Loading...
HomeMy WebLinkAboutFPUA Feesi • Ing, epartment Fort Pierce, FL 34947 St. Lucie County Phone (772)466-1600 Fax (772)468-2414 Job Location: 7369 Commercial Circle Invoice Number: 562 Account Name: New Warehouse - Contact Name: John Peluso Billing Address: 7369 Commercial Circle b3S Fort Pierce Utilities authority "Committed To Quality" RECEIVED WaterlWastewater Engineering P.O. Box 3191 (34948-3191) U�r 20�8 1701 S. 37th Street Permitt' D Please. remit payment to: Fort Pierce Utilities Authority Attention: Key Accounts Department P.O. Box 3191 Fort Pierce, FL 34948-3191 PCN:133580200470005 FEI# FL Phone: (561)202-7617 Pax:( ) - Cell: Location Id: Fort Pierce ;Accourtiing Cods' # ..size ` ; Des�ripion tees 06-3-060-43701-0000 2 518" Water Meter and/or Seivice Installation p General $4,390.00 06-2-000-23500-0000 Water Security Deposit ❑ Inside Ci Limits $120,00 06-3-060-48800-0000 Water New Account Setup Charge $60,00 06-3-060-43702-0000 . Water Capital Improvement Charge W ERC's 1.00 $920.50 08-2-000-23500-0000 Wastewater Security Deposit $180.00 08-3-080-48800-6000 Wastewater New Account Setup Charge $40.00 08-3-080-43702-0000 Wastewater Capital Improvement Charge WW ERC's 1.25 $3,518.75 Ac�ouniirtg, EFades ` : Constrluclblt�n Cost`Fstirr�a�e . �18tT- Description for service order: Total Paid: Invoice Total: 9 229.25 FPUA to install (1)-2" double water service with (2)-5/8"x314" meters with sewer. Total of 1 water & 1.25 sewer ERCs assessed. Date Paid: Check Number: Z_3 7-3 Customers will be assessed wastewater charges the day they connect to the wastewater system or within 365 days from date wastewater Connection Charge is paid - whichever is first. The cost of the service line from the point of delivery at the property line to the house/building is the responsibility of the customer and is not included in this invoice. State laws require that a permit from the Health Department must be obtained prior to initiating a septic tank abandonment. Contact the Health Department at (772)8734931. Construction cost estimates are based on current labor, equipment and material prices, Actual costs of construction will be determined at the completion of the project. Should unforeseen circumstances be encountered during construction, including but not limited to adverse weather conditions and construction conflicts, the customer will be responsible for increased costs, Additional costs incurred by the customer shall not exceed fifteen (15) percent of the total estimated construction costs shown above. Estimated costs paid by the customer that exceed the actual cost of construction will be refunded by Fort Pierce Utilities Authority. s Reviewed By: John.13inas, Environmental Engineer ( Date: 2018-09-20 Customer's Signature: Date: Printed Name: