Loading...
HomeMy WebLinkAboutBuilding Permit�N Code om liance Dlvi ion 2 0 ma F ce, FL 8 Phone: (772 2) N,48ED hftp://stfucieco.gov/ce Issued: 02/25/2008 Conf #; 682 BUILDING PERMIT PERMIT Permit #: SLC- 0802-0283 Page 1 Job Location: 2023 ST LUCIE BLV 313 City: FORT PIERCE Permit Type: Fence Job' Description: INSTALLATION OF 6' HIGH PLYWOOD AND LATTICE FENCING GOING LT REAR FRT W/GATE, LT REAR SD, RT REAR SD AND RT REAR FRONT W/GATE- 67L.F. Subdiv: Whispering Creek Co-op Lot: 313 Block: Setbacks Left: Right: Number of Units: 1.00 Floors: 1 Minimum Floor Elevation: Job Value: $ 300.00 Parcel: 1433-504-0242-000/8 Front: Rear: Zoning: RMH-5 Buildings: 1 Square Footage: 0.00 Flood Map: 177G Flood Zone: X Elev: Permit holder acknowledges through acceptance of this permit that separate permits must be obtained as required by the Florida Building Code including those for all electric, plumbing, mechanical, roofing, and structural work. Further, he/she acknowledges responsibility to comply with all requirements of the 2004 Florida Building Code. NOTICE: In addition to the requirements in this permit, there may be additional restrictions applicable to this property that may be found in the records of this County, and there may be additional permits required from other governmental entities such as water management districts, state agencies, or federal agencies. s:553.79(10), F.S. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR BUILDING IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. s.713.135, F.S. Christopher Lestrange Building Official Date For Automated Inspections, Call (772) 462-1261 For Questions, Call (772) 462-2172 St. Lucie County Land Development Code Section 11.05.01 (A) (2) states; Building Permits shall expire and bec� me null and void if work authorized by such Building Permit is not commenced, having called for and reclived a satisfactory inspection, within six (6) months from the date of issuance of the permit, or if the work is not completed within 18 months (permit by contractor) or 24 months (permit by owner) from the date of issuance of the Building Permit. M