Loading...
HomeMy WebLinkAboutCertificate Of Termite Treatment 4-16-18i Planning & Development Services Building & Code (Regulation Division 2300 Virginia Ave LIM :ICOUNTYFort Pierce, FL 34982 772-462-2172 Fax 772-462.6443 CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT PERMIT #: t-- �(' JOB ADDRESS: 1 &y�'S2 BUILDER/CONTRACTOR: i- PEST CONTROL CONTRACTOR: EVICT -A -BUG TERMITE & PEST CONTROL INC. PEST CONTROL LICENSE #: JB1757F5 ion We, the undersigned, hereby certify that we have lards of the National Pestretreated the above rControibed �gssociat onor subterranean termites in accordance with the s Square feet if area treated: L 02 Percentage of solution: •05°1° Date of Treatment: ZS Footing 1st Treatment Re -Treat Driveway Ist Treatment Re -Treat Other Ist Treatment Re -Treat Chemicals used: DOMINION 2L Total gallons used: '� d Time of Treatment: Slab _Ist Treatment Re -Treat Pools ist Treatment Re -Treat Perimeter for Final Inspection Signs of Exterminator Date must on the job Note: There must be a hinspectorted orm at tior each required treatment or re -treatment and me of each inspectlon or the scheduled Inspectionjwl�fall and ar a inspection site to be picked up by the fee charged. F8C104.2.6 Certificate of protective Treatment for prevention of termites A weather resistant jobsite posting board shall be provided to receive duplicate Treatment Certificates as each required protective treatment Is complThe Tettad, provlding a copy for the person the permit /s issued to and another copy for the bullding permit filment Certlflcate shall provide the product used, Identity of the appllcator, time and date of the treatment, site location, area adon and number of used, to establish a verifiable record of treated, chemical used, percent cnncentr protective treatment. If the soil chemical barrier method for termite prevention /s used, final exterior treatment shall be completed prior to final building approval. St Lucie County requires for the final Inspection for C®, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications. Rcriacd 7/24/2014