Loading...
HomeMy WebLinkAboutrequest for 30-day power temp2022-05-06 12:16 Wynne Building Corp 7728787656 >> P 4/6 Date. ds\ Project Address: Planning Building 4L I 2300: �r jin Port Pierce, Request for 30-Day T QC\, Mftpment Services de Regulation Division Ave . 34g82 FaX 772-462-6443 - Power :Release RECEIVED MAY 012022 lit, Luca County, Permitting Number• THE UNDERSIGNED HEREBY REQUEST RELEASE OF ELECTRICAL POWER TO THE ABOVE DESCRIBED PROPERTY, FOR A PERIOD NOT TO EXCEED THIRTY (30) -DAYS, FOR THE PURPOSE OF TESTING SYSTEMS AND EQUIPMENT IN PREPARATION FOR A.FINALINSPECTLON. IN CONSIDERATION OF APPROVAL OF THE REQuEsT Wemmwy A0 N01i1'ILEDGE AND AGREE AS FOLLOWS: 1. This temporary power release Is Mquesma for the above stated purpose only, and there will be no occupancy of any type, other than that peftitted'by construcdon during this time period. 2. As witness by our signatures, we hereby agree to! abide by all terms and condltlons of this agreement including Building Division Policy, which is Incorporated herein by reference. 3. All conditions and requirements listed in the attached document entiided -Requirements for 30 Day Power for Testing" have been fulfilled and the premise is ready for compliance inspection. 4. All requests for an extension beyond 30 days must be. made in writing to the Building Official stating the reason for the request. Power may be removed'from the site and/or a Stop Work Order issued If the Fnarinspection has not been approved within 30 days. A fee of $100.00 will be required to lift the ftp-Work Order. WE HEREBY._RELEASE AND,AGREE TO H®LD.-HARMLESS;. $T. LUCIE COUNTY;: AND THEIR EMPI OYES=FROM - °T ALL LIABILITIES AND CLAIMS OF ANY TYPE OF NATURE WHICH MAY ARISE. NOW OR IN THE FUTURE OUT OF THIS TRANSACTION, INCLUDING ANY DAMAGE W.HICH"MAY BE INCURRED DUE TO THE DISCONNECTION 'OF ELECTRICAL POWER I•N.THE EVENT OF VIOLATION OF THIS AGREEMENT. OWNER SIGNA DATE GEN CONTRACTOR' RE DATE. CONTRACTOR SIGNATURE