Loading...
HomeMy WebLinkAboutLetter- InspectionsKMA February 17, 2022 KMA Engineering & Surveying, LLC 80 Royal Palm Pointe, Suite 401 Vero Beach, FL 32960 (772)569-5505 St Lucie County Planning and Development Services Building Division 2300 Virginia Avenue Fort Pierce, FL 34982 RE: AcquaVista Lot 7 - 4446 N. Hwy Al To Whom It May Concern: �Peritit�NQ �1,9.0`��.054'4 We have conducted numerous inspections at the above referenced structure, and have found several issues related to the structural integrity of the residence. We have coordinated with the contractor to remedy these concerns, culminating in an extensive repairs specification package (available upon request). We have inspected the application of these repair specifications at various steps of their implementation and have found the repairs adequately applied. Specifically, we do hereby certify that: • We inspected and reviewed all non -engineered concrete beam penetrations. Many of these instances we found to be non -problematic. For those where we had determined the beam to be compromised, we had directed the contractor to add ancillary steel support members. We have inspected all the prescribed installations, and have found them in keeping with the design specifications. • We have inspected and reviewed all potential structural compromises to the structural shear -walls (ad hoc flood vent installations). We have directed the contractor to re -locate the flood vents to non-structural locations and repair the shear -wall. We have inspected the prescribed repairs the shear -wall and have found them in keeping with our design specifications. • We have witnessed several instances of exposed steel reinforcement throughout the structure. We have instructed the contractor in the required method and materials to repair and patch such exposures. We have inspected the prescribed patch -work, and have found it in keeping with the design and manufacturer specifications. • We have provided the contractor with a means to increase the frangibility of the exterior stairways without critical compromise to their stability. We have inspected this modification, and have found it in keeping with our instructions. It is our determination that these steps are frangible (break -away) in accordance with FBC, FDEP, and FEMA guidelines. If you have any questions please do not hesitate to contact me. David S. Knig t, P.E. FL Reg. No. 41060 FEB 1 7 2022