Loading...
HomeMy WebLinkAboutProduct Approval Roofing Inderlaymentsodds Building Lode Online https://www.floridabr-"-f, BCIS Home tog in User Registration Hot Taprs Submit Surcharge Stats & Fads Busines Urn" product Approval Professi-al USER: Public User RLg1iIa-i1ot t Product Aon oyelJlsRr! > Product or IcalIgn Search > Aan9otton ust > AppGmtion De -tall FL # Application Type Code Version Application Status Comments Archived Product Manufacturer Address/Phone/Email Authorized Signature Technical Representative Address/Phone/Email Quality Assurance Representative Address/Phone/Email Category Subcategory Compliance Method Florida Engineer or Architect Name who developed the Evaluation Report Florida License Quality Assurance Entity Quality Assurance Contract Expiration Date Validated By Certificate of Independence Referenced Standard and Year (of Standard) 01 Publications FRC Staff SCIS Sire Maplinks search �, ONCf ALEO FAS i EPIERS OR ATTACHM't o ARE THE RESPONSIBILITY OF THR OONTP.AMOR OF FICORD FL16048-R3 Revision 2014 H"EESE PLANS AND ALL PROPOSE® WORK Approved ARE SUBJECT TO ANY CORRECTIONS REQUIRED BY FIELD INSPECTORS THAT MAY 8E kiEOE30ARY--aR� N g0R�EM.'� t 'yOR�n V' vi rt�b e'�,fj�Pgjucs6w1 q TRI-BUILT Roofing Products 9050 Louisiana Street Merrillville, IN 46410 (201) 842-2449 david.ruiz@tribuiltmaterlaisgroup.com David Ruiz david.ruiz@tribuiltmaterialsgroup.com David Ruiz 250 Route 17 North _ East Rutherford, NJ 07073 ST. � i ° 1 �'0UXTY B1-J?.�D" : �= DP'ULSiL,=''i (201) 842-2449 ti> iV� LIAI�TCEE david.ruiz@tribuiltmaterial ruup:coj`' �" DATA , 'L A'S � ,TD P:r 1T 1�'� UST BL ��PT ON 313 Roofing Underlayments Evaluation Report from a Florida Registered Architect or a Licensed Florida Professional Engineer Evaluation Report - Hardcopy Received Robert Nieminen PE-59166 UL LLC 10/16/2017 John W. Knezevich, PE Validation Checklist - Hardcopy Received FL16048 R3 COI 2015 01 COI Nfeminen.pdf Standard ASTM D1970 ASTM G155 FRSA9-RI April 2012 (04-12) TAS 103 Vear 2009 2005 2012 1995 1 of 2 5/24/2016 9:58 AM i `oiida Building Code Online I https://wwwfloridabuil( ;Drgtpr/pr app tl.aspx?param=wGEVX... Equivalence of Product Standards Certified By Sections from the Code f Product Approval Method Method 1 Option D Date Submitted 10/08/2015 Date Validated 10119/2015' Date Pending.FBC Approval 10/21/2015 Date Approved 12/15/2015 I i Sunimarrof Products FL # i Model, Number or Name { Description - --- i 116048.1 — $ TRI-BUILT Roof Underlayments J Self -adhering, modified bitumen roof underlayments { Limits of Use ! Installation Instructions i 1 Approved for use in HVHZ: No i FL16048 R3 II 2015 10 FINAL ER TRI- i Approved for use outside HVHZ: Yes ' BUILT UNDERLAYMENTS FL16048-R3.odf j Impact Resistant: N/A Verified By: Robert Nieminen PE-59166 Design Pressure: +N/A/-45 i Created by Independent Third Party: Yes { Other: 1.) The design pressure noted heroin pertains to use Evaluation Reports of foam -on the systems overtop the self -adhering FL16048 R3 AE 2015 10 FINAL ER TRI- I underiayment for one particular application. See ER Section BUILT UNDERLAYMENTS FL16048-R3,pdF { 5.6 for details. 2:) Refer to ER Section 5 for other Limits of Created by Independent Third Party: Yes i i Use. east Ssntadtis :: 1.940 North Monroe Street Tallahassee FL 32399 phone: 850-487-i8Z¢ The State of Florida is an AA/EEO employer. CQovdght 2007-2Q13 State of Flonda :: Privacy Statement:: AccessIbM Statement :: RePond Statement .Under Florida law, email addresses are public records. R you do not want your a -mat address released In response to a public -records request, do not send electronic mall to this entity. Instead, contact the office by phone or by traditional mall. 11 you have any questions, please contact 850.487.1395. -Pursuant to Section 455.275(1), Florida Statutes, effective October 1, 2012, licensees licensed under Chapter 455, F.S. must provide -the Department With an email address If they have one. The emals provided may be used for official communication with the ke see. However email addresses are public record, tf you not wish to supply a personal address,please provide the Department with an email address which can be made available to the pub&. Tb determine f you are a licensee under Chapter 455, F.S., please click hM. -Product Approval Ao ptv: W 'E—�Fzl Kid 2 of 2 5/24/2016 9:58 AM i EXTERIOR RESEARCH & DESIGN, LLC. Certifrcafe of Authorization #9503 ��� ��� 353 CHRISTIAN STREET, UNIT #13 OXFORD, CT 06478 PHONE; (263) 262-9245 FAX 2 EVALUATION REPORT :I 031 262-9243 Allied Building Products Corp. Evaluation Report A42960.10.12-R3 dba TRI-BUILT Roofing Products FL16048-R3 Merrillville, Louisiana Street Date of Issuance:10/25/2012 'SCOPE: illville,lN 46410 Revision 3: 10/08/2015 This Evaluation Report is issued under Rule 611320-3 and the applicable rules and regulations governing the use of construction materials in the State of Florida. The documentation submitted has been reviewed by Robert Nieminen, P.E. for use of the product under the Florida Building Code and Florida Building Code, Residential Volume. The products described herein have been evaluated for compliance with the 5th Edition (2014) Florida Building Code sections noted herein. DESCRIPTION: TRI-BUILT Roof Underlayments LABELING: Labeling shall be in accordance with the requirements the Accredited Quality Assurance Agency noted herein. CONTINUED COMPLIANCE: This Evaluation Report is valid until such time as the named product(s) changes, the referenced Quality Assurance documentation changes, or provisions of the Code that relate to the product change. Acceptance of this Evaluation Report by the named client constitutes agreement to notify Robert Nieminen, P.E. if the product changes or the referenced Quality Assurance documentation changes. Trinity] ERD requires a complete review of this Evaluation Report relative to updated Code requirements with each Code Cycle. ADVERTISEMENT: The Evaluation Report number preceded by the words. "Trinity IERD Evaluated" may be displayed in advertising literature: If any portion of the Evaluation Report is displayed, then it, shall be done in its entirety. INSPECTION: Upon request, a copy -of this entire Evaluation Report shall be provided to the user by the manufacturer or its distributors and shall be available for inspection at the job site at the request of the Building Official. This Evaluation Report consists of pages 1 through 5. Prepared by: Robert J.M. Nieminen, P.E. Florida Registration No. 59166, Florida DCA ANE1983 +Ut�trtirrnry, "' to ed — { — i� �'� `, The facsinnh seal appearing was authorized by Robert Nieminen. P.E.an10/0R/2015. This does not serve asanelectronically signed document. Signed, sealed hardcoplas have been transmitted to the Product Approval Administrator and th di CERTIFICATION OF INDEPENDENCE: e rum ant 1. TrinitylERD does not have, nor does it intend to acquire or will it acquire, a financial interest in any company manufacturing or distributing products it evaluates. 2. Trinity) ERD is not owned, operated or controlled by any company manufacturing or distributing products it evaluates. 3. Robert Nieminen, P.E. does not have nor will acquire, a financial interest'in any company manufacturing or distributing products for which the evaluation reports are being issued. 4. Robert Nieminen, P.E. does not have, nor will acquire, a financial interest in any other entity involved in the approval process of the product. 5. This is a building code evaluation. Neither Trinity IERD nor Robert Nieminen, P.E. are, in any way, the Designer of Record for any project on which this Evaluation Report, or previous versions thereof, is/was used for permitting or design guidance unless retained specifically for that purpose. ROOFING COMPONENT EVALUATION: " I. SCOPE:. p - Product Category: Roofing Sub -Category: Underlayment Compliance Statement: TRI-BUILT Roof Undedayments, as produced by TRI-BUILT, have demonstrated compliance with the following sections of the Florida .Building Code through testing in accordance with the following Standards. Compliance is subject to the Installation Requirements and Limitations / Conditions of Use set forth herein. 2. STANDARDS: Section Property Standard Year 1507.2.4, 1507.2.8,1507.2.9.2, Physical Properties ASTM D1970 2009 1507.4.5.1, 1507.5.3,1507.7.3 1504.6 Accelerated Weathering ASTM G155 2005 1507.3.3 Installation Practice FRSA/TRI April 2012 (04-12) 2012 1523.6.5.2.1 Physical Properties TA5103 1995 3. REFERENCES: En_ td7C Examination Reference Date ERD (TST6049) Physical Properties 540540.02.13-1 02/19/2013 ERD (T5T6049) Physical Properties S40540.11.13 11/19/2013' ERD (TST6049) Physical Properties S40540.03.14 08/26/2024 ERD (TST6049) Physical Properties S44870.04.14-2 04/02/2014 ERD (TST6049) Physical Properties $44870.04.14-3 04/02/2014 ERD (TST6049) Physical Properties S44870.04.14-1 04/10/2014 ERD (TST6049) Physical Properties S44870.04.14-4 04/16/2014 ERD (TST6049) Physical Properties S43530.02.14-1-R1 05/14/2014 ERD (TST6049) .Physical Properties S43530.05.14 05/28/2014 ERD (TST6049) Physical Properties S40540:10.14 10/31/2014 ERD (TST6049) Physical Properties SC7645.02.15 02/13/2015. ERD (TST6049) Accelerated Weathering SC8520.04.15 05/27/2015 UL, LLC. (QUA9625) Quality Control Multiple -Listing R16814 09/04/2015 UL, LLC (QUA9625) Quality Control Service Confirmation Exp.10/16/2017 4. PRODUCT DESCRIPTION: 4.1 Self-Adherine Underlavments:. 4.1.1 Tri-Built Sand-R SA Shingle Underlayment is a self -adhering, glass=mat reinforced, sand -surfaced, SBS modified bitumen roof underlayment, with a 36-inch sheet width. 4.1.2 Tri-Built S/A HT TU Underlayment is a self -adhering, non -woven polyester fabric surfaced, SBS modified bitumen roof underlayment 4.1.3 ; Tri=Built Smooth HT S/A is a self -adhering, glass -mat reinforced, film -surfaced, SBS _Underlayment bitumen roof underlayment. modified S. LIMITATIONS: 5.1 This is a building code evaluation. Neither TrinitylERD nor Robert Nieminen, P.E. are, in any way, the Designer of Record for any project on which this Evaluation Report, or previous versions thereof, is/was used for permitting or design guidance unless retained specifically for that purpose. 5.2 This Evaluation Report is not for use in the HVHZ. 5.3 Fire Classification is not part of this Evaluation Report; refer to current Approved Roofing Materials Directory for fire ratings of this product. Exterior Research and Design, LLG Evaluation Report p42960.10.12-113 Cer*eote of Authortzotlon 99503 FL16048-R3 Revisibn 3:10/08/2015 Page 2 of 5 TRINITY ERD 5.4 TRI=BUILT Roof Underlayments may be used with any prepared roof cover where the product is specifically referenced within FBC approval documents. If not listed, a request may be made to the AHJ for approval based on this evaluation combined with supporting data for the prepared roof covering. 5.5 Allowable roof covers applied atop the underlavments are as fnllnwc- TABLE 1: ROOF COVER OPTIONS Underlayment Asphalt Shingles Nall -On Tile Foam -On Tile - Metal Wood Shakes Slate & Shingles Tri•Built Sand-R SA Shingle Underlayment Yes No No No Yes Yes Tri•Built S/A HT TU Yes Underlayment Yes Yes See 5.5.1 Yes Yes Yes Tri-Built Smooth HT S/A' Underlayment . Yes No No Yes Yes Yes 5.5.1 "Foam -On Tile'' is limited to use of the following Approved tile adhesives unless tensile adhesion / long term aging data from an accredited testing laboratory is provided. Tri-Built S/A HTTU Underlayment with 3M' 2-Component Roof Tile Adhesive AH-160 (FL6332) or Dow TileBond'TM Roof Tile Adhesive (FL717) 5.6 Allowable substrates are noted below: 5.6.1 Direct -Bond to Deck: Tri-Built Sand-R SA Shingle Underlayment, Tri-Built S/A HT TU Underlayment or Tri-Built Smooth HT S/A Underlayment applied to: Plywood; ASTM D41 primed plywood; OSB; ASTM D41 primed OSB; ASTM D41 primed structural concrete. While not required over plywood, 056.orSouthern Yellow Pine substrates, TRI-BUILT recommends priming the deck if the final roof cover is not slated for installation within 24 hours. Note: TRI-BUILT requires tongue -and -groove board decking be covered with plywood or OSB prior to installation of the self - adhering underlayment. 5.6.2 Bond -to -Insulation: Tri-Built S/A HT TU Underlayment applied to: ➢ Dens Deck Prime; SECUROCK Gypsum -Fiber Roof Board. For installation under mechanically attached prepared roof coverings, insulation shall be' attached per minimum requirements.of the prepared roof covering manufacturer's Product Approval. For installations under foam -on the systems, insulation attachment shall be designed by a qualified design professional and installed based on testing of the insulation/underlayment system in accordance with FM 4474, Appendix D or TAS 114, Appendix J. 5.6.3 Bond to Mechanically Attached Base Laver: D ASTM D226, Type I or II felt. For installations under mechanically attached prepared roof coverings; base layer shall be attached per minimum codified requirements. For installations under foam -on the systems, base layer shall be attached per minimum requirements of FRSA/TRI April 2012 (04-12). Exterior Research and Design, LLG Evaluation Report A42960.10.12-R3 Certlflcate of AUthorlwtlon #9503 F1.16048-R3 Revision 3:10/08/2035 Page 3 of 5 TRINIW . ERD 5.6.4 Wind Resistance for Underlayment Systems in Foam -On Tile Applications: FRSA/TRI April 2012 (04-12) does not address wind uplift resistance of all underlayment systems beneath foam -on the systems, where the underlayment forms part of the load -path. The following wind uplift limitations apply to direct -deck underlayment systems that are not addressed in FRSA/TRl April 2012 (04-12) and are used in foam -on tile applications. Maximum Design Pressure is the result of testing for wind load resistance based on allowable wind loads, and reflects the ultimate passing pressure divided by 2 (the 2 to 1 margin of safety per FBC 1504.9 has already been applied). Refer to FBC 1609 for determination of design wind pressures. 5.6.4.1 _M_aximum Design Pressure = -45 0 psf. Deck: Min. 15/32-inch plywood to meet project requirements to satisfaction of AHT. Primer: (00tional) ASTM D41 Underlayment: Tri-Built S/A HTTU Underlayment, self -adhered. 5.7 Exposure Limitations: 5.7.1 Tri-Built Sand-R SA Shingle Underlayment or Tri-Built Smooth HT S/A Underlayment shall not be left exposed for longer than 30-days after installation 5.7.2 Tri-BuiltS/A HT TU Underlayment shall not be left exposed for longer than 180-days after installation. 6. INSTALLATION: 6.1 TRI-BUILT Roof Underlayments shall be installed in accordance with TRI-BUILT published installation requirements subject to the Limitations set forth in Section 5 herein and the specifics noted below. 6.2 Re -fasten any loose decking panels, and check for protruding nail heads. Sweep the substrate thoroughly to remove any dust and debris prior to application, and prime the substrate (if applicable). 6.3 Tri-Built Sand-R SA Shin le Underlayment, Tri-Built S/A HT TU Underlayment or Tri-Built Smooth HT S A Underlayment: 6.3.1 Shall be installed in compliance with the requirements for ASTM D1970 underlayment in FBC Sections 1507 for the type of prepared roof covering to be installed. 6.3.2 Non -Tile applications: While priming is optional, TRI-BUILT recommends priming the deck if the final roof cover is not slated for installation within 24 hours. Apply sheet parallel to the roof edge. Roll out approximately 10 ft of membrane and peel back the first 3 ft of release film. Adhere the exposed part to thesubstrate and unroll the remaining membrane as far as possible. Once the entire length of membrane is in place, peel -off the release film diagonally while holding the membrane tight. Firmly roll the membrane into place to achieve a bond. Horizontal seams should be minimum 3-inches, configured to shed water. Vertical seams should be 6- inches and staggered not less than 2-ft from vertical seams in the course below. All over -granule end -laps shall be sealed using either heat -welding or hot air welding techniques. When installing at slopes above 8:12, Allied Building Products Corp recommends back -nailing in the overlap area at the top of the sheet at 12-inch o.c. For Valleys and Ridges: Cut underlayment into 4 to 6 foot lengths. Peel the release paper and center sheet over valley or ridge. Drape and press sheet into place, working from the center of the valley or ridge in each direction. For valleys, apply the sheet starting at the lowest point and work upward. 6.3.3 Tile Applications (Tri-Built S/A HTTU Underlayment onlvl: Reference is made to FRSA/TRI' April 2012 (04-12) Installation Manual and Table 1 herein, using the instructions noted above as a guideline. Tile shall be loaded and staged in a manner that prevents tile slippage and/or damage to the underlayment. Exterlor Research and Design, LLC Cefdflcate of Aothorrzatlort #9503 Evaluation Report A42960.10.12-R3 FL16048-R3 Revision 3:10/08/2015 Page 4 or 5 7. BUILDING PERMIT REQUIREMENTS: T'RIN11Y . ERD As required by the Building Official or Authority Having Jurisdiction in order to properly evaluate this product. the installation of 1 y 8. MANUFACTURING PLANTS: Contact the noted QA agency for information on product locations covered for F.A.C. Rule 9N 3 QA requirements. 9. QUALITY ASSURANCE ENTITY: UL, LLC—QUA9625; (314),578 3406; k.chancellor@us.ul.com - END OF EVALUATION REPORT - Exterior Research and Design, LLC rerdfkote of Author4oNon #9s03 Evaluation Report A42960.10.12-R3 { Fu604E-R3 tjJ Revision 3:10/08/2ols Page 5 of 5 r.