HomeMy WebLinkAboutFBC Energy Conservation CodePlann'i,�; & Development Services; Building& Code Regulation Division
LW �U?.w
2300 Virginia Ave, Rm 201; Fort Pierce, FL 34982
• 772-462-2165 Fax 772-462-6443
FBC ENERGY CONSERVATION CODE 11402.4. RECEIVED
House Infiltration Test (Blower Door) Certification
Prescriptive and Performance Method DEC
Date: c 2 (3 Permit #: /7/ 2--Z) 64 ST. Lucfe County, Permitting
Contractor: p6z tH ortbo
Job Address: 52 6- &r.-,e c� T;, ;
Construction: ()C) New Construction — Complete ( ) Existing —After Addition
HouseInfiltrationiltratioiDTestResults SLC Climate Zone 2 12���% J ��
CFM 50 = i , o`fTest Date:
Volume G -371
ACH (50) = CFM (50) x 60 / Volume = I -��c Mechanical Ventilation required less than 3 ACH
Passing results must be & ACH (50) or less ()4 Pass ( ) Fail
FBC, Energy
R402.4.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate of not
exceeding 7 air changes per hour in Climate Zone 1, 2 and 3 air changes per hour in Climate Zones 3 through 8. Texting
shall be conducted with a blower door at a pressure of 0.2 inches w. g. (50 Pascals). Testing shall be conducted by either
individuals as defined in Section 553.993(5) or (7), Florida Statutes or individuals licensed as set forth in Section 489.105
(3)(f), (g) or (i) or an approved third party. A written report of the results of the test shall be signed by the party
conducting the test and provided to the code official. Testing shall be performed at any time after creation of all
penetrations of the building thermal envelope.
FBC, Residential
R303.4 Mechanical ventilation. Where the air infiltration rate of a dwelling unit is less than 3 air changes per hour when
tested with a blower door at a pressure of 0.2 inch w. c. (50 Pa) in accordance with Section R402.4.1.2 of the Florida
Building Code, Energy Conservation the dwelling unit shall be provided with whole -house mechanical ventilation in
accordance with Section M1507.3.
Testing Company
Company Name:
I hereby certify t the abo
requirements' accorda e
Signature:
Printed Na,
(4176y"c u4e- g A suiie %G
Address: 'S9¢�cs11T/ 32�ts
House Infiltration results demonstrate compliance with FBC Energy Conservation
with Section R402.4.1.2 Climate Zone 2.
License/Certification #: V 7 `jW K
Planning & Development Services
;1,=`3uilding & Code Regulation Division
2300 Virginia Ave, Rm 201
Fort Pierce, FL 34982
772-462-2165 Fax 772-462-6443
FBC ENERGY CONSERVATION CODE
Duct Sealing Certification
Prescriptive and Performance Method
Date: 12 1 a Permit #: _
Contractor: R orfio h
10_-m/(Z>3
RECEIVED
DEC 17 2018
ST. Welt 80HOt , 6''OFlTilUM0
Lot #: ) �2.2
Address: 8g52 L11 IVs+D,7e dr f ¢ �P, Ptie- F! 3r 45
Construction: t Post Construction Test ❑ Rough -in Test
Test Conditions:
Date: ft2 �� (� Floor Area (ft2): 19 6 cf
Time: / Primary Location of Supply Ductwork A,141
Indoor Temperature (F): Primary Location of Return Ductwork ! +- (.
Outdoor Temperature (F):
Total Leakage Test (Outside) . �Y
Duct Leakage: _� fault ❑ Prop. Leak Free iyProposed On = a
Test Pressure: (Pa )
Baseline Duct Pressure (optional) , IA (Pa)
Duct Press. (Pa) Flow Ring Fan Press Flow (cfm) Results: )rPass ❑ Fail
Installed Pa �5 J
%S' I Total Leakage (cfm):
Total Leakage per 100 sgft:
CFM25 x 100 divided by the CFA = Duct Leakage CFM/100 sqft.
Testing Company
q S Tor d? ryrnc Sryvorc GW A S'ulie 41115
Company Name: S%ye4er. Address: - —SY ickso»vil le T- L 3.2aaS
I hereby c that the a ove Duct Sealing Leakage results demonstrate compliance with 5th Edition FBC Energy Conservation requirements in accordance with
W k
Printed Name: V �l�l P3 t�Y License/Certificate #: