HomeMy WebLinkAboutField Density Test 7-2-15t� -3t+4 1 Jul 2�� Phone 954-784-2941 Le era . 800-848-1919 Public Fax 954-784-7875 & TESTING INC. St. Lucie Cc.) —'w www.fed-eng.com 250 SW 13th Ave Pompano Beach, FL 33069 Field Density Tests of Compacted Soils Method D-6938 Client: Mel-Ry Construction Date: July 1, 2015 Address: 10967 S. Ocean Drive, Jensen Beach, FL 34957 Order #: 15-1238 Project: Proposed Single Family Home Permit #: Address: 10725 S. Ocean Drive, Lot 327, Jensen Beach, FL 34957 Tech: KP Area Tested: Building Pad Compaction Req.: 95% Material Type: Pale Brown Sand with Shell & Rock Proctor Method: ASTM D-1557 Test # TEST LOCATION Probe Depth Elev. Moist % Dry Density PCF Proctor Value PCF Optimum Moisture % Compaction Pass 1 At NE Area of Lot 12" FG 7.5 106.4 111.4 10.9 95.5% Yes 2 At Center of Lot 12" FG 6.2 105.9 111.4 10.9 95.1 % Yes 3 At SW Area of Lot 12" FG 6.5 107.4 111.4 10.9 96.4% Yes 4 5 6 7 8 9 10 11 12 13 14 Remarks: See Reverse Side (Page 2 of 2) for Disclaimer This is a Compaction Test o Legend for Elevation: PR = Proofroll 1,2,3 = 1st, 2nd, 3rd Lift SL = Springline FL = Final Lift a .' if ci tion of Soil'Bearing Capacity. itFrLei3laric, P.E. ,/y/fir SG = Subgrade BG = Below Grade Federal Engineering &"Testing, Inc. BC = Basecourse BOF = Bottom of Footing r Florida Reg. No. 5939.4 TOP = Top of Pipe FG = Finished Grade J' Certificate of Authorization #5471 As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential propeity`of clients, and authorization for publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval..A density test deter,i s,thq,degree of compaction of the tested layer of material only. A density does not replace a soil bearing capacity determination. After laying dormant for a period of 90 days of after heavy iain/storms, retesting must be performed on this work. on the top 12" of the pad and is not a Submitted; by: PAGE 1 of 2 Compacted Soils Method D-6938 Disclaimer Pursuant to your request, Federal Engineering & Testing, Inc. (FET) has performed a compaction test at the referenced project on the reverse side. The purpose of our test was to determine the degree of compaction of the tested layer of material only. In no way shall a compaction test replace a soil bearing capacity determination. A soil boring test must be performed by the client prior to construction to verify subsoil conditions. Our scope of services only included testing the top 12" of added fill material. FET was not contracted to perform supervision of the building pad preparation. This testing of the added fill material does not include an analysis of the underlying soil materials to determine if they are capable of supporting the proposed structure without settlement. This density compaction test does not warranty any underlying soil materials or conditions below the tested top 12 inches of material. If no soil borings have been performed in the location of the proposed structure, we recommend performing soil borings below ail foundation areas of the proposed structure to verify the underlying soil conditions. Environmental analysis of the soil materials is not part of the scope of services. If environmental analysis of the soils is required, -we can provide a proposal for performing an. environmental analysis of the soil materials. The scope of services -is for determination of the degree of compaction of the tested layer of material only. No other analysis is implied or warranted. Job project specifications were not available at the time the work was performed. Determination of the pass/fail compaction results are based on current common industry requirements of. 95% of the ASTM D-1557 standard for building foundations and 98% of the AASHTO T-180 standard for paved areas such as roadways and parking lots. If different specifications are required, Federal Engineering & Testing, Inc. shall be notified. Our findings are relative to the date and areas of our site work and should not be relied upon to represent conditions on other areas or dates. Any subsequent site disturbances due to water erosion, rain waters, construction activities, utility or footing excavations, overgrown vegetation, traffic and other disturbances will void this test and the site must be re -compacted and re- tested prior to construction. As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of our client and authorization for use, publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval. It has been a pleasure working with you and we look forward to doing so in the near future. Page 2 of 2