HomeMy WebLinkAboutFBC Energy Conservation Code 7-30-18Planning & Development Services
Building & Code Regulation Division
2300 Virginia Ave, Rm 201
Fort Pierce, FL 34982
772462-2165 Fax 772-462-6443
FBC ENERGY CONSERVATION CODE
Duct Sealing Certification
Prescriptive and Performance Method
17�N
RECEIVED
J;_i'L 3 0 2018
5T. Lucie bounty, Permitting
Date: O "?�3 C) �' Permit #: I /, I2 � c. Q' Lot #: i Z�
Contractor. DR 1 Address: qL4L4y 0 6 6(ec-- 4-0 n.a_ Z> r.
�� r-:4-
Construction: 'yPost Construction Test ❑ Rough -in Test /
Test Conditions:
Date: 0O Floor Area (ft2): '7 2—
Time: - 4145 Primary Location of Supply Ductwork Gt. c—
Indoor Temperature (F): `7& Primary Location of Return Ductwork
Outdoor Temperature (F): $�—
Total Leakage Test (Outside)
Duct Leakage: ❑ Default ❑ Prop. Leak Free 'Proposed On =
Test Pressure: 2 6 (Pa)
Baseline Duct Pressure (optional) (Pa)
Duct Press. (Pa) Flow Ring Fan Press Flow (cfm) Results: kPass ❑ Fail
Installed Pa
�' Total Leakage (cfm): `f
Total Leakage per 100 sgft ®
CFM25 x 100 divided by the CFA = Duct Leakage CFM/100 sgtt.
Testing Company p _
Company Name: +�! �'�G- Address:
I hereby certify that the above Duct S aling Leakage re ul demonstrate compliance with 5s' Edition FBC Energy Conservation requirements in accordance with
Section R403.2.2
Signature: n
Printed Name: 1W,0-r4 rn License/Certificate #-