Loading...
HomeMy WebLinkAboutKSM Pile Installation Inspection 11-12-150001 TAP C 1 Ar A%LJjYi KELLER, SCHLEICHER & MacWILLIAM ENGINEERING AND TESTING, INC. MARTIN (772) 337-7755 P.O. BOX 78-1377, SEBASTIAN, FL 32978-1377 SEBASTIAN (772) 589-0712 PALM BEACH (561) 845-7445 L www.ksmengineering.net MELBOURNE (321) 768-8488 FAX (561) 845-8876 E-Mail: KSM@KSMENGINEERING.NET ST. LUCIE (772) 229-9093 C.A.: 5693 FAX (772) 589-6469 Revised: November 16, 2015 November 12, 2015 Dan Snyder 8847 Haven Circle Brewerton, NY 13029 Re: Pile Installation Inspection Snyder Residence 515 Nettles Boulevard Jensen Beach, Florida KSM Project #: 161203-pile Dear Mr. Snyder: As requested, we were present during the installation. of Ahe.el.even .(1.1) auger - cast -piles for the proposed structure at the referenced site. Pile layout by others. The pile installation inspection was generally performed in accordance to the "Inspector Guide to the Auger Cast -In -Place Piles", published by the Auger Cast - In -Place Pile Committee of The Deep Foundation Institute. Based on this inspection, it is our professional opinion, that the piles constructed for the referenced project were installed as specified .on the construction drawings. The pile documentation and Location Plan are attached. Please note that pile 3 and 4 were relocated due to sewer main. The new locations of these piles are reflected on the location plan. We are pleased to be of assistance to you on this phase of your project. have any questions, please feel free to contact the office. ..11111111N.- If you NOVEOCO'EIVIE 16 eon BY: Ronald G. Keller, P.E.: 37293 / SI Lic. No.: 860 / Julie E. Keller, P.E.: 68366 KELLER, SCHLEICHER & MacWILLIAM ENGINEERING AND TESTING, INC. MARTIN (772) 337-7755 PO, BOX 78-1377 SEBASTIAN FL 32978-1377 SEBASTIAN (772) 589-0712 PALM BEACH (561) 845-7445 www.ksmengineering.net MELBOURNE (321) 768-8488 FAX (561) 845-8876 E-Mail: KSM@KSMENGINEERING.NET ST. LUCIE (772) 229-9093 C.A.: 5693 FAX (772) 589-6469 Pile Installation Inspection Snyder Residence 616 Nettles Boulevard Jensen Beach, Florida KSM Project #: 151203pile Date Installed: 11/09/2015 Pile Location (See Location Plan) Pile Diameter Pile Length Pile Reinforcement Pump Strokes Truck No. Time Installed Monday, November 9, 2015 1 14" 20' See Note 3 27 173 9:38 2 99 Is 1926 173 9:47 3 99 9925 173 9:58 4 It Is24 173 10:06 5 it it24 173 10:15 6 9923 173 10:23 7 1924 173 10:35 8 it At24 210 10:45 9 99 &124 210 10:55 10 it25 210 11:05 11 At27 210 11:15 Notes: 1. Pile Reinforcing: 6- #6 Vertical Bars Cont. with #3 Ties at 24" O.C. 2. Grout 28 Days Compression Strength = 5,000 PSI. 3. 1 Pump Stroke = 1.07 cu.ft. of Grout. Ronald G. Keller, P.E.: 37293 / SI Lic. No.: 860 / Julie E. Keller, P.E.: 68366 I � 7 CMU STEM WALL (SEE SECTION 1'A5) AUGER CAST CONCRETE PILING P1 +:->s (SEE PILING NOTES SHEET Al >------------------ 8 DETAIL 4-A6)1',, II II1`1 II Iiil K I O 18' DIAMETER X 24' DEEP -- — —— �— . — . — . — . — FOOTING W/ 4 #5 BARS r-- •-- • — � I (SEE SECTION 1-A5) 6'x16' FEMA APPROVED FLOOD 3 12' DEEP x 24' WIDE 4 VENT (12' MAX. ABOVE GRADE) CONC. ® SPREAD 'I FTG/GRADE BM W/ 4 FLOOD VENT CALCULATIONS 875 Sp/FT(ENCLOSED) x 1 #5 REBAR CONT. SQ/IN = 875 SQ/IN, REQUIRED.-13 B'x16'(1664 SQ/IN) I I VENTS PROVIDED (OWNER/CONTRACTOR TO VERIFY CLEAR OPENING OF SELECTED FLOOD VENTS MEETS THE I I I MINIMUM REQUIREMENT) 8' CMU W/ 1 #5 VERT. N I I REBAR @ 4'0' O.C. 8 1 #5 BAR CONT. IN TOP i _ I COARSE. —FILL ALL 4,_0, I P—O CELLS SOLID AG I I I I X \ \\ // /. / 10 2 ` / 8' CMU W/ 1 #5 VERT. \'\ 8 / o < REBAR @ 4'0' O.C. 8 1 / #5 BAR CONT. IN TOP \ COARSE. —FILL ALL / \ Y \ CELLS SOLID \ .\ \ '\ 12' DEEP x 24' WIDE \ '\ �CONC, SPREAD / \ FTG/GRADE BM W/ 4 / �! #5 REBAR CONT. ti / O ,OT n2O /1 LOCATION OF PILES PROJECT: Sn der Residence, 515 Nettles Boulevard, Jensen Beach, Florida SHEET 1 OF 1IW V lk AN E N ENGIN ERI 0 DRAWN BY: J.L. PERMIT #+ ­J AVL AND TESTINGDESIGNED BY+J,K,PR❑JECT #+ 152203- DATE, 20151112 1 " Lq SCALE: NONE