Loading...
HomeMy WebLinkAboutCertificate Of Termite Treatment 12-15-17Planning & Development Services Building & Code Regulation Division 2300 Virginia Ave • I D A Fort Pierce, FL 34982 772-462-2172 Fax 772-462-6443 CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT JOB ADDRESS: )ER/CONTRACTOR: CONTROL CONTRACTOR: PEST CONTROL LICENSE #: JB175775 We, the undersigned, hereby certify that we have pretreated the above described construction for; subterranean termites in accordance with the standards of the National Pest Control Association. S feet if area treated, J INION 2L Percentage of solution:.05% 2,/Date of Treatment: I )IT 17 1st Treatment Re -Treat 1st Treatment Re -Treat 1st Treatment Re -Treat INO &I Chemicals used: DOM i Total gallons used: 6;tq I Time of Treatment: ntlst Treatment Re -Treat Pools 1st Treatment Re -Treat ,Perimeter for Final Insp on 1,17 nature of Exterminator ate Note.! There must be a completed form for each required treatment or re -treatment and this form must be, on the job site to be picked up by the Inspector at time of each Inspection or the scheduled inspection will fail and a re -Inspection fee charged. FBC�04.2.6 Certificate of Protective Treatment for preventlon of termites A weather resistant jobslte posting board shall be provided to receive duplicate Treatment Certificates as each required protective treatment is comp/eted, providing a copy for the person the permit is issued to and another copy for the building permit files The Treatment Certificate shall provide the product used, Ident/ty of the applicator, time and date of the treatment, site location, area treat`'ed, chemical used, percent concentration and number of gallons used, to establish a verifiable record of protective treatment. If the soil chemical barrier method for termite preventlon is used, final exterior treatment shall be comp/eted prior to final building approval, St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications. 7/24/2014