Loading...
HomeMy WebLinkAboutFBC Energy Conservation CodePlanning & Development Services Building & Code Regulation Division 2300 Virginia Ave, Rm 201 Fort Pierce, FL 34982 772-462-2165 Fax 772-462-6443 RECS1/Ep -- — „- FBC ENERGY CONSERVATION CODE �U Duct Sealing Certification N 201p Prescriptive and Performance Method Permitting Depa ��� �7! � />� St. Lucie CountyBlf! Date: /o�I/ Permit #: C L G 1 !� (/ -Z--� , /I Lot #: Contractor: �;\ 12� Address: d� 1;2 ( Construction: �&st Construction Test ❑ Rough -in Test Test Conditions: Date: Floor Area (ft2): Time: Primary Location of Supply Ductwork < Indoor Temperature (F): Primary Location of Return Ductwork Outdoor Temperature (F): Total Leakage Test (Outside) + Duct Leakage: ❑ Default ❑ Prop. Leak Free oposed On = Test Pressure: ® -� o (Pa) Baseline Duct Pressure (optional) (Pa) Duct Press. (Pa) Flow Ring Fan Press Flow (cfm) Results: �?%ZcLr-ss ❑ Fail Installed Pa�1, 0 ( Total Leakage (cfm): L v Total Leakage per 100 sgft: CFM25 x 100 divided by the CFA = Duct Leakage CFM/100 sqft. Testina Comoan Company Name: S ( _\,t e+ f C Address: I hereby certify that the above Duct Sealing Leakage results demonstrate compliance with 5"h Edition FBC Energy Conservation requirements in accordance with Section R403.2.2. _ a _ Signature: �;� Printed Name:-`"�'�c- License/Certificate #: ���