HomeMy WebLinkAboutEnvelope LeakageEnvelope Leakage Test Report (Blower Door Test)
Residential Prescriptive, Performance or ERI Method Compliance
2017 Florida Building Code, Energy Conservation, 6th Edition
®
jurisdiction: Permit #: / N CMg,3 / — ��'Z4 0
Job Informationx
Builder: or,,, Community: Lot:
Address: L/gd'G�WWAV
Unit:
City: Fov� t VC2- State:FL Zip: 3 LIqVq
Air Leakage Test Results Passing results must meet either the Performance, Prescriptive, or ERI Method.
OPRESCRIPTIVE METHOD -The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air
changes per hour at a pressure of 0.2 inch w.g. (50 pascals) in Climate Zones 1 and 2.
PERFORMANCE or ERI METHOD- The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding
the selected ACH(50) value, as shown on FORM R405-2017 (Performance) or R406-2017 (ERI), section labeled as Infiltration, sub -section ACH.
ACH(50) specified on form R405-20 7 7-Energy Calc (Performance) or R406-2017 (ERI); .O
33 l X 60 = k`1-1,q0- _ Method for calculatinE 6uildinevolume_
CFM(50) Building Volume ACH(5O) O Retrieved from architectural plans
J(PASS ❑FAIL i�Code software calculated
When ACH(50) is less than 3, Mechanical Ventilation O Field measured and calculated
installation must be verified by building department.
Testing. Testing shall be conducted in accordance with ANSYRESNETACC 380 and reported at a pressure or 0.2 inche w.g. (50 Pascals). Testing
shall be conducted by either individuals as defined in Section 553.993(5) or (7), Rorlda Statues, or individuals licensed as set forth in Section
489.105(3Hf), (g), or V) or an approved third party. A written report of the results of the test shall be signed by the party conducting the test and
provided to the code official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope.
During testing:
1.Exteriorwindows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the Intended weatherstripping or other Infiltration
control measures.
2.Dampers including exhaust, intake, makeup air, back draft and flue dampers shall be closed, but not sealed beyond intended infiltration control
measures.
3,Interior doors, if installed at the time of the test, shall be open.
4.Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed.
S.Heating and cooling systems, if installed at the time of the test, shall be turned off.
6.Supply and return registers, if installed at the time of the test, shall be fully open.
Testing Company
Company Name: Universal Engineering Sciences, LLC Phone: (772)-924-3575
1 hereby verify that the above Air Leakage results are in accordance with the 2017 6th Edition Florida Building Code Energy
Conservation requirements according to the compliance method selected above.
Z jZG ZZ
Signature of Tester: GncA Date of Test: \\0/
Printed Name of Tester: Marioangel Barajas
License/Certification #: 5067764 Issuing Authority: BPI