Loading...
HomeMy WebLinkAboutINSTALLATION INSTRUCTIONSDominion Building Products Installation Instructions General Information 1) Rough opening material, by others, must be installed properly to transfer loads to the building structure. 2) Building walls must be designed to support and sustain loads developed. by the door and frame assembly and transfer loads to the building structure. ' Frame Installation 1.) Fasten frame corners for KD frames as shown in illustration 1, page 2 using 5/16" x 1/4" bolts. Anchor preassembled frame corners as shown in illustration 2, page 2 using 6 ea. #10 x 1" TEK screws. 2.) Ensure the correct number and. type of anchors is in the frame or is available. See sheet 2 for anchor descriptions and fastening methods. 3) Install frame in the wall. Ensure frame is plumb and square. Door Installation 1.) If door is glazed, it is recommended that the glazing be installed prior to door installation. See polycarbonate or Glasslam installation instructions on pages 4-9. 2.) Install hinges on. door leaf. 3.) Open door hinges. Stand door up and align hinge leafs not attached to the door with the hinge preparations in the door frame. 4.) Ensuring the top hinge is properly aligned in the hinge prep attach the hinge to the frame hinge reinforcement with one screw 5.) Repeat Step 4 for the remaining hinges. 6.) Install all hinge screws. 7.) Install door hardware in accordance with hardware manufacturer's instructions. 8.) Install threshold and weather-strip in accordance with hardware manufacturer's instructions. 9.) Check door and hardware for proper operation. 10.) Shim door as needed and recheck door for operation Frame Jamb & Head Anchor & Building Attachment Requirements 1.) See illustration 1, page 2 for K.D. jamb anchor descriptions and attachment methods. 2.) See illustration 2, page 2 for preassembled jamb anchor descriptions and attachment methods. 3.) See illustration 1 & 2, Page 2 for K.D. & preassembled frame head attachment to the building girt. 4.) See illustration 3, page 3 or K.D & preassembled girt attachment to the building. RW � y Page 1 of 9 10/23/2007 Illustration 1, K.D. Unit 610 X 1' S.II Drilling Screws. Frame Head Min. 012 Anchor Bolls 12 • On.Genl,, Frame JBmp Par Jemb. 5115' x 314' / 51ee1 011, Siding p,0 a , Sell l, Drllling Screw Siding Na ' .� 2 E...10 / w Ealeriar Door Fece. Frame Jemb Drilling Sun - (� $10'X V Sell Per Jem Drilling Screw., L Mi..a13 An'he's 11. Per Jemb, 5116' a 1 112' 2.250 a 3.375 Base Angle .Frame JamOTOFmme Head Condition 4 Reed Per Anchor, 2Per J+mb Faca' Inter 1-Pet No., Anrhnr condemn ` affix Drilling' 4 Red'd.P E.Iadc, Do., Fee. 2.250 Ftam. Jamb 2 Per J. � 0 �- Frame Jemb To Gel Condilan Frame Siding #lox 1' Self Drilling Screw OFloorAnd Frame Comer Join! Anchor 1.750—�( (�— 3.B75 Frame Jamb To Intermediate Girt Condition I I �Snnl Wnld, 4-.Plea. 6.000 Frame Jamb -- 12 Ga. 19.000 �16 Ga. R10 X 1' Spooad A11Mew. On Can,., M 2' e1a151sm. Merol Siding To J+mo Condltion 31 2."a Jamb To Top A intermediate Gil Anchor Min. 3 Pairs Per Jamb #1 o x 1" Min. Of 4 Anchor Screws #10 x 1' 16 Ga. x13/4"x8112" Subjamb Channel / LMin. Of2Anchor Bolts Per Jamb, Will" x 2 114'7" L 2.250 x 3.376 Base Angle Floor Anchor Condition 1.750 u 8.500" Max: To Suit Jamb Height -...: f \`% Subjamb Channel Illustration 2, Preassembled Unit #10 x i" Self Drilling ^ l 12" On Center .Frame Head — Min. Of 6 Anchor Screws #10x 1" - Floor / Head Anchor 16 Ga. x 1 3/4' x 81/2" x Full Haight Subjamb Channel — 2 Ea. #10 x 1' Self Drilling Screws,-1 Per Jamb Face — Frame Jamb —/ Fame Jamb To Frame Head Condition ►yam 12 Ga, j5 —►� 4.750 �-�-- V Floor, Intermediate Girt $ Head Anchor Page 2 of 9 Intenneidate Girt, 1 PecJamb � h i Min. Of 6 Anchor i Screws #12 x 1 1/4" Floor / Head Anchor Frame Jamb To Intermediate Girt Condition ///��� 16 Go. x 1 3/4" x 8. 1/2" (Max.) Subjamb Channel Frame Jamb \ #10 x.1' Spaced At 12' Max. Metal Siding Metal Siding To Jamb Condition 10/23/2007 Illustration 3, K.D. & Preassenibled /-- Vertical Steel Channel Supplied By Building Manufacturer Metal Girt Clip Door Frame Bui lding 0 0 Door Door Hardware 0 0 Threshold ZM.t.1 Building Siding Cross Section KD Unit Metal Girt Clip Subjamb Channel Door Frame 0 0 Door Door Hardware 0 0 -Threshold Polycarbonate Glazing Instructions, Curries 112" x 1 1/4" Bolts & Nuts 6 Req'd Per Girt Clip Vertical Steel Channel Supplied By Building Manufacturer 0 .0 W 1/2" x 1 1/4" Bolts & Nuts 1; Cross Section Preassembled Unit 1,eq- . Girt — p Page 3 of 9 10/23/2007 Curries Type I Vision Light Kit 1/4" THICK POLYCARBONATE SHEET (LAZING SHIMS AS NEEDED Curries Type 3 Vision. Light Kit W THICK POLYCARBONATESHEEf I/B" X 10 CLOSED CELL FOAM GLAZING TAB USED ON FIXED AND REMOVABLE STOPS #5 X 1-1W OVAL HEAD TEK SCREW GLASS STOP 0.624 Q375 0.250 /-1/6" X 1I7 CLOSED CELL FOAM GLA7JNG TAPE USED ON FIXED AND REMOVABLE STOPS _#6 X 1-1/4" OVAL HEAD TEK SCREW 0.500 [cI•CZ$7ti;� 1) Before removing the removable stops, check to be sure there are screws in every hole. Pre -drill holes with a #36 bit where there are screw holes but no screws. Do not remove stops. 2) Using a pencil, mark alignment marks on the removable stops and the door. 3) Unscrew the #6 x 1-1/4" oval head TEK screws from the removable stops and remove the removable stops. Keep the screws. 4) Apply 1/8" x 1/2 closed cell foam glazing tape to the fixed stop. 5) If there is plastic release on the foam glazing tape, pull the plastic release back about 2" from. each end of the foam tape. Pull the plastic release around the fixed stop so it can be grasped after placing the polycarbonate on the unexposed foam tape. 6) If there is paper release on the foam glazing tape, remove the paper release before glazing. Spray the exposed foam tape with a mild soap solution immediately before placing the polycarbonate on the exposed foam tape. 7) Place glazing shims, as. needed, then set the polycarbonate on the foam glazing tape. 8) Adjust the polycarbonate, as necessary, to center the polycarbonate in the cutout. 9) If the release is plastic, grasp the free end of the plastic release, while holding the polycarbonate to keep it from moving. Then slowly pull the plastic release off the foam tape that was applied to the fixed stop. 10) Apply 1/8" x 1/2" closed cell foam glazing tape to the removable stop. 11) If there is plastic release on the foam glazing tape, pull the plastic release back about 2" from each end of the foam tape. Pull the plastic release around the removable stop so it can be grasped after placing the removable stop on the polycarbonate. 12) If there is paper release on the foam glazing tape, remove the paper. Spray the exposed foam tape with a mild soap solution immediately before placing the removable stops against the polycarbonate. Page 4 of 9 10/23/2007 13)Using the alignment.marks, position the removable stops against the polycarbonate. 14) Install and tighten the #6 x 1-1/4" oval head TEK screws in the removable stops. Be careful not to over tighten. 15) If the release is plastic, grasp the free end of the plastic release, and slowly pull the plastic release off the foam tape that was applied to the removable stop. 16) Using the Dow Corning 995 silicone or other high quality silicone, apply a cap bead over the closed cell foam tape on the exterior side of the door vision light kit. Glasslam Glazing Instructions 0.62s^ 0.625" GLAZING BY OTHERS 0 472" ' 0.472" 7 1/8" X 1/2" CLOSED CELL FOAM 1/8" X 1/2" CLOSED CELL FOAM 0.1875. 0.1875" GLAZING TAPE USED ON FIXED GLAZING TAPE USED ON FIXED 0.097" AND REMOVABLE STOPS 0.097" AND REMOVABLE STOPS GLASSLAM (NEBULA GLASS) GLASSLAM (NEBULA GLASS) LAMINATED GLASS ASSEMBLY / LAMINATED GLASS ASSEMBLY #6 X 1-1/4" OVAL HEAD TEK SCREW #6 X 1-1/4" OVAL HEAD TEK SCREW PET FLAP .500" PET FLAP GLAZING SHIMS GLASS STOP GLASS STOP AS NEEDED GLAZING SHIMS I AS NEEDED DOW CORNING 995 DOW CORNING 995 STRUCTURAL SILICONE STRUCTURAL SILICONE Curries Type 2 Vision Light Kit Curries Type 3 Vision Light Kit 1) Before removing the removable stops, check to be sure there are screws in every hole. Pre -drill holes with a #36 bit where there are screw holes but no screws: Do not remove stops. 2) Using a pencil, mark alignment marks on the removable stops and the door. 3) Unscrew the #6 x 1-1/4" oval head TEK screws from the removable stops and remove the removable stops. Keep the screws. 4) Apply 1/8" x 1/2" closed cell foam glazing tape to the fixed stop. 5) If there is plastic release on the foam glazing tape, pull the plastic release back about 2" from each end of the foam tape. Pull the plastic release around the fixed stop so it can be grasped after placing the Glasslam on the unexposed foam tape. 6) If there is paper release on the foam glazing tape, remove the paper release before glazing. Spray the exposed foam tape with a mild soap solution immediately before placing the Glasslam on. the exposed foam tape. 7) Place glazing shims, as needed, then set the Glasslam on the foam glazing tape. 8) Adjust the Glasslam assembly, as necessary, to center the assembly in the cutout. 9) If the release is plastic, grasp the free end of the plastic release, while holding the Glasslam to keep it from moving. Then slowly pull the plastic release off the foam tape that was applied to the fixed stop. 10) Trim the PET flap so it is flush with the door face. 11)Take a putty knife and insert it between the PET flap and the edge of the cutout in the door. Using the putty knife pull the PET flap away from the cutout in the door. 12) While holding the PET flap back away from the cutout with the putty knife, use a caulking gun to apply Dow Corning 995 silicone between the PET flap and the steel in the cutout of the door. Page 5 of 9 10/23/2007 IMPORTANT: Ensure that the Dow Corning'995 silicone fully wets out or covers the PET flap and comes in contact with the steel around the cutout in the door. 13) Slowly move the putty knife around the door ahead of the caulking gun and apply the 995 silicone around the entire cutout in the door. 14)Apply 1/8" x 1/2" closed cell foam glazing tape to the removable stop. 15) If there is plastic release on the foam glazing tape, pull the plastic release back about 2" from each end of the foam tape. Pull the plastic release around the removable stop so it can be grasped after placing the removable stop on the polycarbonate. 16) If there is paper release on the foam glazing tape, remove the paper. Spray the exposed foam tape with a mild soap solution immediately before placing the removable stops against the Glasslam. 17) Using the alignment marks, position the removable stops against the Glasslam. 18) Install and tighten the #6 x 1-1/4" oval head TEK screws in the removable stops. Be careful not to over tighten. 19) If the release is plastic, grasp the free end of the plastic release, and slowly pull the plastic release off the foam tape that was applied to the removable stop. 20) Using the Dow Corning 995 silicone or other high quality silicone, apply a cap bead over the closed cell foam tape on the exterior side of the door vision light kit. Polycarbonate Glazing Instructions, Ceco TYPE W 375" D0256 room Tape #8 Foam To X t Q" Phil F.H. TEK Screw .500° /—Frotwelds & Max12" Max ` From End & 12" Max —_� Or Center 625" Spotwelds 8" Max. ?50 From End & 8" Max. Or. Center 3� X eg" Double Sided Tape Ceco Door Type "N' Vision Lite Kit TYPE W X t J" Phil. F.H. 4 Screw Spotwelds" Max. From .F,nd Rt 8" Max. On Center Ceco Door Type "B" Vision Lite Kit 1.) Before removing the removable stops, check to be sure there are screws in every hole. Predrill holes with a #29 drill bit where there are screw holes but no screws. Do not remove stops . Page 6 of 9 10/23/2007 2.) Using pencil, mark alignment marks on the removable stops and door. 3.) Unscrew the #8 x 1/ 14" flat, head TEK screws from the removable stops and remove the removable stops. Keep the screws. 4.) Apply 1/8" x '/z" closed cell foam glazing tape to the fixed stop. 5.) If there is plastic release on the foam glazing tape, pull the plastic release back about 2" from each end of the foam tape. Pull the plastic release around the fixed stop so it can be grasped after placing the polycarbonate on the unexposed foam tape. 6.) If there is paper release on the foam glazing tape, remove the paper release before glazing. Spray the exposed foam tape with a mild soap solution immediately before placing the polycarbonate on the exposed foam tape. 7.) Place glazing shims, as needed, then set the polycarbonate on the foam glazing tape. 8.) Adjust the polycarbonate, as necessary, to center the polycarbonate in the cutout. 9.) If the release is plastic, grasp the free end of the plastic release, while holding the polycarbonate to keep it from moving. Then slowly pull the plastic release off the foam tape that was applied to the fixed stop. 10.) Apply 1/8" x %" closed cell foam glazing tape to the removable stop. 11.) If there is plastic release on the foam lazing tape, pull the plastic release back about 2" from each end of the foam tape. Pull the plastic release around the removable stop so it can be grasped after placing the removable stop on the polycarbonate. 12.) If there is paper release on the foam glazing tape, remove the paper. Spray the exposed foam tape with a mild soap solution immediately before placing the removable stops against the polycarbonate. 13.) Using the alignment marks, position the removable stops against the polycarbonate. 14.) Install and tighten the #8 x 1 '/a" flathead TEK screws in the removable stops. Be careful not to over tighten. 15.) If the release is plastic, grasp the free end of the plastic release, and slowly pull the plastic release off the foam tape that was applied to the removable stop. 16.) Using the Dow Corning 995 silicone or other high quality silicone, apply a cap bead over the closed cell foam tape on the exterior side of the door vision kit. Glasslam Glazing Instructions, Ceco Page 7 of 9 10/23/2007 TYPE "C" D0258 8 X 2° .625" Fcam Tape X '1 4" Phil. F.H. k'TEK Screw .500"Dow Corning 995 Silicone .750"� Spotwelds �" Max. From End & 8" Max. X 8" Double On Center Sided Tape Spotwelds 3" Max.--�' From End & 12" Max. On Center Cec o Door TYPE "C" Vision Kit TYPE "D" g" X .625" Foam Tope $ X 1 e' Phil. F.H. TEX Screw ----Dow Corr .625' .500" / 995 Silicone Spotwelds R" Max. Fram End & 4" Max. On Center Ceco Door TYPE "D" Vision Kit 1. Before removing the removable stops, check to be sure there are screws in every hole. Predrill holes with a #29 drill bit where there are screw holes but no screws. Do not remove stops. 2. Using pencil, mark alignment marks on the removable stops and the door. 3. Unscrew the #8 x 1 '/a" flathead TEK screws from the removable stops and remove the removable stops. Keep the screws 4. .Apply 1/8" x'/2" closed cell foam tape to the fixed top. 5. If there is plastic release on the foam glazing tape, pull the plastic release back about 2" from each end of the foam tape. Pull the plastic release around the fixed stop so it can be grasped after placing the Glasslam on the unexposed foam tape. 6. If there is paper release on the foam glazing tape, remove the paper release before glazing. Spray the exposed foam tape with mild soap solution immediately before placing the Glasslam on the exposed foam tape. 7. Place glazing shims, as needed, then set the Glasslam on the foam glazing tape. 8. Adjust the Glasslam assembly, as necessary, to center the assembly in the cutout. 9. If the release is plastic, grasp the free end of the plastic release, while holding the Glasslam to keep it from moving. Then slowly pull the plastic release off the foam tape that was applied to the fixed stop. 10. Trim the PET flap so it is flush with the door face. 11. Take a putty knife and insert it between the PET flap and the edge of the cutout in the door. 12. While holding the PET flap back away from the cutout with the putty knife, use a caulking gun to apply Dow Corning 995 silicone between the PET flap and the steel in the cutout of the door. IMPORTANT: ensure that the Dow Corning 995 silicone fully wets out or covers the PET flap and comes in contact with the steel around the cutout in the door. 13. Slowly move the putty knife around the door ahead of the caulking gun and apply the 995 silicone around the entire cutout in the door. 14. Apply 1/8" x'/2" closed cell foam glazing tape to the removable stop. 15. If there is plastic release on the foam glazing tape, pull the plastic release back about 2" from each end of the foam tape. Page 8 of 9 10/23/2007 16. If there is paper release on the foam glazing tape, remove the paper. Spray the exposed foam tape with a mild soap solution immediately before placing the removable stops against the Glasslam. 17. Using the alignment marks, position the removable stops against the Glasslam 18. Install and tighten .the #8 x 1 1/4" flathead TEK screws in the removable stops. Be careful not to over tighten. 19. If the release is plastic, grasp the free end of the plastic release, and slowly pull the plastic release off the foam tape that was applied to the removable stop. 20. Using the Dow Corning 995 silicone or other high quality silicone, apply a cap bead over the closed cell foam tape on the exterior side of the door vision kit. ' Threshold Installation #10 x 1-112" WOOD SCREW I— OR 12" OC TYP T - 3116" X1-1/4" TAP CON 5.25" TYPICAL THRESHOLD MOUNTING DETAIL. THRESHOLD NOTE: 1/8" CLEARANCE BETWEEN THE BOTTOM OF.THE DOOR AND THE THRESHOLD IS TYPICAL Rev. A. 1) Added information for frame jamb & head anchor and building attachment requirements, sheet 1. 2) Added illustration #3, sheet 3. 11 /27/07 Page 9 of 9 10/23/2007