Loading...
HomeMy WebLinkAboutCertificate Of Termite TreatmentPlanning & Development Services Building & Code Regulation Division 2300 Virginia Ave Fort Pierce, FL 34982 772-462-2172 Fax 772-462-6443 CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT PERMIT #: 1 '7 IO — 0 71 JOB ADDRESS: Y40 ? rf e- jet-, BUILDER/CONTRACTOR: / lie r� _e-1 JS C0.10lW� PEST CONTROL CONTRACTOR: EVICT -A -BUG TERMITE & PEST CONTROL INC. PEST CONTROL LICENSE #: JB175775 We, the undersigned, hereby certify that we have pretreated the above described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet if area treated: 3 !�r' 6 r� Percentage of solution:.05% Date of Treatment: 3 Ll Footing 1st Treatment Re -Treat Driveway 1st Treatment Re -Treat Other 1st Treatment Re -Treat Chemicals used: DOMINION 2L Total gallons used: 360 Time of Treatment: f.100 lab 1st Treatment Re -Treat Pools 11t Treatment Re -Treat Perimeter for Final I Pction *nature of Exter nator Date Note: There must be a completed form for each required treatment or re -treatment and this form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection w111 fall and a re inspection . fee charged. FBC104.2.6 Certificate of Protective Treatment for prevention of termites A weather resistant jobslte posting board shall be provided to receive duplicate Treatment CertJflcates as each required protective treatment is completed, providing a copy for the person the permit is Issued to and another copy for the building permit flies The Treatment Certificate shall provide the product used, Identity of the applicator, time and date of the treatment, site location, area treated, chemical used, percent concentratlon and number of gallons used, to establish a venflable record of protective treatment. If the soil chemical barrier method for termite, prevention is used, final exterlor treatment shall be completed prior to final building approval. : St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on the electrical panel box'cover, listing all the treatments and dates of applications. Revised 7/24/2014