HomeMy WebLinkAboutFoundation PlanArchitectonic Inc
Josh Sorensen Future Garage Foundation
Ft. Pierce, Florida
r �f
2014 Florida Building Code
160 MPH, Exposure•"B" Risk Cat 1
�— r
N�REp�1R�D
l
S7. LUCIE COON
BUILDING DIVISION
REVIEWED
FOR COMPLI
I REVIEWED BY
DATE d !-O
PLANS AND PER IT
1 MUST BE KEPT ON OB OR
NO INSPECTION WIL4 BE MADE
f'1
5 -- I
(7
- W...A r , r II00 s'E3 I,�iIa
® s ARE SUBJECT TO ANY COPREC T ICmS
fILCUIria0 By Fir1.0 IN ECTORS THAT
a.. NIAY BE NECESSARY IN Ofln-in TO
d S CO ,'MY WITH ALL AI'PLI"AE E CODES.
Foundation Schedule:
S-� 4" (2500 PSI) poured concrete slab with fibermesh reinforcing on
.006" vapor barrier over clean compacted treated fill.
F-1, 16" Deep x 20" Wide Monolithic footing with 3 # 5 bars continuous.
806 Delaware Avenue Tel: 772 460 7751 www..architectonicinc.com
Fort Pierce, Florida 34950 Fax: 772 460 4244 FL Reg #AA26003348
1of1