HomeMy WebLinkAboutENERGY EFFICIENCY CODE1
iWORM R405-2020
r
,LORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION
Florida Department of Business and Professional Regulation - Residential Performance Method
Project Name: 154A RH - FP020029
Builder Name: FOCUS HOMES
Street: 7905 Sebastian Rd.
Permit Office:
City, State, Zip: Fort Pierce , FL, 34951
Permit Number:
Owner: FOCUS HOMES
Jurisdiction:
Design Location: FL, ST_LUCIE_CO_INTL
County: St. Lucie (Florida Climate Zone 2 )
1. New construction or existing New (From Plans)
10. Wall Type41482.0 sqft.)
Insulation. Area
2_ Single family or multiple family Detached
a. Concrete Block - Int Insul, Exterior
R=4.1 1308.70 ft2
b, Frame - Wood, Adjacent
R=1.3.0 173.33 ft2
3. Number of units, if multiple family 1
c. N/A
R= ft2
4. Number of Bedrooms 3
d. N/A
R= ft2
11. Ceiling Types (1546.0 sqft.)
Insulation Area
5. Is this a worst case? Yes
a. Under Attic (Vented)
R=30.0 1546.00 ft2
6. Conditioned floor area above grade (ft2) 1546
b. N/A
R= ft2
Conditioned floor area below grade (ft2) 0
c. N/A
R= ft2
7. Windows(169.0 sqft.) Description Area
12. Ducts
a. sup: Attic, Ret: Main, AH: Main
R ft2
6 320
a. U-Factor. Dbl, U=0.34 121.00 ft2
SHGC: SHGC=0.23
b. U-Factor: Dbl, U=0.55 48.00 ft2
13. Cooling systems
kBtulhr Efficiency
SHGC: SHGC=0.25
a. Central Unit
29.2 SEER:16.00
c. U-Factor. N/A ft2
SHGC:
ft Area Weighted Average Overhang Depth: 1.000 .
14. Heating systems
kBtu/hr Efficiency
Area Weighted Average SHGC: 0.236
a. Electric Heat Pump
29.2 HSPF:9.00
8. Skylights Area
c. U-Factor.(AVG) N/A ft2
15. Hot water systems
SHGC(AVG): N/A
a. Electric
Cap: 50 gallons
9. Floor Types (1546.0 sqft.) Insulation Area
EF:0.950
a. Slab -On -Grade Edge Insulation R=0.0 1546.00 ft2
b. Conservation features
b. N/A R= ft2
None
c. N/A R= ft2
16. Credits
Pstat
Glass/Floor Area: 0.109 Total Proposed Modified Loads: 46.40
PASS
Total Baseline Loads: 49.91
1 hereby certify that the plans and specifications covered by
Review of the plans and
-HE S7Ar
this calculation are in compliance with the Florida Energy
specifications covered by this
Code.
calculation indicates compliance
with the Florida Energy Code.
' • ����
PREPAFjE�
Before construction is completed
DATE: �P2
this building will be inspected for
compliance with Section 553.908
* • 0_
I hereby certify that this building, as designed, is in compliance
Florida Statutes.
CUD
with the Florida Energy Code.
WE'T¢_
OWNER/AGENT: J"
BUILDING OFFICIAL:
DATE: L
DATE:
- Compliance requires certification by the air handler unit manufacturer that the air handler enclosure qualifies as
certified factory -sealed in accordance with R403.3.2.1.
- Compliance requires an Air Barrier and Insulation Inspection Checklist in accordance with R402.4.1.1 and this project requires an
envelope leakage test report with envelope leakage no greater than 7.00 ACH50 (R402.4.1.2).
6/11/2021 3:18 PM EnergyGauge® USA 7.0.00 - FlaRes2020 FBC 7th Edition (2020) Compliant Software Page 1 of 4
FORM A405-2020 INPHT SIIMMARV (_141:r111. IST RI`0r11?T
PROJECT
,,,Title:
JBuilding Type:
Owner Name:
# of Units:
Builder Name:
Permit Office:
Jurisdiction:
Family Type:
New/Existing:
Comment:
154A RH - FP020029
User
FOCUS HOMES
1
FOCUS HOMES
Detached
New (From Plans)
Bedrooms:, 3
Conditioned Area: 1546
Total Stories: 1
Worst Case: Yes
Rotate Angle: 0
Cross Ventilation: No
Whole House Fan: No
Address Type:
Lot #
Block/Subdivision:
PlatBook:
Street:
County:
City, State, Zip:
Street Address
7905 Sebastian Rd.
St. Lucie
Fort Pierce ,
FL , 34951
CLIMATE
/
V Design Location
Design Temp
TMY Site 97.5 % 2.5 %
Int Design Temp Heating, Design Daily Temp
Winter Summer Degree Days Moisture Range
FL, ST LUCIE CO_INTL FL_VERO_BEACH_MUNI 39 90
70 75 299
58 Medium
BLOCKS
Number
Name
Area Volume
1
Blocki
1546 13914
SPACES
Number
Name
Area Volume Kitchen Occupants
Bedrooms InfilID Finished Cooled Heated
1
Main
1546 13914 Yes 4
3 1 Yes
Yes Yes
FLOORS
#
Floor Type
Space Perimeter R-Value
Area
Tile Wood Carpet
1 Slab -On -Grade Edge Insulatio
Main 164 ft 0
1546 ft' ----
0 0.3 0.7
ROOF
/
V #
Roof Gable Roof
Type Materials Area Area Color
Rad Solar SA Emitt
Barr Absor. Tested
Emitt Deck Pitch
Tested Insul. (deg)
1
Hip Composition shingles 1729 ft' 0 ft' Medium
N 0.85 No 0.9
No 0 26.6
ATTIC
/
V #
Type
Ventilation Vent Ratio (1 in)
Area. RBS ACC
1
Full attic
Vented 150 1546 ft' N N
CEILING
#
Ceiling Type
Space R-Value Ins Type Area Framing Frac Truss Type-
1
Under Attic (Vented)
Main 30 Blown
1546 ftz 0.07
Wood
6/11/2021 3:18 PM EnergyGaugeO USA 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 2 of 4
FORM f4405`2020 INPUT SUMMARY CHECKLIST REPORT
WALLS.
"'; .
Adjacent
'10 Space
Cavity Width
Height
Sheathing, Framing. Solar Below
2 Ornt
ANalt=ypg R_ lal,le. Et!n Ft-
In Area wv-lue Emnfio , AhSOr
(rad• o
1 N
Exterior Concrete. Block - Int Insul Main.
4.1 20 0 8
8 1.73.3 ft?
0 0.6
0
_2 E
Exterior Concrete, Block - Int lnsul .Main
4.1 46 0' 8
8 398:7 ft2
0 0.6
0.
_3 S
Exterior 'Concrete Block - lntlnsul Main
4.1 39 ' 8
8 338.0ft2
0 0.6
0
4 W
Exterior Concrete Block - Int Insul Main
4.1 46 8
13 398.7 ft'
0 0.6
0
5 N
Garage Frame -,Wood Main
13 20 8
8, 173 3 ft'
0.19 0,01
0
DOORS;
#
Ornt Door Type Space
Storms
U-Value
Width Height
Area
Ft
In Ft In
1
N Insulated Main
None
.16 3
8
24. ftz• .
2
N Insulated Main
None
.16 2
6 6 8
16.7 W
WINDOWS
Orientation shown- is the entered orientation (=>) changed to -Worst Case.
Wall
Overhang
V #
Ornt ID Frame Panes NFRC
U-Factor SHGC Imp
Area Depth
Separation Int Shade
Screening
1
N 1 Vinyl Low-E Double Yes
0:34 0.23 N
15.0 ft? 1 ft 0 in
1 ft 6 in- Drapes/blinds
None
2
E 2 Vinyl Low-E Double Yes
0:34 0.23 N
30.0 ft' 1 ft 0 in
1 ft 0 in Drapes/blinds
None
3
E 2 Vinyl Low-E Double Yes
0.34 0.23 N
6.0 ft2 1 ft0 in
2 ft 0 in Drapes/blinds
None
4
S 3 , Metal Low-E Double Yes
0.55 0.25. N
48.0 ft' 1 ft 0 in
1 ft 0 in Drapes/blinds
None
6
S 3 Vinyl Low-E Double Yes
0.34 0.23 N
40.0 ft' 1 ft 0 in
2 ft 0 in Drapes/blinds
None
6
W 4 Vinyl Low-E Double Yes
0.34 0.23 N
30.0 ft' 1 ft 0 in
2 ft 0 in Drapes/blinds
None
GARAGE
#
Floor Area Ceiling Area
Exposed Wall Perimeter
Avg. Wall Height
Exposed Wall Insulation
1
408 ft' 408 ft?
45 ft
,9 ft
1
INFILTRATION
# Scope
Method SLA
CFM 50 ELA EgLA ACH
ACH 50
1 Wholehouse Proposed ACH(50) .0004
1623.3 •89.06 167.2 :1324
7
HEATING SYSTEM
#
System Type Subtype
Speed Efficiency
Capacity
Block
Ducts
1
Electric Heat Pump/ None
Singl HSPF:9
29.2 kBtu/hr.
1
sys#1
COOLING SYSTEM
#
System Type Subtype
Subtype Efficiency
Capacity Air Flow SHR Block
Ducts.
1
Central Unit/ None
Singl SEER: 16 29.2 kBtu/hr 87.6 cfm 0.73 1
sys#1
6/11/2021 3:18 PM EnergyGaugeQ USA 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant.Software Page 3 of 4
FORM K405-2020 INPUT SUMMARY CHECKLIST REPORT
HOT WATER SYSTEM
# System Type SubType
Location EF Cap Use
SetPnt
Conservation
1 Electric None
Garage 0.96 50 gal 47 gal
120 deg
None
SOLAR HOT WATER SYSTEM
FSEC
Collector
Storage
Cert # Company Name
System Model.# Collector Model
# Area
Volume
FEF
None None
ft2
DUCTS
— Supply —
-- Return ---
Air
CFM 25
CFM25
HVAC #
V # Location R-Value Area
Location Area LeakaggType
Handler
TOT
OUT
QN RLF
Heat Cool
1 Attic 6 320 ft�
Main 20 ft2 Default Leakage
Main
(Default) (Default)
1 1
TEMPERATURES
Programable Thermostat: Y
Ceiling Fans:
Cooling[[X]] Jan Feb Mar
A r X Ma ]Jun Jul
X Au
X Se
f
X Oct X Nov
f f
X Dec
XFeb Xj Mar
Heatin[X] Jan �Xj
XApr May �X] Jun r �Jul
�Xj
f X� Aug
Xj Sep
X�Oct
Xj Nov
XDec
Venting [X Jan X Feb [X Mar
X Apr X May [X Jun Jul
lX�
X Aug
X Sep
X Oct X Nov
X Dec
Thermostat Schedule: HERS 2006 Reference
Hours
Schedule Type 1
2 3 4 5 6
7
8
9
10 11
12
Cooling (WD) AM 78
78 78 78 78 78
78
78
80
80 80
80
PM 80
80 78 78 78 78
78
78
78
78 78
78
Cooling (WEH) AM 78
78 78 78 78 78
78
78
78
78 78
78
PM 78
78 78 78 78 78
78
78
78
78 78
78
Heating (WD) AM 66
66 66 66 66 68
68
68
68
68 68
68
PM 68
68 68 68 68 68
68
68
68
68 66
66
Heating (WEH) AM 66
66 66 66 66 68
68
68
68
68 68
68
PM 68
68 68 68 68 68
68
68
68
68 66
66
MECHANICAL VENTILATION
Type Supply CFM
Exhaust CFM Fan Watts HRV Heating System
Run Time
Cooling System
None 0
0 0 0 1 - Electric Heat Pump
0%
1 -Central Unit
MASS
Mass Type
Area Thickness Furniture Fraction
Space_
Default(8 Ibs/sq.ft.
0 ft2 0 ft
0.8
Main
6/11/2021 3:18 PM EnergyGauge® USA 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 4 of 4
El
A
a
FORM R405-2020
ENERGY PERFORMANCE LEVEL (EPL) DISPLAY CARD
ESTIMATED ENERGY PERFORMANCE INDEX* = 93
The lower the EnergyPerformance Index, the more efficient the home.
7905 Sebastian Rd., Fort Pierce , FL, 34951
1. New construction or existing
New (From Plans)
10. Wall Type and Insulation
Insulation
Area
2. Single family or multiple family
Detached
a. Concrete Block - Int Insul, Exterior
R=4.1
1308.70 ft2
b. Frame - Wood, Adjacent
R=13.0 .
173.33 ft
3. Number of units, if multiple family
1
c. N/A
R=
ft2
4. Number of Bedrooms
3
d. N/A
R=
ft2
11. Ceiling Type and insulation level
Insulation
Area
5. Is this a worst case?
Yes
a. Under Attic (Vented)
R=30.0
1546.00 ft2
6. Conditioned floor area (ft2)
1546
b. N/A
R=
ft2
7. Windows" Description
Area
c. N/A
R=
ft2
a. U-Factor: Dbl, U=0.34
121.00 ft2
Ducts, location & insulation level
R ft2
a.
a. Sup: Attic, Ret: Main, AH: Main
6 320
SHGC: SHGC=0.23
b. U-Factor: Dbl, U=0.55
48.00 ft2
SHGC: SHGC=0.25
13. Cooling systems
kBtu/hr
Efficiency
c. U-Factor. N/A
ft2
a. Central Unit
29.2 SEER:16.00
SHGC:
d. U-Factor: NIA
ft2
14. Heating systems
kBtu/hr
Efficiency
SHGC:
a. Electric Heat Pump
29.2
HSPF:9.00
Area Weighted Average Overhang Depth:
1.000 ft.
Area Weighted Average SHGC: .
0.236
8. Skylights Description
Area
15. Hot water systems
Cap:
50 gallons
a. U-Factor(AVG): N/A
ft2
a. Electric
EF: 0.95
SHGC(AVG): NIA
b. Conservation features
9. Floor Types
Insulation
Area
None
a. Slab=On-Grade Edge Insulation
R=0.0
1546.00 ft2
Credits (Performance method)
Pstat
b. N/A
R=
ft2
c. N/A
R=
ft2
I certify that this home has complied with the Florida Energy Efficiency Code for Building
Construction through the above energy saving features which will be installed (or exceeded)
in this home before final inspection. Otherwise, a new EPL Display Card will be completed
based on installed Code compliant features.
Builder Signature: Date: v -,,xf
Address of New Home: City/FL Zip:
*Note: This is not a Building Energy Rating. If your Index is below 70, your home may qualify for energy efficient
mortgage (EEM) incentives if you obtain a Florida Energy Rating. For information about the Florida Building Code,
Energy Conservation, contact the Florida Building Commission's support staff.
"`Label required by Section R303.1.3 of the Florida Building Code, Energy Conservation, if not DEFAULT.
6/11/2021 3:18 PM EnergyGauge® USA 7.0.00 - FlaRes202O FSC 7th Edition (2020) Compliant Software Page 1 of 1
z020 -AIR BARRIER AND INSULATION INSPECTION,COMPONENT CRITERIA
TABLE 402.4.1.1
AIR BARRIER AND.INSULATION INSPECTION COMPONENT CRITERIA'a
Project Name: 154A RH - FP020029 Builder Name: FOCUS HOMES
Street: 7905 Sebastian Rd. Permit Office:
City, State, Zip: Fort Pierce , .FL, 34951 Permit Number:
U
Owner: FOCUS HOMES Jurisdiction;
w
Design Location: FL,'ST LUCIE_CO INTL
0
COMPONENT
AIR BARRIER CRITERIA
INSULATION INSTALLATION CRITERIA
General
A continuous air barrier shall be installed in the building envelope_
Air -permeable insulation shall
requirements
The exterior thermal envelope contains a continuous. air barrier.
not be used as a sealing material.
Breaks orjoints in the air barrier shall be sealed.
Ceiling/attic
The air barrier in any dropped ceiling/soffit shall be aligned with.
The insulation in an dropped ceiling/soffit
y pp g /soffit
the insulation and any gaps in the air barrier shall be sealed.
shall be aligned with the air barrier.
Access openings, drop down stairs or knee wall doors to
unconditioned attic spaces shall be sealed.
Walls
The junction of the foundation and sill plate shall be sealed.
Cavities within corners and headers of frame walls
The junction of the top plate and the top of exterior walls shall be
shall be insulated by completely filling the cavity
sealed.
with a material having a thermal resistance of R-3
Knee walls shall be sealed.
per inch minimum.
Exterior thermal envelope -insulation for framed
walls shall be installed in substantial contact and
continuous alignment with the air barrier.
Windows, skylights
The space between window/doorjambs and framing, and
and doors
skylights and.framing shall be sealed.
Rim joists
Rim joists shall include the air barrier.
Rim joists shall be insulated.
Floors
The air barrier shall be installed at any exposed edge of
Floor framing cavity insulation shall be installed to
(including
insulation.
maintain permanent contact with the underside of
above -garage
subfloor decking, or floor framing cavity insulation
and cantilevered
shall be permitted to be in contact with the top side
floors)
of sheathing, or continuous insulation installed on
the underside of floor framing and extends from the
bottom to the top of all perimeter floor framing
members.
Crawl space walls
Exposed earth in unvented crawl spaces shall be covered with
Where provided instead of floor insulation, insulation
a Class I vapor retarder with overlapping joints taped,
shall be permanently attached to the crawlspace wall
.
Shafts, penetrations,
Duct shafts, utility penetrations, and flue shafts opening to
exterior or unconditioned space shall be sealed.
Batts in narrow cavities shall be cut to fit, or narrow
Narrow cavities
cavities shall be filled by insulation that on
installation readily conforms to the available cavity
spaces.
Garage separation
Air sealing shall be provided between the garage and conditioned spac
as.
Recessed lighting
Recessed light fixtures installed in the building thermal envelope
Recessed light fixtures installed in the building
shall be sealed to the finished surface_
thermal envelope shall be air tight and IC rated.
Plumbing and wiring
Batt insulation shall be cut neatly to fit around wiring
and plumbing in exterior walls, or insulation that on
installation readily conforms to available space shall
extend behind i'
Shower/tub
The air barrier installed at exterior walls adjacent to showers and
Exterior walls.adjacent to showers and tubs shall
on exterior wall
tubs shall separate them from the showers and tubs.
be insulated.
Electrical/phone box or
The air barrier shall be installed behind electrical or communication
exteriorwalls
boxes orair-sealed boxes shall be installed.
HVAC register boots
HVAC supply and return register boots that penetrate building
thermal envelope shall be sealed to the sub -floor, wall covering or
Concealed
When required to be sealed, concealed fire sprinklers shall only be
sprinklers
sealed in a manner that is recommended by the manufacturer.
Caulking or other adhesive sealants shall not be used to fill voids
between fire sprinkler cover plates and walls or ceilings. I I
I
I
a. In addition, inspection of log walls shall be in accordance with the provisions of ICC-400.
6/11/2021 3:18 PM EnergyGauge® USA 7.0.00 - FlaRes2020 FBC 7th Edition (2020) Compliant Software Page 1 of 1