HomeMy WebLinkAboutCertificate Of Termite Treatment2300 Virginia Ave -
Fort Pierce, FL 34982
772-462-2172 Fax 772-462-6443
CERTIFICATE OF TERMITE TREATMENT
CONSTRUCTION SOIL TREATMENT
�a
PERMIT #.4 �' " ^, `fr t��JOB ADDRESS: /q- 'Lgf�k�=
BUILDER/CONTRACTOR:
PEST CONTROL CONTRACTOR:'cL�-,�i
PEST CONTROL LICENSE #:�c9`�
We, the undersigned, hereby certify that we have pretreated the above described construction for
subterranean termites in accordance with the standards of the National Pest Control Association.
Square feet if area treated:
Percentage of solution:
Date of Treatment:
Footing
1st Treatment
Re -Treat
Driveway
15t Treatment
Re -Treat
Other
1st Treatment
Re -Treat
Chemicals used CL
Total gallons used: 4
Time of Treatment:.
Slab
1't Treatment
Re -Treat -
Rools •
r Final Inspection
of Exterm
Note: - There must be a completed form for ep6h required treatment or re -treatment and this form must be on the job
site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re inspection
fee charged,
FBC104.2.6 Certificate of Protective Treatment for prevention of termites A weather resistant jobske posting board
shall be provided to receive duplicate Treatment Certificates as each required protective treatment is completed,
providing a copy for the person the permit is issued to and another copy for the building permit files The Treatment
Certificate shall provide the product used, identity of the applicator, time and date of the treatment, site location, area
treated, chemical used, percent concentration and number of gallons used, -to establish a verlfj'able record of
protective treatment. If the soil chemical barrier method for termite prevention is used, final exterior treatment shall
be completed prior to final building approval.
St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on
the electrical panel box cover, listing all the treatments and dates of applications.
Oct 02 2017 G:OOPM HP ILA
Fort Pierce, FL 34982
772-462-2172 Fax 772-462-6443
P.
i .
RECEIVED
OCT 0 3 2017
PERMITTING
St. Lucie County; FL
CERTIFICATE OF TERMITE TREATMENT
CONSTRUCTION SOIL TREATMENT
PERMIT
BUILDEI
PEST CONTROL CONTRACTOR:
PEST CONTROL'LICENSE #:�
We, the undersigned, hereby certify that we have pretreatedthe above described construction for
subterranean termites in accordance with the standards of the National Pest Control Association.
Square feet if area treated: themjcals used:0'awe.'r-TC,
Percentage of solution: ►
Date of Treatment: AJl
Footing
1" Treatment
Re -Treat
Driveway
1't Treatmen
Re-T��tf Cher i`�0_
1� Treatment
Re -Treat
Total gallons used:
Time of Treatment: _ r
Slab
1 Treatment
Re -Treat
Pools
1� Treatment
Re Treat.
Perimeter for Final Inspection
.0
Signature of Exterminator
F ti
Note" there must be a completed form for each required treatment or re -treatment and this form must be on the job
site to be picked up by the inspector at t/me of each inspection or the scheduled inspection will fail and a re -inspection
fee charged.
FBC104.2.6 Certificate of ProtedYve Treatment for prevention of termites A weather resistant jobsite posting'board
shall be provided to receive duplkate Tmatment Certificates as each required protective treatment Is completed,
pro vidiag a copy for the person the permit Is Issued to and another copy for the building permit files. The Treatment
Certificate shall provide the product used, Identity of the applicator,. time and date of the treatment site location, area
treated, chemical used, percent concentration and number ofgallons used, -to establish a verifiable record of
protective treatment. If the sot! diemical banger method for termite prevention is used, final exterior treatment steal!
be completed prior to Anal bullding approval.
St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on