Loading...
HomeMy WebLinkAboutENERGY EFFICIENCY CODE1 iWORM R405-2020 r ,LORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION Florida Department of Business and Professional Regulation - Residential Performance Method Project Name: 154A RH - FP020029 Builder Name: FOCUS HOMES Street: 7905 Sebastian Rd. Permit Office: City, State, Zip: Fort Pierce , FL, 34951 Permit Number: Owner: FOCUS HOMES Jurisdiction: Design Location: FL, ST_LUCIE_CO_INTL County: St. Lucie (Florida Climate Zone 2 ) 1. New construction or existing New (From Plans) 10. Wall Type41482.0 sqft.) Insulation. Area 2_ Single family or multiple family Detached a. Concrete Block - Int Insul, Exterior R=4.1 1308.70 ft2 b, Frame - Wood, Adjacent R=1.3.0 173.33 ft2 3. Number of units, if multiple family 1 c. N/A R= ft2 4. Number of Bedrooms 3 d. N/A R= ft2 11. Ceiling Types (1546.0 sqft.) Insulation Area 5. Is this a worst case? Yes a. Under Attic (Vented) R=30.0 1546.00 ft2 6. Conditioned floor area above grade (ft2) 1546 b. N/A R= ft2 Conditioned floor area below grade (ft2) 0 c. N/A R= ft2 7. Windows(169.0 sqft.) Description Area 12. Ducts a. sup: Attic, Ret: Main, AH: Main R ft2 6 320 a. U-Factor. Dbl, U=0.34 121.00 ft2 SHGC: SHGC=0.23 b. U-Factor: Dbl, U=0.55 48.00 ft2 13. Cooling systems kBtulhr Efficiency SHGC: SHGC=0.25 a. Central Unit 29.2 SEER:16.00 c. U-Factor. N/A ft2 SHGC: ft Area Weighted Average Overhang Depth: 1.000 . 14. Heating systems kBtu/hr Efficiency Area Weighted Average SHGC: 0.236 a. Electric Heat Pump 29.2 HSPF:9.00 8. Skylights Area c. U-Factor.(AVG) N/A ft2 15. Hot water systems SHGC(AVG): N/A a. Electric Cap: 50 gallons 9. Floor Types (1546.0 sqft.) Insulation Area EF:0.950 a. Slab -On -Grade Edge Insulation R=0.0 1546.00 ft2 b. Conservation features b. N/A R= ft2 None c. N/A R= ft2 16. Credits Pstat Glass/Floor Area: 0.109 Total Proposed Modified Loads: 46.40 PASS Total Baseline Loads: 49.91 1 hereby certify that the plans and specifications covered by Review of the plans and -HE S7Ar this calculation are in compliance with the Florida Energy specifications covered by this Code. calculation indicates compliance with the Florida Energy Code. ' • ���� PREPAFjE� Before construction is completed DATE: �P2 this building will be inspected for compliance with Section 553.908 * • 0_ I hereby certify that this building, as designed, is in compliance Florida Statutes. CUD with the Florida Energy Code. WE'T¢_ OWNER/AGENT: J" BUILDING OFFICIAL: DATE: L DATE: - Compliance requires certification by the air handler unit manufacturer that the air handler enclosure qualifies as certified factory -sealed in accordance with R403.3.2.1. - Compliance requires an Air Barrier and Insulation Inspection Checklist in accordance with R402.4.1.1 and this project requires an envelope leakage test report with envelope leakage no greater than 7.00 ACH50 (R402.4.1.2). 6/11/2021 3:18 PM EnergyGauge® USA 7.0.00 - FlaRes2020 FBC 7th Edition (2020) Compliant Software Page 1 of 4 FORM A405-2020 INPHT SIIMMARV (_141:r111. IST RI`0r11?T PROJECT ,,,Title: JBuilding Type: Owner Name: # of Units: Builder Name: Permit Office: Jurisdiction: Family Type: New/Existing: Comment: 154A RH - FP020029 User FOCUS HOMES 1 FOCUS HOMES Detached New (From Plans) Bedrooms:, 3 Conditioned Area: 1546 Total Stories: 1 Worst Case: Yes Rotate Angle: 0 Cross Ventilation: No Whole House Fan: No Address Type: Lot # Block/Subdivision: PlatBook: Street: County: City, State, Zip: Street Address 7905 Sebastian Rd. St. Lucie Fort Pierce , FL , 34951 CLIMATE / V Design Location Design Temp TMY Site 97.5 % 2.5 % Int Design Temp Heating, Design Daily Temp Winter Summer Degree Days Moisture Range FL, ST LUCIE CO_INTL FL_VERO_BEACH_MUNI 39 90 70 75 299 58 Medium BLOCKS Number Name Area Volume 1 Blocki 1546 13914 SPACES Number Name Area Volume Kitchen Occupants Bedrooms InfilID Finished Cooled Heated 1 Main 1546 13914 Yes 4 3 1 Yes Yes Yes FLOORS # Floor Type Space Perimeter R-Value Area Tile Wood Carpet 1 Slab -On -Grade Edge Insulatio Main 164 ft 0 1546 ft' ---- 0 0.3 0.7 ROOF / V # Roof Gable Roof Type Materials Area Area Color Rad Solar SA Emitt Barr Absor. Tested Emitt Deck Pitch Tested Insul. (deg) 1 Hip Composition shingles 1729 ft' 0 ft' Medium N 0.85 No 0.9 No 0 26.6 ATTIC / V # Type Ventilation Vent Ratio (1 in) Area. RBS ACC 1 Full attic Vented 150 1546 ft' N N CEILING # Ceiling Type Space R-Value Ins Type Area Framing Frac Truss Type- 1 Under Attic (Vented) Main 30 Blown 1546 ftz 0.07 Wood 6/11/2021 3:18 PM EnergyGaugeO USA 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 2 of 4 FORM f4405`2020 INPUT SUMMARY CHECKLIST REPORT WALLS. "'; . Adjacent '10 Space Cavity Width Height Sheathing, Framing. Solar Below 2 Ornt ANalt=ypg R_ lal,le. Et!n Ft- In Area wv-lue Emnfio , AhSOr (rad• o 1 N Exterior Concrete. Block - Int Insul Main. 4.1 20 0 8 8 1.73.3 ft? 0 0.6 0 _2 E Exterior Concrete, Block - Int lnsul .Main 4.1 46 0' 8 8 398:7 ft2 0 0.6 0. _3 S Exterior 'Concrete Block - lntlnsul Main 4.1 39 ' 8 8 338.0ft2 0 0.6 0 4 W Exterior Concrete Block - Int Insul Main 4.1 46 8 13 398.7 ft' 0 0.6 0 5 N Garage Frame -,Wood Main 13 20 8 8, 173 3 ft' 0.19 0,01 0 DOORS; # Ornt Door Type Space Storms U-Value Width Height Area Ft In Ft In 1 N Insulated Main None .16 3 8 24. ftz• . 2 N Insulated Main None .16 2 6 6 8 16.7 W WINDOWS Orientation shown- is the entered orientation (=>) changed to -Worst Case. Wall Overhang V # Ornt ID Frame Panes NFRC U-Factor SHGC Imp Area Depth Separation Int Shade Screening 1 N 1 Vinyl Low-E Double Yes 0:34 0.23 N 15.0 ft? 1 ft 0 in 1 ft 6 in- Drapes/blinds None 2 E 2 Vinyl Low-E Double Yes 0:34 0.23 N 30.0 ft' 1 ft 0 in 1 ft 0 in Drapes/blinds None 3 E 2 Vinyl Low-E Double Yes 0.34 0.23 N 6.0 ft2 1 ft0 in 2 ft 0 in Drapes/blinds None 4 S 3 , Metal Low-E Double Yes 0.55 0.25. N 48.0 ft' 1 ft 0 in 1 ft 0 in Drapes/blinds None 6 S 3 Vinyl Low-E Double Yes 0.34 0.23 N 40.0 ft' 1 ft 0 in 2 ft 0 in Drapes/blinds None 6 W 4 Vinyl Low-E Double Yes 0.34 0.23 N 30.0 ft' 1 ft 0 in 2 ft 0 in Drapes/blinds None GARAGE # Floor Area Ceiling Area Exposed Wall Perimeter Avg. Wall Height Exposed Wall Insulation 1 408 ft' 408 ft? 45 ft ,9 ft 1 INFILTRATION # Scope Method SLA CFM 50 ELA EgLA ACH ACH 50 1 Wholehouse Proposed ACH(50) .0004 1623.3 •89.06 167.2 :1324 7 HEATING SYSTEM # System Type Subtype Speed Efficiency Capacity Block Ducts 1 Electric Heat Pump/ None Singl HSPF:9 29.2 kBtu/hr. 1 sys#1 COOLING SYSTEM # System Type Subtype Subtype Efficiency Capacity Air Flow SHR Block Ducts. 1 Central Unit/ None Singl SEER: 16 29.2 kBtu/hr 87.6 cfm 0.73 1 sys#1 6/11/2021 3:18 PM EnergyGaugeQ USA 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant.Software Page 3 of 4 FORM K405-2020 INPUT SUMMARY CHECKLIST REPORT HOT WATER SYSTEM # System Type SubType Location EF Cap Use SetPnt Conservation 1 Electric None Garage 0.96 50 gal 47 gal 120 deg None SOLAR HOT WATER SYSTEM FSEC Collector Storage Cert # Company Name System Model.# Collector Model # Area Volume FEF None None ft2 DUCTS — Supply — -- Return --- Air CFM 25 CFM25 HVAC # V # Location R-Value Area Location Area LeakaggType Handler TOT OUT QN RLF Heat Cool 1 Attic 6 320 ft� Main 20 ft2 Default Leakage Main (Default) (Default) 1 1 TEMPERATURES Programable Thermostat: Y Ceiling Fans: Cooling[[X]] Jan Feb Mar A r X Ma ]Jun Jul X Au X Se f X Oct X Nov f f X Dec XFeb Xj Mar Heatin[X] Jan �Xj XApr May �X] Jun r �Jul �Xj f X� Aug Xj Sep X�Oct Xj Nov XDec Venting [X Jan X Feb [X Mar X Apr X May [X Jun Jul lX� X Aug X Sep X Oct X Nov X Dec Thermostat Schedule: HERS 2006 Reference Hours Schedule Type 1 2 3 4 5 6 7 8 9 10 11 12 Cooling (WD) AM 78 78 78 78 78 78 78 78 80 80 80 80 PM 80 80 78 78 78 78 78 78 78 78 78 78 Cooling (WEH) AM 78 78 78 78 78 78 78 78 78 78 78 78 PM 78 78 78 78 78 78 78 78 78 78 78 78 Heating (WD) AM 66 66 66 66 66 68 68 68 68 68 68 68 PM 68 68 68 68 68 68 68 68 68 68 66 66 Heating (WEH) AM 66 66 66 66 66 68 68 68 68 68 68 68 PM 68 68 68 68 68 68 68 68 68 68 66 66 MECHANICAL VENTILATION Type Supply CFM Exhaust CFM Fan Watts HRV Heating System Run Time Cooling System None 0 0 0 0 1 - Electric Heat Pump 0% 1 -Central Unit MASS Mass Type Area Thickness Furniture Fraction Space_ Default(8 Ibs/sq.ft. 0 ft2 0 ft 0.8 Main 6/11/2021 3:18 PM EnergyGauge® USA 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 4 of 4 El A a FORM R405-2020 ENERGY PERFORMANCE LEVEL (EPL) DISPLAY CARD ESTIMATED ENERGY PERFORMANCE INDEX* = 93 The lower the EnergyPerformance Index, the more efficient the home. 7905 Sebastian Rd., Fort Pierce , FL, 34951 1. New construction or existing New (From Plans) 10. Wall Type and Insulation Insulation Area 2. Single family or multiple family Detached a. Concrete Block - Int Insul, Exterior R=4.1 1308.70 ft2 b. Frame - Wood, Adjacent R=13.0 . 173.33 ft 3. Number of units, if multiple family 1 c. N/A R= ft2 4. Number of Bedrooms 3 d. N/A R= ft2 11. Ceiling Type and insulation level Insulation Area 5. Is this a worst case? Yes a. Under Attic (Vented) R=30.0 1546.00 ft2 6. Conditioned floor area (ft2) 1546 b. N/A R= ft2 7. Windows" Description Area c. N/A R= ft2 a. U-Factor: Dbl, U=0.34 121.00 ft2 Ducts, location & insulation level R ft2 a. a. Sup: Attic, Ret: Main, AH: Main 6 320 SHGC: SHGC=0.23 b. U-Factor: Dbl, U=0.55 48.00 ft2 SHGC: SHGC=0.25 13. Cooling systems kBtu/hr Efficiency c. U-Factor. N/A ft2 a. Central Unit 29.2 SEER:16.00 SHGC: d. U-Factor: NIA ft2 14. Heating systems kBtu/hr Efficiency SHGC: a. Electric Heat Pump 29.2 HSPF:9.00 Area Weighted Average Overhang Depth: 1.000 ft. Area Weighted Average SHGC: . 0.236 8. Skylights Description Area 15. Hot water systems Cap: 50 gallons a. U-Factor(AVG): N/A ft2 a. Electric EF: 0.95 SHGC(AVG): NIA b. Conservation features 9. Floor Types Insulation Area None a. Slab=On-Grade Edge Insulation R=0.0 1546.00 ft2 Credits (Performance method) Pstat b. N/A R= ft2 c. N/A R= ft2 I certify that this home has complied with the Florida Energy Efficiency Code for Building Construction through the above energy saving features which will be installed (or exceeded) in this home before final inspection. Otherwise, a new EPL Display Card will be completed based on installed Code compliant features. Builder Signature: Date: v -,,xf Address of New Home: City/FL Zip: *Note: This is not a Building Energy Rating. If your Index is below 70, your home may qualify for energy efficient mortgage (EEM) incentives if you obtain a Florida Energy Rating. For information about the Florida Building Code, Energy Conservation, contact the Florida Building Commission's support staff. "`Label required by Section R303.1.3 of the Florida Building Code, Energy Conservation, if not DEFAULT. 6/11/2021 3:18 PM EnergyGauge® USA 7.0.00 - FlaRes202O FSC 7th Edition (2020) Compliant Software Page 1 of 1 z020 -AIR BARRIER AND INSULATION INSPECTION,COMPONENT CRITERIA TABLE 402.4.1.1 AIR BARRIER AND.INSULATION INSPECTION COMPONENT CRITERIA'a Project Name: 154A RH - FP020029 Builder Name: FOCUS HOMES Street: 7905 Sebastian Rd. Permit Office: City, State, Zip: Fort Pierce , .FL, 34951 Permit Number: U Owner: FOCUS HOMES Jurisdiction; w Design Location: FL,'ST LUCIE_CO INTL 0 COMPONENT AIR BARRIER CRITERIA INSULATION INSTALLATION CRITERIA General A continuous air barrier shall be installed in the building envelope_ Air -permeable insulation shall requirements The exterior thermal envelope contains a continuous. air barrier. not be used as a sealing material. Breaks orjoints in the air barrier shall be sealed. Ceiling/attic The air barrier in any dropped ceiling/soffit shall be aligned with. The insulation in an dropped ceiling/soffit y pp g /soffit the insulation and any gaps in the air barrier shall be sealed. shall be aligned with the air barrier. Access openings, drop down stairs or knee wall doors to unconditioned attic spaces shall be sealed. Walls The junction of the foundation and sill plate shall be sealed. Cavities within corners and headers of frame walls The junction of the top plate and the top of exterior walls shall be shall be insulated by completely filling the cavity sealed. with a material having a thermal resistance of R-3 Knee walls shall be sealed. per inch minimum. Exterior thermal envelope -insulation for framed walls shall be installed in substantial contact and continuous alignment with the air barrier. Windows, skylights The space between window/doorjambs and framing, and and doors skylights and.framing shall be sealed. Rim joists Rim joists shall include the air barrier. Rim joists shall be insulated. Floors The air barrier shall be installed at any exposed edge of Floor framing cavity insulation shall be installed to (including insulation. maintain permanent contact with the underside of above -garage subfloor decking, or floor framing cavity insulation and cantilevered shall be permitted to be in contact with the top side floors) of sheathing, or continuous insulation installed on the underside of floor framing and extends from the bottom to the top of all perimeter floor framing members. Crawl space walls Exposed earth in unvented crawl spaces shall be covered with Where provided instead of floor insulation, insulation a Class I vapor retarder with overlapping joints taped, shall be permanently attached to the crawlspace wall . Shafts, penetrations, Duct shafts, utility penetrations, and flue shafts opening to exterior or unconditioned space shall be sealed. Batts in narrow cavities shall be cut to fit, or narrow Narrow cavities cavities shall be filled by insulation that on installation readily conforms to the available cavity spaces. Garage separation Air sealing shall be provided between the garage and conditioned spac as. Recessed lighting Recessed light fixtures installed in the building thermal envelope Recessed light fixtures installed in the building shall be sealed to the finished surface_ thermal envelope shall be air tight and IC rated. Plumbing and wiring Batt insulation shall be cut neatly to fit around wiring and plumbing in exterior walls, or insulation that on installation readily conforms to available space shall extend behind i' Shower/tub The air barrier installed at exterior walls adjacent to showers and Exterior walls.adjacent to showers and tubs shall on exterior wall tubs shall separate them from the showers and tubs. be insulated. Electrical/phone box or The air barrier shall be installed behind electrical or communication exteriorwalls boxes orair-sealed boxes shall be installed. HVAC register boots HVAC supply and return register boots that penetrate building thermal envelope shall be sealed to the sub -floor, wall covering or Concealed When required to be sealed, concealed fire sprinklers shall only be sprinklers sealed in a manner that is recommended by the manufacturer. Caulking or other adhesive sealants shall not be used to fill voids between fire sprinkler cover plates and walls or ceilings. I I I I a. In addition, inspection of log walls shall be in accordance with the provisions of ICC-400. 6/11/2021 3:18 PM EnergyGauge® USA 7.0.00 - FlaRes2020 FBC 7th Edition (2020) Compliant Software Page 1 of 1