Loading...
HomeMy WebLinkAboutFilled Density TestPhone 954-784-2941 800-848-1919 jeder'a-' Fax 954-784-7875 & TESTING INC. www.fed-eng.com 250 SW 13th Ave Pompano Beach, FL 33069 Field Density Tests of Compacted Soils Method D-6938 Project: Proposed Pool Date: December 15, 2017 Address: 8335 Calumet Court, Port Saint Lucie, FL rQrder #: 17-2944 Area Tested:' Pool Deck Backfill CPermit A 170802 2 Material Type: Pale Gray Sand h Client: Pools By Vitali Address: 1544 SE Crowberry Drive Compaction Req.: Port St. Lucie, FL 34983 Proctor Method: 95% ASTM D-1557 Test # TEST LOCATION Probe Depth Elev. Moist % Dry Density PCF Proctor Value PCF Optimum Moisture % ` Compaction Pass 1 West Center Side of Pool Deck 12" FL 13.2 101.2' 104.1 14.0 97.2% Yes 2 1 East Center Side of Pool Deck 12" 1 FL 12.91 101.1 104.1 14.0 97.1 % Yes 3 North Center Side of Pool Deck 12" FL 12.9 103.0 104.1 14.0 98.9% Yes 4 5 6 7 8 FEE 12- 2018 9 10 11 12 13 14 Remarks: See Reverse Side -(Page 2 of 2) for Additional Information for Disclaimer This is a Compaction Test only on the top 12" of the pool deck and is not a verification of,SoEl Bearing Capacity. Legend for Elevation: �� , 4�'�l PR = Proofroll 1,2,3 = 1st, 2nd, 3rd Lift Submitted by: L., SL = Springline FL = Final Lift Keith LeBlanc, P.E. 041.7 SG = Subgrade BG = Below Grade Federal Engineering & Testing, inc. BC = Basecourse BOF = Bottom of Footing Florida"Reg. No. 59394 l TOP = Top of Pipe FG = Finished Grade CerE fic4e of Authorization #5471 As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publi'ation of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval. A density test determines"thetidegres of compactid�. of -the tested layer of material only. A density does not replace a soil bearing capacity determination. These density tests do not certify the underlying sodmaterieis bs4cw the proposed structure. The results do not preclude or guarantee that future settlement and cracking will not occur. A soil boring test is required to ceitify.`.hat:the underlying soils will supportthe proposed structure without settlement. If no soil borings have been performed to verify the underlying soils, we recommend that soii.bodngs be performed to evaluate the suitability of the underlying soil to support the proposed structure. After laying dormant for a period of 90 days or after heavy rain/storms, retesting must be performed on this work. PAGE 1 of 2 Compacted Soils Method ®-6936 Disclaimer Pursuant to your request, Federal Engineering & Testing, Inc. (FET) has performed a compaction test at the referenced project on the reverse side. The purpose of our test was to determine' the degree of compaction of the tested layer of material only. In no way shall a compaction test replace a soil bearing capacity determination. A soil boring test must be performed by the, client prior to construction to verify underlying subsoil conditions. Our scope of services only included testing the top 12" of the pool bottom pad material. FET was not contracted to perform supervision of the pool pad preparation or excavation to verify if undermining of the building foundation has occurred. This testing of the fill material does not include an analysis of the underlying soil conditions and materials to determine if they are capable of supporting the proposed structure without settlement. This density compaction test does not warranty any underlying soil materials or conditions below the tested top 12" of material. If no soil borings have been performed in the location of the proposed structure, we recommend performing soil borings below all foundation areas of the proposed structure to verify the underlying soil conditions. Environmental analysis of the soil materials is not part of the scope of services. If environmental analysis of the soils is required, we can provide a proposal for performing an environmental analysis of the soil materials. The scope of services is for determination of the degree of compaction of the tested layer of material only. No other analysis is implied or warranted. Job project specifications were not available at the time the work was performed. Determination of the pass/fail compaction results are based on current common industry requirements of '95% of the ASTM D-1557 standard for building and pool foundations. If different specifications are required, Federal Engineering & Testing, Inc. shall be notified. Our findings are relative to the date and areas of our site work and should not be relied upon to represent conditions on other areas of the site or other dates. Any subsequent site disturbances due to water erosion, rain, construction activities, excavations, overgrown vegetation, traffic and other disturbances will void this test and the site must be re -compacted and re -tested prior to construction. As a mutual protection to clients, the'public and ourselves, all reports are submitted as the confidential property of our client and authorization for use, publication of statements, conclusions or extracts from or regarding our reports is reserved our reports is reserved,pending our,written approval. It has been a pleasure working with you and look forward to do so in the near future. Page 2 of 2