HomeMy WebLinkAboutAPPROVED Peterbilt Heat LoadPeterbilt Store
HVAC Load Analysis
for
Peterbilt Store
5750 Orange Ave.
Fort Pierce, Florida
Prepared By:
Eric J. Svoboda, PE
Fort Pierce Engineering, Inc.
315 South 7th Street
Fort Pierce, FL 34950
772-672-4636
Friday, November 5, 2021
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Fort Pierce Engineering Peterbilt Store
Fort Pierce, FL 34950 Page 2
General Project Data Input
General Project Information
Project file name:Peterbilt Heat Load.CH8
Project title:Peterbilt Store
Designed by:Eric J. Svoboda, PE
Project date:Monday, July 07, 2008
Weather reference city:FORT PIERCE, FLORIDA, USA
Client name:Peterbilt Store
Client address:5750 Orange Ave.
Client city:Fort Pierce, Florida
Company name:Fort Pierce Engineering, Inc.
Company representative:Eric J. Svoboda, PE
Company address:315 South 7th Street
Company city:Fort Pierce, FL 34950
Company phone:772-672-4636
Company fax:772-672-4637
Barometric pressure:29.894 in.Hg.
Altitude:25 feet
Latitude:27 Degrees
Mean daily temperature range:15 Degrees
Starting & ending time for HVAC load calculations:7am - 10pm
Number of unique rooms in this project:24
Building Default Values
Calculations performed:Both heating and cooling loads
Lighting requirements:1.50 Watts per square foot
Equipment requirements:1.00 Watts per square foot
People sensible load multiplier:250 Btuh per person
People latent load multiplier:200 Btuh per person
Room sensible safety factor:0 %
Room latent safety factor:0 %
Room heating safety factor:0 %
People diversity factor:100 %
Lighting profile number:0
Equipment profile number:0
People profile number:0
Building default ceiling height:10.00 feet
Building default wall height:10.00 feet
Internal Operating Load Profiles (C = 100)
hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
1 C C C C C C C C C C C C C C C C C C C C C C C C
2 C C C C C C C C C C C C C C C C C C C C C C C C
3 C C C C C C C C C C C C C C C C C C C C C C C C
4 C C C C C C C C C C C C C C C C C C C C C C C C
5 C C C C C C C C C C C C C C C C C C C C C C C C
6 C C C C C C C C C C C C C C C C C C C C C C C C
7 C C C C C C C C C C C C C C C C C C C C C C C C
8 C C C C C C C C C C C C C C C C C C C C C C C C
9 C C C C C C C C C C C C C C C C C C C C C C C C
10 C C C C C C C C C C C C C C C C C C C C C C C C
Z:\Ft Pierce Engineering\21 Projects\21027-01 Peterbilt Store\Calculations\HVAC\Peterbilt Heat Load.CH8 Friday, November 5, 2021, 05:33 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Fort Pierce Engineering Peterbilt Store
Fort Pierce, FL 34950 Page 3
General Project Data Input (cont'd)
Building-Level Design Conditions
Design
Month
Outdoor
Dry Bulb
Outdoor
Wet Bulb
Indoor
Rel.Hum
Indoor
Dry Bulb
Grains
Diff
In/Outdoor
Correction
August 95 80 50%75 66.33 6
Winter 42 75
Master Roofs
Roof
No.
ASHRAE
Roof#
Roof
U-Fac
Dark
Color
Susp.
Ceil
1 1 0.050 No No
Roof #1 Description: Metal Roof, R-20
Master Walls
Wall
No.
ASHRAE
Group
Wall
U-Fac
Wall
Color
1 C 0.095 L
Wall #1 Description: Block wall, 8" sand & gravel, hollow core, siding exterior, interior finish, 1" extruded poly, R-5.0
Master Partitions
Partition
No.
Partition
U-Factor
Cool
T-D
Heat
T-D
1 0.095 10 10
Partition #1 Description: Block partition, 8" sand & gravel, hollow core, siding exterior, interior finish, 1" extruded poly, R-
5.0
Master Glass
Glass
No.
Summer
U-Factor
Winter
U-Factor
Glass
Shd.Coef.
Interior
Shading
Interior
Shd.Coef
1 0.810 0.830 1.000 1 0.550
Glass #1 Description: Default Glass
Z:\Ft Pierce Engineering\21 Projects\21027-01 Peterbilt Store\Calculations\HVAC\Peterbilt Heat Load.CH8 Friday, November 5, 2021, 05:33 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Fort Pierce Engineering Peterbilt Store
Fort Pierce, FL 34950 Page 4
Building Summary Loads
Building peaks in August at 4pm.
Bldg Load
Descriptions
Area
Quan
Sen
Loss
%Tot
Loss
Lat
Gain
Sen
Gain
Net
Gain
%Net
Gain
Roof 4,011 6,618 13.34 0 8,085 8,085 5.58
Wall 1,768 5,543 11.17 0 2,906 2,906 2.01
Glass 362 9,915 19.98 0 26,986 26,986 18.64
Floor Slab 200 4,092 8.25 0 0 0 0.00
Skin Loads 26,168 52.73 0 37,977 37,977 26.23
Lighting 6,017 0 0.00 0 20,529 20,529 14.18
Equipment 6,031 0 0.00 0 20,579 20,579 14.21
Pool Latent 0 0 0.00 0 0 0 0.00
People 48 0 0.00 9,600 12,000 21,600 14.92
Partition 1,270 1,207 2.43 0 1,207 1,207 0.83
Cool. Pret.0 0 0.00 0 0 0 0.00
Heat. Pret.0 0 0.00 0 0 0 0.00
Cool. Vent.625 0 0.00 28,167 13,738 41,905 28.94
Heat. Vent.625 22,255 44.84 0 0 0 0.00
Cool. Infil.0 0 0.00 0 0 0 0.00
Heat. Infil.0 0 0.00 0 0 0 0.00
Draw-Thru Fan 0 0 0.00 0 987 987 0.68
Blow-Thru Fan 0 0 0.00 0 0 0 0.00
Reserve Cap.0 0 0.00 0 0 0 0.00
Reheat Cap.0 0 0.00 0 0 0 0.00
Supply Duct 0 0 0.00 0 0 0 0.00
Return Duct 0 0 0.00 0 0 0 0.00
Misc. Supply 0 0 0.00 0 0 0 0.00
Misc. Return 0 0 0.00 0 0 0 0.00
Building Totals 49,629 100.00 37,767 107,015 144,783 100.00
Building
Summary
Sen
Loss
%Tot
Loss
Lat
Gain
Sen
Gain
Net
Gain
%Net
Gain
Ventilation 22,255 44.84 28,167 13,738 41,905 28.94
Infiltration 0 0.00 0 0 0 0.00
Pretreated Air 0 0.00 0 0 0 0.00
Room Loads 27,375 55.16 9,600 92,291 101,891 70.38
Plenum Loads 0 0.00 0 0 0 0.00
Fan/Duct/Misc Loads 0 0.00 0 987 987 0.68
Building Totals 49,629 100.00 37,767 107,015 144,783 100.00
Check Figures
Total Building Supply Air (based on a 21° TD):4,123 CFM
Total Building Vent. Air (15.16% of Supply):625 CFM
Total Conditioned Air Space:4,011 Sq.ft
Supply Air Per Unit Area:1.0280 CFM/Sq.ft
Area Per Cooling Capacity:332.4 Sq.ft/Ton
Cooling Capacity Per Area:0.0030 Tons/Sq.ft
Heating Capacity Per Area:12.37 Btuh/Sq.ft
Total Heating Required With Outside Air:49,629 Btuh
Total Cooling Required With Outside Air:12.07 Tons
Z:\Ft Pierce Engineering\21 Projects\21027-01 Peterbilt Store\Calculations\HVAC\Peterbilt Heat Load.CH8 Friday, November 5, 2021, 05:33 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Fort Pierce Engineering Peterbilt Store
Fort Pierce, FL 34950 Page 5
Air Handler #1 - AHU 1 - Summary Loads
Rm
No
Description
Room Peak Time
Area
People
Volume
Htg.Loss
Htg.CFM
CFM/Sqft
Sen.Gain
Clg.CFM
CFM/Sqft
Lat.Gain
S.Exh
W.Exh
Htg.O.A.
Req.CFM
Act.CFM
Clg.O.A.
Req.CFM
Act.CFM
1 Office 1
1pm August
108
1
1,080
1,130
52
0.48
3,047
133
1.23
200
0
0
Direct
14
16
Direct
14
13
2 Office 2
1pm August
108
1
1,080
1,130
52
0.48
3,047
133
1.23
200
0
0
Direct
14
16
Direct
14
13
3 Office 3
4pm August
108
1
1,080
2,236
104
0.96
5,119
224
2.07
200
0
0
Direct
14
32
Direct
14
22
4 Office 4
4pm August
96
1
960
2,650
123
1.28
7,204
315
3.28
200
0
0
Direct
13
38
Direct
13
32
5 Driver's Lounge
2pm August
180
2
1,800
815
38
0.21
3,524
154
0.86
400
0
0
Direct
24
12
Direct
24
15
6 Office 6
2pm August
108
1
1,080
178
8
0.08
1,932
84
0.78
200
0
0
Direct
14
3
Direct
14
8
7 Hall
2pm August
112
1
1,120
392
18
0.16
2,149
94
0.84
200
0
0
Direct
15
6
Direct
15
9
8 Reception / Lobby
1pm August
520
6
5,200
3,814
177
0.34
13,902
608
1.17
1,200
0
0
Direct
68
54
Direct
68
61
Room Peak Totals:
Total Rooms: 8
Unique Rooms: 8
1,340
14
13,400
12,344
572
0.43
39,924
1,746
1.30
2,800
0
0
175
175
175
175
Z:\Ft Pierce Engineering\21 Projects\21027-01 Peterbilt Store\Calculations\HVAC\Peterbilt Heat Load.CH8 Friday, November 5, 2021, 05:33 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Fort Pierce Engineering Peterbilt Store
Fort Pierce, FL 34950 Page 6
Air Handler #1 - AHU 1 - Total Load Summary
Air Handler Description:AHU 1 Constant Volume - Proportion
Supply Air Fan:Draw-Thru with program estimated horsepower of 0.16 HP
Fan Input:0% motor and fan efficiency with 0 in. water across the fan
Sensible Heat Ratio:0.93 --- This system occurs 1 time(s) in the building. ---
Air System Peak Time:3pm in August.
Outdoor Conditions:Clg: 95° DB, 80° WB, 131.03 grains, Htg: 42° DB
Indoor Conditions:Clg: 75° DB, 50% RH, Htg: 75° DB
Summer: Ventilation controls outside air, ----- Winter: Ventilation controls outside air.
Room Space sensible loss:12,344 Btuh
Infiltration sensible loss:0 Btuh 0 CFM
Outside Air sensible loss: 6,231 Btuh 175 CFM
Supply Duct sensible loss:0 Btuh
Return Duct sensible loss:0 Btuh
Return Plenum sensible loss:0 Btuh
Total System sensible loss:18,576 Btuh
Heating Supply Air: 12,344 / (.999 X 1.08 X 20) =572 CFM
Winter Vent Outside Air (30.6% of supply) =175 CFM
Room space sensible gain:37,963 Btuh
Infiltration sensible gain:0 Btuh
Draw-thru fan sensible gain:418 Btuh
Supply duct sensible gain:0 Btuh
Reserve sensible gain:0 Btuh
Total sensible gain on supply side of coil:38,381 Btuh
Cooling Supply Air: 38,381 / (.999 X 1.1 X 20) =1,746 CFM
Summer Vent Outside Air (10.0% of supply) =175 CFM
Return duct sensible gain:0 Btuh
Return plenum sensible gain:0 Btuh
Outside air sensible gain:3,847 Btuh 175 CFM
Blow-thru fan sensible gain:0 Btuh
Total sensible gain on return side of coil:3,847 Btuh
Total sensible gain on air handling system:42,227 Btuh
Room space latent gain:2,800 Btuh
Infiltration latent gain:0 Btuh
Outside air latent gain:7,887 Btuh
Total latent gain on air handling system:10,687 Btuh
Total system sensible and latent gain:52,914 Btuh
Check Figures
Total Air Handler Supply Air (based on a 20° TD):1,746 CFM
Total Air Handler Vent. Air (10.02% of Supply):175 CFM
Total Conditioned Air Space:1,340 Sq.ft
Supply Air Per Unit Area:1.3031 CFM/Sq.ft
Area Per Cooling Capacity:303.9 Sq.ft/Ton
Cooling Capacity Per Area:0.0033 Tons/Sq.ft
Heating Capacity Per Area:13.86 Btuh/Sq.ft
Total Heating Required With Outside Air:18,576 Btuh
Total Cooling Required With Outside Air:4.41 Tons
Z:\Ft Pierce Engineering\21 Projects\21027-01 Peterbilt Store\Calculations\HVAC\Peterbilt Heat Load.CH8 Friday, November 5, 2021, 05:33 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Fort Pierce Engineering Peterbilt Store
Fort Pierce, FL 34950 Page 7
Air Handler #2 - AHU 2 - Summary Loads
Rm
No
Description
Room Peak Time
Area
People
Volume
Htg.Loss
Htg.CFM
CFM/Sqft
Sen.Gain
Clg.CFM
CFM/Sqft
Lat.Gain
S.Exh
W.Exh
Htg.O.A.
Req.CFM
Act.CFM
Clg.O.A.
Req.CFM
Act.CFM
9 Office 7
2pm August
108
1
1,080
264
12
0.11
1,499
62
0.57
200
0
0
Direct
16
7
Direct
16
13
10 Office 8
2pm August
120
1
1,200
293
14
0.11
1,638
68
0.57
200
0
0
Direct
17
7
Direct
17
14
11 Copy
2pm August
96
1
960
234
11
0.11
1,360
56
0.59
200
0
0
Direct
14
6
Direct
14
12
12 Conference
3pm August
132
6
1,320
944
44
0.33
3,293
136
1.03
1,200
0
0
Direct
19
24
Direct
19
28
13 Janitor
2pm August
20
0
200
33
2
0.08
215
9
0.45
0
0
0
Direct
3
1
Direct
3
2
14 I.T.
5pm August
32
1
320
675
31
0.98
815
34
1.06
200
0
0
Direct
5
17
Direct
5
7
15 Breakroom
1pm August
120
2
1,200
1,201
56
0.46
2,919
121
1.01
400
0
0
Direct
17
31
Direct
17
25
16 Men
3pm August
108
1
1,080
644
30
0.28
1,541
64
0.59
200
0
0
Direct
16
16
Direct
16
13
17 Women
3pm August
108
1
1,080
644
30
0.28
1,541
64
0.59
200
0
0
Direct
16
16
Direct
16
13
18 Hall
3pm August
190
2
1,900
935
43
0.23
2,810
116
0.61
400
0
0
Direct
28
24
Direct
28
24
Room Peak Totals:
Total Rooms: 10
Unique Rooms: 10
1,034
16
10,340
5,868
272
0.26
17,630
730
0.71
3,200
0
0
150
150
150
150
Z:\Ft Pierce Engineering\21 Projects\21027-01 Peterbilt Store\Calculations\HVAC\Peterbilt Heat Load.CH8 Friday, November 5, 2021, 05:33 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Fort Pierce Engineering Peterbilt Store
Fort Pierce, FL 34950 Page 8
Air Handler #2 - AHU 2 - Total Load Summary
Air Handler Description:AHU 2 Constant Volume - Proportion
Supply Air Fan:Draw-Thru with program estimated horsepower of 0.07 HP
Fan Input:0% motor and fan efficiency with 0 in. water across the fan
Sensible Heat Ratio:0.85 --- This system occurs 1 time(s) in the building. ---
Air System Peak Time:2pm in August.
Outdoor Conditions:Clg: 95° DB, 80° WB, 131.77 grains, Htg: 42° DB
Indoor Conditions:Clg: 75° DB, 50% RH, Htg: 75° DB
Summer: Ventilation controls outside air, ----- Winter: Ventilation controls outside air.
Room Space sensible loss:5,868 Btuh
Infiltration sensible loss:0 Btuh 0 CFM
Outside Air sensible loss: 5,341 Btuh 150 CFM
Supply Duct sensible loss:0 Btuh
Return Duct sensible loss:0 Btuh
Return Plenum sensible loss:0 Btuh
Total System sensible loss:11,209 Btuh
Heating Supply Air: 5,868 / (.999 X 1.08 X 20) =272 CFM
Winter Vent Outside Air (55.2% of supply) =150 CFM
Room space sensible gain:17,484 Btuh
Infiltration sensible gain:0 Btuh
Draw-thru fan sensible gain:175 Btuh
Supply duct sensible gain:0 Btuh
Reserve sensible gain:0 Btuh
Total sensible gain on supply side of coil:17,658 Btuh
Cooling Supply Air: 17,658 / (.999 X 1.1 X 22) =730 CFM
Summer Vent Outside Air (20.5% of supply) =150 CFM
Return duct sensible gain:0 Btuh
Return plenum sensible gain:0 Btuh
Outside air sensible gain:3,297 Btuh 150 CFM
Blow-thru fan sensible gain:0 Btuh
Total sensible gain on return side of coil:3,297 Btuh
Total sensible gain on air handling system:20,955 Btuh
Room space latent gain:3,200 Btuh
Infiltration latent gain:0 Btuh
Outside air latent gain:6,760 Btuh
Total latent gain on air handling system:9,960 Btuh
Total system sensible and latent gain:30,916 Btuh
Check Figures
Total Air Handler Supply Air (based on a 22° TD):730 CFM
Total Air Handler Vent. Air (20.54% of Supply):150 CFM
Total Conditioned Air Space:1,034 Sq.ft
Supply Air Per Unit Area:0.7063 CFM/Sq.ft
Area Per Cooling Capacity:401.4 Sq.ft/Ton
Cooling Capacity Per Area:0.0025 Tons/Sq.ft
Heating Capacity Per Area:10.84 Btuh/Sq.ft
Total Heating Required With Outside Air:11,209 Btuh
Total Cooling Required With Outside Air:2.58 Tons
Z:\Ft Pierce Engineering\21 Projects\21027-01 Peterbilt Store\Calculations\HVAC\Peterbilt Heat Load.CH8 Friday, November 5, 2021, 05:33 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Fort Pierce Engineering Peterbilt Store
Fort Pierce, FL 34950 Page 9
Air Handler #3 - AHU 3 - Summary Loads
Rm
No
Description
Room Peak Time
Area
People
Volume
Htg.Loss
Htg.CFM
CFM/Sqft
Sen.Gain
Clg.CFM
CFM/Sqft
Lat.Gain
S.Exh
W.Exh
Htg.O.A.
Req.CFM
Act.CFM
Clg.O.A.
Req.CFM
Act.CFM
19
Showroom / Parts /
Service
4pm August
1,010
10
10,100
4,833
224
0.22
22,562
986
0.98
2,000
0
0
Direct
185
158
Direct
185
180
20 Parts Manager
4pm August
99
1
990
1,315
61
0.62
4,181
183
1.85
200
0
0
Direct
18
43
Direct
18
33
21 Service Manager
4pm August
112
1
1,120
1,492
69
0.62
4,362
191
1.70
200
0
0
Direct
21
49
Direct
21
35
22 Tech's
2pm August
143
2
1,430
464
21
0.15
2,268
99
0.69
400
0
0
Direct
26
15
Direct
26
18
23 Tech's Breakroom
2pm August
117
2
1,170
279
13
0.11
1,846
81
0.69
400
0
0
Direct
21
9
Direct
21
15
24 Tech's RR
3pm August
156
2
1,560
779
36
0.23
2,462
108
0.69
400
0
0
Direct
29
26
Direct
29
20
Room Peak Totals:
Total Rooms: 6
Unique Rooms: 6
1,637
18
16,370
9,162
425
0.26
37,681
1,647
1.01
3,600
0
0
300
300
300
300
Z:\Ft Pierce Engineering\21 Projects\21027-01 Peterbilt Store\Calculations\HVAC\Peterbilt Heat Load.CH8 Friday, November 5, 2021, 05:33 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Fort Pierce Engineering Peterbilt Store
Fort Pierce, FL 34950 Page 10
Air Handler #3 - AHU 3 - Total Load Summary
Air Handler Description:AHU 3 Constant Volume - Proportion
Supply Air Fan:Draw-Thru with program estimated horsepower of 0.16 HP
Fan Input:0% motor and fan efficiency with 0 in. water across the fan
Sensible Heat Ratio:0.91 --- This system occurs 1 time(s) in the building. ---
Air System Peak Time:4pm in August.
Outdoor Conditions:Clg: 95° DB, 80° WB, 131.77 grains, Htg: 42° DB
Indoor Conditions:Clg: 75° DB, 50% RH, Htg: 75° DB
Summer: Ventilation controls outside air, ----- Winter: Ventilation controls outside air.
Room Space sensible loss:9,162 Btuh
Infiltration sensible loss:0 Btuh 0 CFM
Outside Air sensible loss: 10,682 Btuh 300 CFM
Supply Duct sensible loss:0 Btuh
Return Duct sensible loss:0 Btuh
Return Plenum sensible loss:0 Btuh
Total System sensible loss:19,844 Btuh
Heating Supply Air: 9,162 / (.999 X 1.08 X 20) =425 CFM
Winter Vent Outside Air (70.7% of supply) =300 CFM
Room space sensible gain:37,612 Btuh
Infiltration sensible gain:0 Btuh
Draw-thru fan sensible gain:394 Btuh
Supply duct sensible gain:0 Btuh
Reserve sensible gain:0 Btuh
Total sensible gain on supply side of coil:38,006 Btuh
Cooling Supply Air: 38,006 / (.999 X 1.1 X 21) =1,647 CFM
Summer Vent Outside Air (18.2% of supply) =300 CFM
Return duct sensible gain:0 Btuh
Return plenum sensible gain:0 Btuh
Outside air sensible gain:6,594 Btuh 300 CFM
Blow-thru fan sensible gain:0 Btuh
Total sensible gain on return side of coil:6,594 Btuh
Total sensible gain on air handling system:44,600 Btuh
Room space latent gain:3,600 Btuh
Infiltration latent gain:0 Btuh
Outside air latent gain:13,520 Btuh
Total latent gain on air handling system:17,120 Btuh
Total system sensible and latent gain:61,720 Btuh
Check Figures
Total Air Handler Supply Air (based on a 21° TD):1,647 CFM
Total Air Handler Vent. Air (18.22% of Supply):300 CFM
Total Conditioned Air Space:1,637 Sq.ft
Supply Air Per Unit Area:1.0059 CFM/Sq.ft
Area Per Cooling Capacity:318.3 Sq.ft/Ton
Cooling Capacity Per Area:0.0031 Tons/Sq.ft
Heating Capacity Per Area:12.12 Btuh/Sq.ft
Total Heating Required With Outside Air:19,844 Btuh
Total Cooling Required With Outside Air:5.14 Tons
Z:\Ft Pierce Engineering\21 Projects\21027-01 Peterbilt Store\Calculations\HVAC\Peterbilt Heat Load.CH8 Friday, November 5, 2021, 05:33 PM