Loading...
HomeMy WebLinkAbout30 Day Request Temporary Power RelaseRequest Date: 1 /12/16 Project Address: Planning & Development Services uilding & Code Regulation Division 300 Virginia Ave Drt Pierce, FL 34982 RECEI►,":D FEB 161016 72-462-216S Fax 772-462-6443 30-Day Temporary Power Release Permit Number. 515Nettles Blvd, Jensen Beach, FL, 34957 THE UNDERSIGNED HEREBY REQUE PROPERTY, FOR A PERIOD NOT TO AND EQUIPMENT IN PREPARATION REQUEST WE HEREBY ACKNOWLEE 1. This temporary power releas occupancy of any type, other 2. As witness by our'signatures including Building Division Pc 3. All conditions and requireme Power for Testing" have bee 4. All requests for an extension the reason for the request. the Final Inspection has not the Stop Work Order. RELEASE OF ELECTRICAL POWER TO THE ABOVE DESCRIBED -EED THIRTY (30) DAYS, FOR THE PURPOSE OF TESTING SYSTEMS R A FINAL INSPECTION. IN CONSIDERATION OF APPROVAL OF THE AND AGREE AS FOLLOWS: is requested for the above stated purpose only, and there will be no than that permitted by construction during this time period. we hereby agree to abide by all terms and conditions of this agreement, icy, which is incorporated herein by reference. is listed in the attached document entitled "Requirements for 30 Day fulfilled and the premise is ready for compliance inspection. )eyond 30 days must be made in writing to the Building Official stating ower may be removed from the site and/or a Stop Work Order. issued if een approved within 30 days. A fee of $100.00 will be required to lift WE HEREBY RELEASE AND AGREE To HOLD HARMLESS, ST. LUCIE COUNTY, AND THEIR EMPLOYEES FROM ALL LIABILITIES AND CLAIMS OF ANY TYPE OF NATURE WHICH MAY ARISE NOW OR IN THE FUTURE OUT OF THIS TRANSACTION, INCLUDING ANY DAMAGE WHICH MAY BE INCURRED DUE TO THE DISCONNECTION OF ELECTRICAL P WER IN THE EVENT OF VIOLATION OF THIS AGREEMENT. OWNER SIGNATURE ' DATE _ >1 (� � GENERAL CONTRACTOR SIGNA DATE ELECTRICAV CONTRACTOR SIGNATURE DATE �'Ylk4k r,Ile- ` -, u 6` w