Loading...
HomeMy WebLinkAboutTruss Placement Planx to tf IN POINTS ALL BEARING I A P LAN B E FINAL .K CHARGES WILL NOT BE ACCEPTED UNLESS OUR .. _. COMPONENTS A5 DEFINED BY WTCA 1 - 1 CO 995. 1 FOR THE ERECTION BRACING FOLLOW STRUCTURAL DATA NUMBER OF GIRDER AND TRUSS DE5 IGN DEPARTMENT APPROVES THEM IN ADVANCE UST BE INSTALLED PRIOR TO DIAPHRAMS HAVE NOT BEEN ANALYZED BY NSTRUCTIONS ON THE BCSI-B1 SUMMARY SHEETS PLIES AND THE CONNECTION INFORMATION. ALL HANGERS ARE SIMPSON STRONG -TIE OR USP INSTALLING ANY TRUSSES! FAILURE To EAST COAST TRUSS. 2) PERMANENT BRACING FOR THE STRUCTURE IS HE OUR DESIGN DEPARTMENT MUST APPROVE NI FSS OTHERWISE NOTED. INSTALL HANGERS FOR ERECTION AND INSTALLATION OF TRUSSES RESPONSIBILITY OF OTHERS. ALTERATIONS AND/OR REPAIRS TO TRUSSES IN ACCORDING TO THE CURRENT SIMPSON STRONG -TIE O SO MAY RESULT IN DAMAGED TRUSSES AND WILL FOLLOW INSTRUCTIONS ON THE BCSI-B1 SUMMARY 3) INSTALL WEB BRACING AS STATED ON SEALED ADVANCE. DR USP CATALOG VOID ALL WARRANTIES. SHEETS AND SEALED ENGINEERED TRUSS DRAWINGS NGINEERING TRUSS DRAWINGS. ou u l ti N N M u� r rn rn m rn m rn m m m � rn � a LU W W W W > W W 0 0 U U N w W w w w w w w w U U U N N N N N N N N N i N 0 U ZCJ1 1 1211 ZCJ3 ZCJ510'-0' qn� Ceil ZCJ7 A08G 0 A07 A06 o 2 13 9 0 10'-0" Ceiling A05 N., I A05 p o 0 A04 of A03 -- A02 A01 r r ZCJ7 ZCJ5 D 10'-0" Ceilin - ZCJ3 ZCJtTzr I 0 ti N N N rn N N i N m m mw N N NN m rn rn rn -ri N N N N N N N N 10'�-0"Top of Br :CJ1 12" Coffer :CJ3 r - _. _- :CJ5 'CJ7 :CJ7 :CJ5 :CJ3 CJ1 9 ME CMU Wall Typical End Detail Design to Resist Horizontal Forces Are the Responsibility of EOR. V-1-13/16" l£MS sF 3ls a. E/. I CO AST TRUSS 52&5 Y7. LUCU BLVA j 1. WL'RCB. 11 31916 01110v(119)466 `1W) FNY-M114hf-N416 TOMER:Telese Builders NAME: Reed Guest House RESS:Mrvtle Lane JOB # J43061 JOB # MODEL:Model SQ FT 890 DATE 11/09/21 NOTE: By approving this placement plan(s), signatured anywhere on this sheet, tile customer or his representitive acknowledges that this placement plan complies with the stmctu(yl intent of the project. The customer also acknowledges that this approval authorizes EAST COAST TRUSS to manufacture these trusses and deliver them to the project indicated on this drawing. The customer also acknowledges that helshe accepts financial responsibility for any repair, engineering, and labor required due to errors other than those of EAST COAST TRUSS. Signed: __. Dale: CODE =FBC 2020/TP12014 ASCE 7-16 DESIGN CRITERIA=rv1WFRS OCCUPANCY CATEGORY= II EXPOSURE = B MWF SPEED =160 BUILDING TYPE =ENCLOSED MEAN HEIGHT: 15 FLOOR: DUR FACTOR- 1.0 PSF=TCLL-TCDL-BCLL-BCDL 40:0,1fl-0,0.0,5.0 ROOF: OUR FACTOR= 1 .25 PSF=TCLL-TCDL-BC L.L-BCDL 20.0,15,0,0.0,10.0 *NON -CONCURRENT BC LL 10psf CONCURRENT BC STORAGE LL 20 psf MWF = MAIN WIND IORCE C&C = COMPONENTS AND CLADDING TOB = TOP OF BEARING TC = TOP CHORD BC = BOTTOM CHORD LL = LIVE LOAD DL = DEAD LOAD psf = POUNDS PER SQUARE FOOT # = POUNDS UNLESS SHOWN ON ENGINEERED TRUSS DRAWING. ALL GIRDER/COLUMN LOADS MUST BY-PASS FLOOR TRUSS UNLESS SHOWN ON ENGINEERED TRUSS DRAWING. RECOMMENDED ON FLOOR TRU; SPANNING 20'-0" OR MORE BE SET WITH A SPREADER BAR. THE 1DER BAR SHOULD BE AT LEAST 1/2 IN LENGTH AS THE SPAN OF THE TRUSS NG SET. TO BCI-B1 FOR COMPLETE ON AND SAFETY PROCEDURES. SUPPORT ANY PLANT SHELVES 1) 417/21: Revised r0r)f pitch to 5/12 2- 3- 4- 5- 6- A t i t 1 r r i r r I J Q Z LL- IL We G Q U) W J W X W 0 W Z) I- 0 Z O 0 •t 4 MIA,