Loading...
HomeMy WebLinkAboutRequest for 30 - day pwoer temp2022-05-06 12:17 Wynne Building rp 7728787656 >> P 6/6 Planning I I Building & C 2300-Wegini Fort Pierce, ,vdoprnent Services de Regulation Divisimn Ave . 34992 . o Fax 772-462-6443 r �Ucie pounly P®rm�ntn6 Request for 30-Day Tei porary Power Release Date: \��r_ Pefnllt Number: Project Address: THE UNDERSIGNED HEREBY REQUEST RELEASE OF ELECTRICAL POWER TO THE ABOVE DESCRIBED PROPERTY, FOR A PERIOD NOT TO EXCEED THIRTY (k) DAYS, FOR THE PURPOSE OF TESTING SYSTEMS AND EQUIPMENT IN PREPARATION FOR A .FINAL INSPECTION. IN CONSIDERATION OF APPROVAL OF -w REQUEST WE HERE13Y ACKNOWLEDGE AND AGREE AS FOLLOWS 1. 71ils temporary Dower release is requested for the above stated purpose only, and there will be no occupancy of any type, other than thatpermittedlby construction during this time period. z. AS witness by our signatures, we herUjy agree Lo abide by all terms and conditions of this agreement, inducting Building Division Policy, which is incorporated herein, by reference. 3. All conditions and requiremen , listed in the attached documenC entmed "Requirements for 30 Day Power for Teslinl," have been fulfilled and 1-ho prpmlv:, Is ready for compliance inipactlori. 4. All requests for an e.XLension beyond 30 clays must, be made in writing Lo the Building nFFldal Staking the rea$on For the request. Powel- may tx: removk1 from the slte and/or a Stop Work Order issued if thp Fnal'Inspeddon has not been approved withtlnl 30 flays. A FPf•, of $100.00 will tic-, required to lift the Stop Work Order. WE _HEREBY REL EASE AND. AGREE T0._HOLD HARMLESS,1 ST. I_UCIE COUNTY, AND_THEIR EMPLOYEES_FROM�' = z° --, •s ALL I.if1131t11"!ESAND .CLAIMS `OF ANY TYPE OF NATURES WHICH MAY ARISE NOW OR IN ifiE FUTURE OUT OF THIS TRANSACTION, INCLUDING ANY DAMAGE WHICH MAY BE INCURRED DUE TO THE - DISCONNECnON OF ELECTRICAL POWER IN THE EVEN" OF VIOLATION OF THIS AGREEMENT. OWNER SIGNATURE DATE_ GENER . CONTRACTORS TVA R7= DATE ELECTRICAL CONTRACTOR SIGNATURE f DATE