Loading...
HomeMy WebLinkAboutField Density Test Compacted Soiledetal & TESTING INC. 250 SIN 13th Ave Pompano Beach, Fl. 33069 Field Density Tests of RECEIVED I Phone 954-784-2941" 800-848-1919 JUL 2 0 7010 Fax 954.784.7875 www.fed-eng.com Permitting Department iDacted Soils Method D-6938 Project: Proposed Residence Lot 128, Creekside Date: July 10, 2018 Address: 8428 Cobblestone Drive, Fort Pierce, FL Order #: 18DR615 Area Tested: Building Pad Permit #: _ ®U , 7 Material Type: Light Brown Sand with Some Shell Tech: TS Client: D.R. Horton, Inc. Address: 1430 Culver Drive NE Compaction Req.: 95% Palm Bay, FL 32907 Proctor Method: ASTM D-1557 Test # TEST LOCATION Probe Depth p Elev. Moist % Dry Density PCF Proctor Value PCF Optimum Moisture % Compaction Pass 1 NE Corner of Building Pad 12" FL 11.7 109.2 110.0 12.0 99.3% Yes 2 1 Center of Building Pad 12" 1 FL 12.2 114.4 110.0 12.0 104.0% Yes 3 ISW Corner of Building Pad 12" FL 12.6 113.2 110.0 12.0 102.9% Yes 4 5 6 7 8 9 10 11 12 13 14 Remarks: See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer This is a Compaction Test only on the top 12" of the Pad and Is not a verification of Legend for Elevation: &I'l PR = Proofroll 1,2,3 = 1st, 2nd, 3rd Lift Submitted by: , SL = Springline FL = Final Lift Keith LeBlartEP? O SG = Subgrade BG = Below Grade Federal En eMidg & Testin BC = Basecourse BOF = Bottom of Footing Florida Reg=(I P5 3945,', TOP = Top of Pipe FG = Finished Grade Certificate off%-,ization As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, an for t conclusions or extracts from or regarding our reports is reserved pending our written approval. A density test determines the degree � ati A only. A density does not replace a soil bearing capacity determination. These density tests do not certify the underlying soil materialsgwfppd do not preclude or guarantee that future settlement and cracking will not occur. A soil boring testis required to certify that the underlying §op !r without settlement. If no soil borings have been performed to verify the underlying soils, we recommend that soil borings be performed to eva eAt9d9 soil to support the proposed structure. After laying dormant for a period of 90 days or after heavy rain/storms, retesting must be performed on this work. s Bd a- 0 1-% a results Had structure the underlying PAGE 1 of 2