HomeMy WebLinkAboutFBC Energy Conservation CodePlanning & Development Services
Building & Code Regulation Division
2300 Virginia Ave, Rm 201
Fort Pierce, FL 34982
772-462-2165 Fax 772-462-6443 RECS1/Ep
-- — „- FBC ENERGY CONSERVATION CODE �U
Duct Sealing Certification N 201p
Prescriptive and Performance Method Permitting Depa
��� �7! � />� St. Lucie CountyBlf!
Date: /o�I/ Permit #: C L G 1 !� (/ -Z--� , /I Lot #:
Contractor: �;\ 12� Address: d� 1;2 (
Construction: �&st Construction Test ❑ Rough -in Test
Test Conditions:
Date: Floor Area (ft2):
Time: Primary Location of Supply Ductwork <
Indoor Temperature (F): Primary Location of Return Ductwork
Outdoor Temperature (F):
Total Leakage Test (Outside) +
Duct Leakage: ❑ Default ❑ Prop. Leak Free
oposed On =
Test Pressure: ® -� o (Pa)
Baseline Duct Pressure (optional) (Pa)
Duct Press. (Pa) Flow Ring Fan Press Flow (cfm) Results: �?%ZcLr-ss ❑ Fail
Installed Pa�1,
0 ( Total Leakage (cfm): L
v Total Leakage per 100 sgft:
CFM25 x 100 divided by the CFA = Duct Leakage CFM/100 sqft.
Testina Comoan
Company Name: S ( _\,t e+ f C Address:
I hereby certify that the above Duct Sealing Leakage results demonstrate compliance with 5"h Edition FBC Energy Conservation requirements in accordance with
Section R403.2.2. _ a _
Signature:
�;�
Printed Name:-`"�'�c- License/Certificate #: ���