HomeMy WebLinkAboutInterior & Exterior Ralling Fabrication RequirementNorth End of Porch & Loft Finished Outside Comer
(3) Required
'r- 0-11
Top Rail
Width of Spindle 3'-6" —'
4'-4" Width ofSpindle
3'-'-4"
Pair
7. 6°
East Side of Porch & Loft
(3) Required
N
l �2'-8"
Entry Landing
(2) Required
-71 2x2 TS - 11 Ga.
0
Entry Stair Stair Layout
(1)Required 6-5116"Rise
10" Run
End to
remain open
(TYP)
Notes:
1] - Rails & Spindles are 1x1 TS -16 Ga. or as noted
2] - All top rail drilled 1/4" diameter holes 8" OC (for wood top rail)
3] - All components 304 Stainless Steel with powder coat (WHITE)
4] - TS to remain open at rail base and ends of top rail.
5] - Attach using 114" x 2" stainless or ceramic coated lag screws (min.)
6] - Minimum 250 lb. lateral force required for all parts of this assembly
0
114" Dla N
Side View 12 (3" Plate
Too View
Rail Base Clio/Sleeve
(27) Reouired
- II-----------------------------------------------------1,V ---
Side View
Too View Side View
Too Rail Clio/Sleeve
(20) Required
----- - - ---- (j------------------
- ------------- ;------------Q-------
k----2 1/2"----�'
1/a" Diem
Too View
Stair Rail Base Clio/Sleeve
(4) Required
Count:
Stair Rail Base - 4 each
Rail Base - 27 Each
Top Rail - 20 Each
Note:
1] - 7/8" TS to be a sleeved base for 1" x 1" TS 18
Ga. railing. Verify fit
21 - 1-3/4" TS to be a sleeved base for 2" x 2" TS
11 Ga. stair rail. Verify fit.
3] - Clip/Sleeve fittings to be field drilling &
attachment to railing
4] - All components 304 stainless with powdercoat
Snyder Residence
515 Nettle Blvd - Jensen Beach FL, 34957
Interior & Exterior Railing Clips