Loading...
HomeMy WebLinkAboutTRUSS PLACEMENT PLANALL BEARING POINTS THIS IS A PLACEMENT PLAN FOR ENGINEERED BRACING: SEE FINAL ENGNEERING SHEETS FOR THE BAaK CHARGES WILL NOT BE ACCEPTED UNLESS OUR DESIGN DEPARTMENT APPROVES THEM IN ADVANCE " , F H "` `" COMPONENTS AS DEFINED BY WTCA 1 - 1995. 1) FOR THE ERECTION BRACING FOLLOW STRUCTURAL DATA, NUMBER OF GIRDER AND TRUSS ALL HANGERS ARE SIMPSON STRONG -TIE OR USP UST BE INSTALLED PRIOR TO DIAPHRAMS HAVE NOT BEEN ANALYZED BY NSTRUCTIONS ON THE BCSI-Bi SUMMARY SHEETS PLIES AND THE CONNECTION INFORMATION. UNLESS OTHERWISE NOTED. INSTALL HANGERS INSTALLING ANY TRUSSES! FAILURE TO EAST COAST TRUSS. FOR ERECTION AND INSTALLATION OF TRUSSES 2) PERMANENT BRACING FOR THE STRUCTURE IS HE RESPONSIBILITY OF OTHERS. OUR DESIGN DEPARTMENT MUST APPROVE ALTERATIONS AND/OR REPAIRS TO TRUSSES IN ACCORDING TO THE CURRENT SIMPSON STRONG -TIE O SO MAY RESULT IN DAMAGED TRUSSES AND WILL FOLLOW INSTRUCTIONS ON THE BCSI-B1 SUMMARY 3) INSTALL WEB BRACING AS STATED ON SEALED ADVANCE. OR USP CATALOG VOID ALL WARRANTIES. L SHEETS AND SEALED ENGINEERED TRUSS DRAWINGS JENGINEERING TRUSS DRAWINGS. u ■ 10'-0" Top of Brg J 1 V-4" Top of Brg J, 134" Top of Brg 'i 2.5/12 Ceiling Pitch 11'4" Ceiling Height Hand Frame Down to 12'-0" by Others 13'-4" Ceiling Height 12" Coffer _ 1'-10-1 /2" N. 8" CM U C---= Wall Bott of Trs ' @ ) a-tt„ Typical End Detail Pop Out in Garage 1'-1-13/16" I Design to Resist Horizontal Forces Are the Responsibility of EOR. �,�" T Ti .�..' .,< �v JEERED TIMBER SYSTEMS - PRODUCTS t V �.4py 1 EAST COAST TRUSS 5285 -;T. LUCIF BLVT). FT, P]FRCE, FL 34946 OFFICE: (772) 466-2480 FAX: (772)466-5336 USTOMER:Telese Builders )B NAME: Reed Res DDRESS:Mrytle Wood ITY/COUNTY:PSL JOB # J43060 JOB # MODEL:Model SQ FT 9619 DATE 11/09/21 LATEST=/ % :15S-31.003 (3) (c), EAS]COAST TRUSS is the "True, Dealgn Engineer" Trusses are designed in accordance with the Florida Building Code NOTE: By approving this placement plan(s), signatured anywhere on this sheet, the customer or his representitive acknowledges that this placement plan complies with the structural intent of the project. The customer also acknowledges that this approval authorizes EAST COAST TRUSS to manufacture these trusses and deliver them to the project indicated on this drawing. , The customer also acknowledges that he/she accepts financial responsibility for any repair, engineering, and labor required due to errors other than those of EAST COAST TRUSS. Signed: CODE = FBC 2020/TP12014 ASCE 7-16 DESIGN CRITERIA =MWFRS OCCUPANCY CATEGORY= II EXPOSURE = B MWF SPEED =160 BUILDING TYPE =ENCLOSED MEAN HEIGHT: 15 FLOOR: DUR FACTOR= 1.0 PSF=TCLL-TCDL-BCLL-BCDL 40.0,10.0,0.075.0 ROOF: DUR FACTOR= 1.25 PSF=TCLL-TCDL-BCLL-BCDL 20.0,15.0,0.0,10.0 LOADS PER FBC & FR( *NON -CONCURRENT BC LL 10psf CONCURRENT BC STORAGE LL 20 psf MWF = MAIN WIND FORCE C&C = COMPONENTS AND CLADDING TOB = TOP OF BEARING TIC = TOP CHORD BC = BOTTOM CHORD LL = LIVE LOAD DL = DEAD LOAD psf = POUNDS PER SQUARE FOOT # =POUNDS UNLESS SHOWN ON ENGINEERED TRUSS DRAWING. ALL GIRDER/COLUMN LOADS MUST BY-PASS FLOOR TRUSS UNLESS SHOWN ON ENGINEERED TRUSS DRAWING. RECOMMENDED ON FLOOR TRUSSES SPANNING 20'-O" OR MORE SET WITH A SPREADER BAR. THE R BAR SHOULD BE AT LEAST 1/2 Ne IN LENGTH AS THE SPAN OF THE TRUSS NG SET. TO BCI-B1 FOR COMPLETE ON AND SAFETY PROCEDURES. ALL SUPPORT ANY PLANT SHELVES 1)2/16/21: Added LVL; A13-A16:3pt Brg Trs; Modified TRS over Lanai & Nook 2)4/7/21: Revised roof pitch to 5/12 4- 6- J Q Z 0 f U) U) W Z VJ Ideal U) U) li 1— LLI U) 0 IJJ C0 Z) TRi LACEMENPLAN 6" if plotted ,W