HomeMy WebLinkAboutFBC Energy Conservation CodeRECEIVED
Planning & Development Services JUN j
Building & Code Regulation Division 5 2019
2300 Virginia Ave, Rm 201 Permiwng �t
Fort Pierce, FL 34982 St Lalcre
772-462-2165 Fax 772-462-6443 count lv
• FBC ENERGY CONSERVATION CODE
Duct Sealing Certification
Prescriptive and Performance Method
Date. U — Permit #: T C C / — O? o i3 - Lot #: f Z-
Contractor lesr/6- r-i f� ( ��,^,,Address:
Construction: ❑ Post Construction Test ❑ Rough -in Test
Test Conditions:
Date: ' l y / jT Floor Area (ft2): q/
Time: - : o u Primary Location of Supply Ductwork y„
Indoor Temperature (F): _ '7 Z Primary Location of Return Ductwork
Outdoor Temperature (F): '7 V
Duct Leakage:Uefault ❑ Prop. Leak Free
Test Pressure: Z (Pa)
Baseline Duct Pressure (optional) _ , !2 (Pa)
Duct Press. (P I Flow R! I Fan Press
Z
E4
Tesfin-q Com an
Company Name: Pro Duct Services
❑ Proposed On =
(clm) I Results: ❑ Pass ❑
Total Leakage (cfm): G13
Total Leakage per 100 sgft: /v
CFM25 x 100 divided by the CFA = Duct Leakage CFW100 sgft.
Address: 1915 Rio Vista Dr., Fort Pierce, FI.
I hereby certify that the above Duct Sealing Leakage results demonstrate compliance with 5h Edition FBC Energy Conservation requirements in accordance with
Section R403.2.2.
Signature: -'-;;;�
Printed Name: Michael Faurot LicenWCertificate #: 5059122
,APPROVED