Loading...
HomeMy WebLinkAboutAPPROVED ID202 - FLOORING PLAN-01-2022OFFICE #3 104 OFFICE #2 103 OFFICE #1 102 OFFICE #4 105 DRIVER'S LOUNGE 106 OFFICE #6 107 LOBBY 101 WOMEN 118 OFFICE #7 109 OFFICE 110 MEN 117 BREAKROOM 116 CORRIDOR 113 IT. ROOM 114 WAREHOUSE 124 TECH'S RESTROOM 127 TECHS BREAKROOM 126 TECH'S 125 REF PARTS SHOWROOM 119 PARTS MANAGER 122 REF 33" sink30" sink PRINTER SERVICE MANAGER 123 COPIER 111 CONFERENCE 112 RECEPTION 108 JAN. 115 PARTS COUNTER 120 SERVICE COUNTER 121 42"H. COUNTER WITH BASE CABINET 42" COUNTER 1 3 5 .0 0 ° 2 2 1 2 IT RACK WT-1 PT-1FT-1FB-1 EXIT 34" CLEAR EXIT 34" CLEAR EXIT 34" CLEAR EXIT 34" CLEAR CADFILE: 24x36DRAWN BY: CHECKED BY:L I L I A N A R. T O B O NAIA, LEED AP, NCARBSCALE DATE: REV.A r c h i t e c t3512 PRESTO N TRAIL M ARTINEZ, G A 30907TEL (706) 288-8273LTO BO N@ THEPETESTO RE.CO M1/4/2022 12:38:19 PMC:\Users\Liliana Tobon\Dropbox (The Pete Store)\LILIANA'S FILES\The Pete Store- 28- Fort Pierce, FL\existing drawings\FortPierce, FL- Existing OPT2.rvt3/16" = 1'-0" Author Checker JAN 3, 2022 22-001 ID202 FLOORING PLANINTERIOR RENOVATIONPALM WAY INVESTMENTS, LLC5750 ORANGE AVENUE FORT PIERCE, FL 349473/16" = 1'-0"1 FLOORING NEW PORCELAIN TILE AND BASE BOARD NEW PORCELAIN TILE AND BASE BOARD REVDATEBYD E S C R I P T I O N