HomeMy WebLinkAboutField Density Test Compaction SoilRECEIVED Phone 954-784-2941 ede r�-a ��� 04 zas 800-848-1919 aermitt/n Fax 954-784-7875 8 TESTING INC. St' �u9e CopntyentLA www.fed-eng.com 250 SW 13th Ave Pompano Beach, FL 33069 Field Density Tests of Compacted Soils.Method D-6938 Project: Proposed Residence Lot 74, Creekside Date: June 21, 2018 Address: 3044 Woodswalk Drive, .Fort Pierce, FL Order #: 18DR545 Area Tested: Building Pad Permit #: 1 z'25611 Material Type: Pale Brown Sand with Traces•of Shell Tech: BK Client: D.R. Horton, Inc.. Address: 1430 Culver Drive NE Compaction Req.: 95% Palm Bay, FL 32907 Proctor Method: ASTM D-1557 Test # TEST LOCATION Probe Depth Elev. Moist % Dry Density PCF Proctor Value PCF Optimum Moisture % Compaction Pass 1 Center of Building Pad 12" FL 6.0 106.5 109.0 .14.0 97.7% Yes 2 INE Corner of Building Pad 12 FL 6.8 106.9 109.0 14.0 98.1% Yes 3 SW Corner of Building Pad 12" FL 6.3 108.5 109.0 14.0 99.5% Yes 4 5 6 7 8 9 10 11 • 12 • 13 14 Remarks: See Reverse Side (Page 2 9MIPI tiSt�ht�M&WO %laimer This is a Comaaction Test Av I&SW W17-of the offid AM is of a verification of Legend for Elevation: 0 9 �,Q�a PR = Proofroll 1,2,3 = 1st, 2nd, 3rd Lift ,uL Su i by: SL = Springline FL = Final Lift. KeitFrLeBlanc, P.E. G�Z Z SG = Subgrade BG = Below Grade Federal Engineering'&Testing, Inc. BC = Basecourse BOF= Bottom of Footing Florida Reg. No. 59394 TOP = Top of Pipe FG = Finished Grade BY• Certificate ofAuthedzation #5471 As a mutual protection to clients, the public and ourselves, all reports are submitted as the c de tial property of clients, and authorization for publication of statements, conclusions or extracts from or regarding our reports Is reserved pending o e v si test determines the.degreo of compaction ofahe tested layer of material only. A density does not replace a soil bearing capacity detenni fo s tot the underlying soil materials below ttie_proposed structure. The results do not preclude or guarantee that future settlement and crackin cur flA ring test is required to certify that the urid3ri ding foils"v�ill sLpport the proposed structure without settlement. If no soil borings have been performed to veFlfy tTT underlying soils, we recommend that soil borings be performed to evaluate the suitability of the underlying soil to support the proposed structure. After laying dormant for a period of 90 days or after heavy rain/storms, retesting must be performed'on this work. PAGE 1 of 2 i Compacted Soils Method D-6938 Disclaimer Pursuant to your request, Federal Engineering & Testing,. Inc. (FET) has performed a. compaction test at the referenced project on the reverse side. The purpose of our test was to determine the degree of compaction of the tested layer of material only. In no way shall a compaction�-test replace a soil bearing capacity determination. A soil boring test must be performed by the client prior to construction ,to verify subsoil conditions. Our scope of services only included testing the top 12" of added fill material. FET was not contracted to perform supervision of the building pad preparation. This testing of the added fill material does not include an analysis of the underlying soil materials to determine if they are capable of supporting the proposed structure without settlement. This density compaction test does not warranty any underlying soil materials or conditions below the tested top 12 inches of material. If no soil borings -have been performed in.the location of the proposed structure, we recommend performing soil borings below all foundation areas of the proposed structure to verify the underlying soil conditions. Environmental analysis of the soil materials is not part of the scope of services. If environmental analysis of the soils is required, we can provide a proposal for performing an environmental analysis of the soil materials. The scope of services is for determination of the degree of compaction of the tested layer of material only. No other analysis is implied or warranted. Job project specifications were not available at the time the work was performed. Determination of the pass/fail compaction results are based on current common industry requirements of 95% of the ASTM D-1557 standard for building foundations and 98% of the AASHTO T-180 standard for paved areas such as roadways and parking lots. If different specifications are required, Federal Engineering & Testing,lnc. shall be notified. Our findings are relative to the date and areas of our site work and should not be relied upon to represent conditions on other areas or dates. Any subsequent site disturbances due to water erosion, rain waters, construction activities, excavations, overgrown, vegetation, traffic and other disturbances will void this test and the site must be re -compacted and re,tested prior to construction. As a mutual protection to clients, the public and ourselves, all reports are submitted are the confidential property of clients and authorization for use, publication! of statements, conclusions or extracts from or regarding our reports is reserved pending written approval. It has been a pleasure working with you and we look forward to doing so in the,near future. Page 2 of 2 Phone � e e0 954-784-2941 edlera �'o �,8 80.0-848-1919 o e~-1 Fax 954-784-7875 ' S TESTIPIti INC. �5�9 wlllw.fed-eng.com 250 SW 13th Ave Pompano Beach, FL 33060 Field Density Tests of Compacted Soils Method D-6938 Project: Proposed Residence Lot 74, Creekside Date: June 21, 2018 Address: 3044 Woodswalk Drive, Fort Pierce, FL Order #: 18DR545 Area Tested: Building Pad Permit #: 17tz — 00 Material Type: Pale Brown Sand with Traces of Shell Tech: BK Client: D.R. Horton, Inc. Address: 1430 Culver Drive NE Compaction Req.: 95% Palm Bay, FL 32907 Proctor Method: ASTM D-1557 Test # TEST LOCATION Probe Depth Elev. Moist ova Dry Density PCF Proctor Value PCF Optimum Moisture % Compaction Pass 1 Center of Building Pad 12" FL 6.0 106.5 109.0 14.0 97.7% Yes 2 NE Corner of Building Pad 12" FL 6.8 106.9 109.0 14.0 98.1 % Yes 3 SW Comer of Building Pad 12" FL 6.3 108.5 109.0 14.0 99.5% Yes 4 5 2p1� 6 2 7 8 9 10 • 11 12 13 14 `e•��1�llill6,i�l7i . Remarks: of 2) for This is a Compaction Test only on the top 12": of the pad and is not a verification of S il$eaNryg C acity. Legend for Elevation: ,/ = ; 9394 ; PR = Proofroll 1,2,3 = ist, 2nd, 3rd. Lift Submitted by:- SL = Sprin line FL = Final Lift Keith LeBlanc, P.� S SG = Sub grade BG = Below Grade APPROVE) Federal En tneerirf" & nc ! g g' g ��tir�g1 Inc. (v .� BC = Basecourse BOF = Bottom of Footing Florida Reg. No. 593 cP c%Rip_ �,,�' TOP = Top of Pipe FG = Finished Grade Certificate of AuthorizedYQ S ,' As a mutual protection to clients, the public and ourselves,. all reports are submitted as the confidential roe of clients, and authorizati'qRfp�ements, P P P P P rtY ��ijcd f 4� conclusions or extracts from or regarding our reports is reserved pending our written approval. A density test determines the degree of compaction of the to to ayer of material only. A density does not replace a soil bearing capacity determination. These density tests do not certify the underlying soil materials below the proposed structure. The results do not preclude or guarantee that future settlement and cracking will not occur. A soil boring testis required to certify that the underlying soils will support the proposed structure without settlement. if no soil borings have been performed to verify the underlying soils, we recommend that soil borings be performed to evaluate the suitability of the underlying soil to support the proposed structure. After laying dormant for a period of 90 days or after heavy raintstorms, retesting must be performed on this work. PAGE 1 of 2