consist of either a commercially available heat trap or a
downward and upward bend of at least 3 1/2 inches (89 mm) in the hot water distribution line and cold water line located as close as
possible to the storage tank.
R403.5.6 Water heater efficiencies (Mandatory).
R403.5.6.1 Storage water heater temperature controls.
R403.5.6.1.1 Automatic controls. Service water heating systems shall be equipped with automatic temperature controls capable
of adjustment from the lowest to the highest acceptable temperature settings for the intended use. The minimum temperature
setting range shall be f rom 100°F to 140°F (38°C to 60°C).
R403.5.6.1.2 shut down. A separate switch or a clearly marked circuit breaker shall be provided to permit the power supplied
to electric service systems to be turned off. A separate valve shall be provided to permit the energy supplied to the main burner(s)
of combustion types of service water heating systems to be turned off.
ElR403.5.6.2 Water heating equipment. Water heating equipment installed in residential units shall meet the minimum efficiencies of
Table C404.2 in Chapter 4 of the Florida Building Code, Energy Conservation, Commercial Provisions, for the type of equipment
installed. Equipment used to provide heating functions as part of a combination system shall satisfy all stated requirements for the
appropriate water heating category. Solar water heaters shall met the criteria of Section R403.5.6.2.1.
R403.5.6.2.1 Solar water heating system. Solar systems for domestic hot water production are rated by the annual solar energy
factor of the system. The solar energy factor of a system shall be determined from the Florida Solar Energy Center Directory of
Certified Solar Systems. Solar collectors shall be tested in accordance with ISO Standard 9806, Test Methods for Solar Collectors,
and SRCC Standard TMA, Solar Domestic Hot Water System and Component Test Protocol. Collectors in installed solar
water -heating systems should meet the following criteria:
1. Be installed with a tilt angle between 10 degrees and 40 degrees of the horizontal; and
2. Be installed at an orientation within 45 degrees of true south.
ElR403.6 Mechanical ventilation (Mandatory). The building shall be provided with ventilation that meets the requirements of the Florida
Building Code, Residential or Florida Building Code, Mechanical, as applicable, or with other approved means of ventilation, including:
Natural, Infiltration or Mechanical means. Outdoor air intakes and exhausts shall have automatic or gravity dampers that close when the
ventilation system is not operating.
ElR403.6.1 Whole -house mechanical ventilation system fan efficacy. When installed to function as a whole -house mechanical
ventilation system, fans shall meet the efficacy requirements of Table R403.6.1.
Exception: Where mechanical ventilation fans are integral to tested and listed HVAC equipment, they shall be powered by
an electronically commutated motor.
R403.6.2 Ventilation air. Residential buildings designed to be operated at a positive indoor pressure of for mechanical
ventilation shall meet the following criteria:
1. The design air change per hour minimums for residential buildings in ASHRAE 62.2, Ventilation for Acceptable
Indoor Air Quality, shall be the maximum rates allowed for residential applications.
2. No ventilation or air-conditioning system make-up air shall be provided to conditioned space from attics,
crawlspaces, attached enclosed garages or outdoor spaces adjacent to swimming pools or spas.
3. If ventilation air is drawn from enclosed spaces(s), then the walls of the space(s) from which air is drawn shall be
insulated to a minimum of R-11 and the ceiling shall be insulated to a minimum or R-19, space permitting, or R-10 otherwise.
R403.7 Heating and cooling equipment.
R403.7.1 Equipment sizing (Mandatory). Heating and cooling equipment shall be sized in accordance with ACCA Manual S based on the
equipment loads calculated in accordance with ACCA Manual J or other approved methodologies, heating and cooling calculation
based on building loads for the directional orientation of the building. The manufacturer and model number of the outdoor and
indoor units (if split system) shall be submitted along with the sensible and total cooling capacities at the design conditions
described in Section R302.1. This code does not allow designer safety factors, provisions for future expansion or other factors that
affect equipment sizing. System sizing calculations shall not include loads created by local intermittent mechanical ventilation such
as standard kitchen and bathroom exhaust systems. New or replacement heating and cooling equipment shall have an efficiency
rating equal to or greater than the minimum required by federal law for the geographic location where the equipment is installed.
TABLE R403.6.1
WHOLE -HOUSE MECHANICAL VENTILATION SYSTEM FAN EFFICACY
FAN LOCATION
AIRFLOW RATE MINIMUM
CFM
MINIMUM EFFICACY (a)
CFMNVATT
AIRFLOW RATE MAXIMUM
CFM
HRV or ERV
Any
1.2 cfm/watt
Any
Range hoods
Any
2.8 cfm/watt
Any
In -line fan
Any
2.8 cfm/watt
Any
Bathroom, utility room
10
1.4 cfm/watt
< 90
Bathroom, utility room
90
2.8 cfm/watt
Any
For SI: 1 cfm - 28.3 L/min.
(a) When tested in accordance HVI Standard 916
2o22-Jan-06 16:03:40
weights Right -Suite® Universal 2021 21.0.11 RSU27054 Right -Energy® Florida 2020 Section R405.4.1 Compliant Software Page 10
r nW a•aa L,, � cuments\Wrightsoft HVAC\10930 Myrilewood Ln.rup Calc= MJ8 Front Doorfaces: N
MANDATORY REQUIREMENTS -(Continued)
R403.7.1.1 Cooling equipment capacity. Cooling only equipment shall be selected so that its total capacity is not less
than the calculated total load but not more than 1.15 times greater than the total load calculated according to the procedure selected in
Section 403.7, or the closest available size provided by the manufacturer's product lines. The corresponding latent capacity of the
equipment shall not be less than the calculated latent load.
The published value for AHRI total capacity is a nominal, rating -test value and shall not be used for equipment sizing. Manufacturer's
expanded performance data shall be used to select cooling -only equipment. This selection shall be based on the outdoor design dry-bulb
temperature for the load calculation (or entering water temperature for water -source equipment), the blower CFM provided by the expanded
performance data, the design value for entering wet -bulb temperature and the design value for entering dry-bulb temperature
Design values for entering wet -bulb and dry-bulb temperatures shall be for the indoor dry bulb and relative humidity used for the load
calculation and shall be adjusted for return side gains if the return duct(s) is installed in an unconditioned space.
Exceptions:
1. Attached single- and multiple -family residential equipment sizing may be selected so that its cooling capacity is
less than the calculated total sensible load but not less than 80 percent of that load.
2. When signed and sealed by a Florida -registered engineer, in attached single- and multiple -family units, the
capacity of equipment may be sized in accordance with good design practice.
R403.7.1.2 Heating equipment capacity.
R403.7.1.2.1 Heat pumps Heat pump sizing shall be based on the cooling requirements as calculated according to Section
R403.7.1.1, and the heat pump total cooling capacity shall not be more than 1.15 times greater than the design cooling load even if
the design heating load is 1.15 times greater than the design cooling load.
R403.7.1.2.2 Electric resistance furnaces. Electric resistance furnaces shall be sized within 4 kW of the design
requirements calculated according to the procedure selected in Section R403.7.1
El R403.7.1.2.3 Fossil fuel heating equipment. The capacity of fossil fuel heating equipment with natural draft atmospheric burners
shall not be less than the design load calculated in accordance with Section R403.7.1.
R403.7.1.3 Extra capacity required for special occasions. Residences requiring excess cooling or heating equipment capacity on an
intermittent basis, such as anticipated additional loads caused by major entertainment events, -shall have equipment sized or controlled to
prevent continuous space cooling or heating within that space by one or more of the following options:
1. A separate cooling or heating system is utilized to provide cooling or heating to the major entertainment areas.
2. A variable capacity system sized for optimum performance during base load periods is utilized.
R403.8 Systems serving multiple dwelling units (Mandatory). Systems serving multiple dwelling units shall comply with Sections
C403 and C404 of the IECC—Commercial Provisions in lieu of Section R403.
R403.9 Snow melt and ice system controls (Mandatory). Snow- and ice -melting systems, supplied through energy service to the building,
shall include automatic controls capable of shutting off the system hen the pavement temperature is above 50°F (I VC), and no
precipitation is falling and an automatic or manual control that w ill allow s hutoff w hen the outdoor temperature is above 40°F (4.8°C).
R403.10 Pools and permanent spa energy consumption (Mandatory). The energy consumption of pools and permanent spas
shall be in accordance with Sections R403.10.1 through R403.10.5.
R403.10.1 Heaters. The electric power to heaters shall be controlled by a readily accessible on -off switch that is an
integral part of the heater mounted on the exterior of the heater, or external to and within 3 feet (914 mm) of the heater. Operation
of such switch shall not change the setting of the heater thermostat. Such switches shall be in addition to a circuit breaker for the
power to the heater. Gas -fired heaters shall not be equipped with continuously burning ignition pilots.
R403.10.2 Time switches. Time switches or other control methods that can automatically turn off and on according to a preset schedule
shall be installed for heaters and pump motors. Heaters and pump motors that have built-in time switches shall be in compliance with this
section.
Exceptions:
1. Where public health standards require 24-hour pump operations.
2. Pumps that operate solar- and waste -heat -recovery pool heating systems.
3. Where pumps are powered exclusively from on -site renewable generation.
R403.10.3 Covers. Outdoor heated swimming pools and outdoor permanent spas shall be equipped with a vapor- retardant cover on or at
the water surface or a liquid cover or other means proven to reduce heat loss.
Exception- Where more than 70 percent of the energy for heating, computed over an operation season, is from site -recovered
energy, such as from a heat pump or solar energy source, covers or other vapor -retardant means shall not be required.
❑ R403.10.4 Gas- and oil -fired pool and spa heaters. All gas- and oil -fired pool and spa heaters shall have a minimum thermal
efficiency of 82 percent for heaters manufactured on or after April 16, 2013, when tested in accordance with ANSI Z 21.56. Pool
heaters fired by natural or LP gas shall not have continuously burning pilot lights.
u 2022-Jan-06 16:03:40
rUKi'ightsoft Right -Suite® Universal 2021 21.0.11 RSU27054 Right -Energy® Florida 2020 Section R405.4.1 Compliant Software Page 11
...cuments\Wrightsoft HVACN 0930 Myrtlewood Ln.rup Calc = MJ8 Front Door faces: N
MANDATORY REQUIREMENTS - (Continued)
R403.10.5 Heat pump pool heaters. Heat pump pool heaters shall have a minimum COP of 4.0 when tested in accordance
with AHRI 1160, Table 2, Standard Rating Conditions -Low Air Temperature. A test report from an independent laboratory is
required to verify procedure compliance. Geothermal swimming pool heat pumps are not required to meet this standard.
R403.11 Portable spas (Mandatory). The energy consumption of electric -powered portable spas shall be controlled by the
requirements of APSP-14.
R403.13 Dehumidifiers (Mandatory) If installed, a dehumidifier shall conform to the following requirements:
1. The minimum rated efficiency of the dehumidifier shall be greater than 1.7 liters/ kWh if the total dehumidifier capacity for the house
is less than 75 pints/day and greater than 2.38 liters/kWh if the total dehumidifier capacity for the house is greater than or equal to 75 pints/day.
2. The dehumidifier shall be controlled by a sensor that is installed in a location where it is exposed to mixed house air.
3. Any dehumidifier unit located in unconditioned space that treats air from conditioned space shall be insulated to a minimum of R-2.
4. Condensate disposal shall be in accordance with Section M1411.3.1 of the Florida Building Code, Residential.
❑ R403.13.1 Ducted dehumidifiers Ducted dehumidifiers shall, in addition to conforming to the requirements of Section R403.13,
conform to the following requirements:
1. If a ducted dehumidifier is configured with return and supply ducts both connected into the supply side of the cooling system, a backdraft
damper shall be installed in the supply air duct between the dehumidifier inlet and outlet duct.
2. If a ducted dehumidifier is configured with only its supply duct connected into the supply side of the central heating and cooling system,
a backdraft damper shall be installed in the dehumidifier supply duct between the dehumidifier and central supply duct.
3. A ducted dehumidifier shall not be ducted to or from a central ducted cooling system on the return duct side upstream from the
central cooling evaporator coil.
4. Ductwork associated with a dehumidifier located in unconditioned space shall be insulated to a minimum of R-6.
SECTION R404
ELECTRICAL POWER AND LIGHTING SYSTEMS
R404.1 Lighting equipment (Mandatory). Not less than 90 percent of the lamps in permanently installed luminaires shall have an
efficacy of at least 45 lumens -per -watt or shall utilize lamps with an efficacy of not less than 65 lumens -per -watt.
Exception: Low -voltage lighting.
R404.1.1 Lighting equipment (Mandatory). Fuel gas lighting systems shall not have continuously burning pilot lights.
2022-Jan-06 16:03:40
1�Vrlght o tO Right -Suite® Universal 2021 21.0.11 RSU27054 Right -Energy® Florida 2020 Section R405.4.1 Compliant Software page 12
,erza•ia ;•s, c ...cuments\\Mightsoft HVAC\10930 Myrtiewood Ln.rup Calc= MJ8 Front Doorfaces: N
FORM R405-2020
TABLE 402.4.1.
AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA
Project Name: Reed Residence Builder Name Telese Builders
Street: 10930 Myrtlewood Ln Permit Office:
City State, Zip: Port St Lucie, FL 34986 Permit Number:
Owner: Mark & Iris Reed Jurisdiction: St Lucie
Design Location: FL, St Lucie Co Intl
COMPONENT
AIR BARRIER CRITERIA
INSULATION INSTALLATION CRITERIA
General
A continuous air barrier shall be installed in the building envelope. The exterior thermal envelope
Air-p rmabiq insulation shall not be used as a
❑
requirements
q
contains a continuous barrier. Breaks or joints in the
9
-
air barrier shall be sealed.
Ceilinglattic
The air barrier in any dropped ceiling/soffit
The insulation in any dropped ceiling/soffit
shall be aligned with the insulation and any
shall be aligned with the air barrier.
gaps in the air barrier shall be sealed.
❑
-
Access openings, drop down stairs or knee wall doors
to unconditioned attics paces shall be sealed.
Walls
The junction of the foundation and sill plate
Cavities with corners and headers of frame walls
shall be sealed.The junction of the top plate
shall be insulated by completely filling the cavity
and the top of exterior walls shall be sealed.
with a material having a thermal resistance of R-3
❑
Knee walls shall be sealed.
per inch minimum.
Exterior thermal envelope insulation for framed
walls shall be installed in substantial contact and
continuous alignment with the air barrier
Windows, skylights
doors
The sppace between window/door jambs and framing,
sUlghts and framing shall be sealed.
❑
and
and
Rim joists are insulated and include an air
Rim joists shall be insulated.
❑
Rim joists
barrier.
Floors (including
The air barrier shall be installed at any exposed
Floor framing cavity Insulation shall be installed
above -garage and
edge of insulation.
to maintain permanent contact with the underside
cantilevered floors)
of subfloor decking, or floor framing cavity
insulation shall be permitted to be in contact
❑
With the top sideof sheathing, or continuous
insulation installed on the underside of floor
framing and extends from the bottom to the top of
all perimeter floor framing members.
Crawl space
Exposed earth in unvented crawl spaces shall be
Where provided in lieu of floor insulation,
❑
walls
covered with a Class I vapor retarder with
insulation shall be permanently attached
overlapping joints taped.
to the crawlspace walls.
Shafts, penetrations
Duct shafts, utility penetrations, and flue shaft
❑
openings to exterior or unconditioned space shall
be sealed.
Narrow cavities
Batts in narrow cavities shall be cut to fit, or
narrow cavities shall be filled by insulation that
❑
on installation readily conforms to the available
cavity spaces.
Garage
Air sealing shall be provided between the garage
❑
separation
and conditioned spaces.
Recessed
Recessed tight fixtures installed in the building
Recessed light fixtures installed in the
be tight
❑
lighting
thermal envelope shall be sealed to the finished surface.
building thermal envelope shall air
and IC rated.
Plumbing and
Batt insulation shall be cut neatly to fit around
wiring
wiring and plumbing in exterior walls, or
insulation that on installation readily conforms
❑
to available space shall extend behind piping
and wiring.
Shower/tub on
The air barrier shall be installed behind
Exterior walls adjacent to showers and tubs
❑
exterior wall
electrical or communication boxes or air -sealed
shall be insulated.
boxes shall be installed.
Electricallphone
The air barrier shall be installed behind
❑
box on exterior
electrical or communication boxes or air -sealed
walls
boxes shall be installed.
HVAC register
HVAC supply and return register boots that penetrate
❑
boots
building thermal envelope shall be sealed to the
subfloor, wall covering or ceiling penetrated by the boot.
Concealed
When required to be sealed, concealed fire
sprinklers
sprinklers shall only be sealed in a manner that
is recommended by the manufacturer.
❑
Caulking or other adhesive sealants shall not be
used to fill voids between fire sprinkler cover
plates and walls or ceilings.
a. In addition, inspection of log walls shall be in accordance with the provisions of ICC-400.
2022-Jan-06 16:03:40
- ' wrightSaf o Right -Suite® Universal2021 21.0.11 RSU27054 Right -Energy® Florida 2020 Section R405.4.1 Compliant Sofiware Page 13
seexx•im..�e.3.a+�w�r ...cuments\Wrightsoft HVAC110930 Myrtlewood Ln.rup Calc = MJ8 Front Doorfaces: N
FORM R405-2020
Envelope Leakage Test Report (Blower Door Test)
Residential Prescriptive, Performance or ERI Method Compliance
2020 Florida Building Code, Energy Conservation, 7th Edition
Jurisdiction: St Lucie
Permit Number:
Job Information
Builder: Telese Builders Community: Lot:
Address: 10930 Myrtlewood Ln Unit:
City: Port St Lucie State: FL Zip: 34986
Ail' Leakage Test Res UItSPassing results must meet either the Performance, Prescriptive, or ERI Method.
I'EIPRESCRIPTIVE METHOD The building or dwelling unit shall be tested and verified as havingan air leakage rate of not exceeding
7 airchanges.per hour at a pressure of 0.2 inch w.g. (50 pascalin Climate Zones 1 and 2.
The building or dwelling unit shall be tested and verified as having an air leakage rate of not
PERFORMANCE or ERI METHOD exceeding the selected ACH(50) value, as shown on FORM R405-2020 (Performance) or
R406-2020 (ERI), section labeled as Infiltration, sub -section ACH50.
ACH(50) specified on Form R405-2020-Energy Calc (Performance) or R406-2020 (ERI): 7,000
x60 - 43767 - Method for calculating building volume:
CFM(50) Building Volume ACH(50) ❑ Retrieved from architectural plans
❑ PASS E Code software calculated
❑ Field measured and calculated
❑ When ACH(50) is less than 3, Mechanical Ventilation installation
must be verified by building department.
R402.4.1.2 Testing. Testing shall be conducted in accordance with ANSI/RESNET/ICC 380 and reported at a pressure of 0.2 inch w.g.
(50 Pascals). Testing shall be conducted by either individuals as defined in Section 553.993(5) or (7), Florida Statues, or individuals
licensed as set forth in Section 489.105(3)(f), (g), or (i) or and approved third party. A written report of the results of the test shall be
signed by the party conducting the test and provided to the code official. Testing shall be performed at any time after creation of all
penetrations of the building thermal envelope.
During testing:
1. Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended weatherstripping or
other infiltration control measures.
2. Dampers including exhaust, intake, makeup air, back draft and flue dampers shall be closed, but not sealed beyond intended
infiltration control measures.
3. Interior doors, if installed at the time of the test, shall be open.
4. Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed.
5. Heating and cooling systems, if installed at the time of the test, shall be turned off.
6. Supply and return registers, if installed at the time of the test, shall be fully open.
Testing Company
Company Name: Phone:
I hereby verify that the above Air Leakage results are in accordance with the 2020 7th Edition Florida Building Code
Energy Conservation requirements according to the compliance method selected above.
Signature of Tester: Date of Test:
Printed Name of Tester:
License/Certification #: Issuing Authority:
2022-Jan-06 16:03:40
- - {A/rightSofV Right -Suite® Universal 2021 21.0.11 RSU27054 Right -Energy® Florida 2020 Section R405.4.1 Compliant Software Page 14
ex;.rre ca,onevr. ...cuments\Wnghtsoft HVAC110930 Myrtlewood Ln.rup Calc = MJ8 Front Door faces: N
FORM R405-2020
Duct Leakage Test Report
Residential Perscriptive, Performance or ERI Method Compliance
2020 Florida Building Code, Energy Conservation, 7th Edition
Jurisdiction: St Lucie Permit Number:
Job Information
Builder: Telese Builders Community: Lot:
Address: 10930 Myrtlewood Ln Unit:
City: Port St Lucie State: FL Zip: 34986
`Duct Leakage Test Results '
System 1
cfm25
System 2
cfm25
System 3
cfm25
Sum of any
additional systems
cfm25
Total ems 11
cfm25
_ 3982 _ Qn
Total of all Total Conditioned
systems Square Footage
❑ PASS ❑ FAIL
❑ Prescriptive Method, cfm25 (Total)
1 p; qualify as "substantially leak free" Qn Total must be less
than or equal to 0.04 if air handler unit is installed. If air handler
`urit is not installed, Qn Total must be less than or equal to
-6.03. This;testing method meets the requirements in
accordance with Section R403.3.3.
is the air handler unit installed ❑ YES (<= 0.04 Qn)
during testing? NO (<=0.03Qn)
❑✓ Performance / ERI Method 6fm25 (Out or Total)
To qualify using this method, Qn. must be not greater than the
proposed duct leakage Qn specified on Form R405-2020 or
R406-2020.
',..,Leakage Type selected on Form Qn specified on Form R405-2020
R405-2020 (Energy Calc) or R406-2020 (Energy Calc) or R406-2020
Default Leakage 0.08
Duct tightness shall be verified by testing in accordance with ANSI/RESNET/ICC380 by either
individuals as defined in Section 553.993(5) or (7), Florida Statutes, or individuals licensed as set
forth in Section 489.105(3)(f), (g) or (i), Florida Statues.
Testing Company
Company Name: Phone:
I hereby verify that the above duct leakage test results are in accordance with the 2020 7th Edition Florida Building Code
Energy Conservation requirements according to the compliance method selected above.
Signature of Tester: Date of Test:
Printed Name of Tester:
License/Certification #: Issuing Authority:
e 2022-Jan-06 16:03:40
-�i- wrii htsoft Right -Suite® Universal 2021 21.0.11 RSU27054 Right -Energy® Florida 2020 Section R405.4.1 Compliant Software page 15
9 �, , cuments\Wrightsoft HVAC%10930 Myrtlewood Ln.rup Calc = MJ8 Front Door faces: N
Reference Home Characteristics
Mark & Iris Reed
10930 Myrtlewood Ln
Port St Lucie, FL 34986
Above -grade Walls (Uo)
Above -grade Wall Solar Absorptance
Above -grade Wall Infared Emittance
Basement Walls (Uo)
Above -grade Floors (Uo)
Slab Insulation R-Value
Ceilings (Uo)
Roof Solar Absorptance
Roof Infared Emittance
Attic Vent Area (ft2)
Crawls pace Vent Area M
Exposed Mason ryFloor Area (fF)
Carpet & Pad R-Value
Door Area (n
Door U-Factor
North Window Area (fF)
South Window Area OF)
East WindowArea (M
West Window Area (ft )
Window U-Factor
Window SHGC (Heating)
Window SHGC (Cooling)
ACH50
Internal Gains ` (Btu/day)
Water heater gallons per day
Water Heater set point temperature
Water heater efficiency rating
Labeled Heating System Rating and Efficiency
Labeled Cooling System Rating and Efficiency
Air Distribution System Efficiency
Thermostat Type
Heating Thermostat Settings
Title: 10930 Myrtlewood Ln
FLBase202O
0.084
0.75
0.90
n/a
n/a
0.0
0.030
0.75
0.90
9.30
n/a
1100.10
2.0
40.00
0.400
104.67
138.51
138.51
138.51
0.400
0.2169
0.2169
7.00
142878
120.00
120.00
0.77
HSPF = 8.2
SEER = 14.0
0.88
Manual
72.0 (All hours)
TMY City: FL —Fort —Pierce