HomeMy WebLinkAboutFIELD DENSITY TEST OF COMPACTED SOILSPhone 954-784-294
1919
ederal
954-784-7875
Fax 954-784.7875
L i 8 TESTING INC. www.fed-eng.com
250 SW 13th Ave Pompano Beach, FL 33069
Field Density Tests of Compacted Soils Method D-6938
Project: Proposed Residence Lot 127, Creekside Date: January 30, 2018
Address: 8432 Cobblestone Drive, Fort Pierce, FL 34945 Order #: 18DR083
Area Tested: Building Pad Permit #: f % f 0 _ 17
Material Type: Light Brown Sand with Traces of Shell - Tech: BK
Client: D.R. Horton, Inc.
Address: 1430 Culver Drive NE Compaction Req.: 95%
Palm Bay, FL 32907 Proctor Method: ASTM D-1551
Test
#
TEST LOCATION
Probe
Depth
Elev.
Moist
°
�0
Dry
Density
PCF
Proctor
Value
PCF
Optimum
Moisture
%
Compaction
Pass
1
Center of Building Pad
12"
FL
6:1
108.0
109.3 1
12.5
96.8%
Yes
2
SE Corner of Building Pad
12"
FL
6.8
108.8
109.3
12.5
99.5%
Yes
3
NW Corner of Building Pad
12"
FL
6.1
108.3
109.3
12.5 1
99.1%
Yes
4
5
6
7
8
9
FEB 1.201
10
11
12
13
14
SOHN
/'.' .
Remarks: See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer �`� ��ti �'� � SF �•. %'
This Is a Compaction Test only on the top 12" of the pad and is not a verification of SgWidep-rilig CW
Legend for Elevation: All.PR = Proofroll 1,2,3 = 1st, 2nd, 3rd Lift Submitted by:_
SL = Springline FL = Final Lift Keith LeBlanc, P.E=%O:AIN 3./ Ct�// o
SG = Subgrade BG = Below Grade Federal Engineerind4� Vir t�lOP•,•��;��
BC = Basecourse BOF = Bottom of Footing Florida Reg. No. 59394.0,
Certificate of Authorizatior(#,5/3 ., "'k
TOP =Top of Pipe FG =Finished Grade
��r ittt
As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements,
conclusions or extracts from or regarding our reports is reserved pending our written approval, A density test determines the degree of compaction of the tested layer of material
only. A density does not replace a soil bearing capacity determination. These density tests do not certify the underlying soil materials below the proposed structure. The results
do not preclude or guarantee that future settlement and cracking will not occur. A soil boring test is required to certify that the underlying soils will support the proposed structure
without settlement. If no soil borings have been performed to verify the underlying soils, we recommend that soil borings be performed to evaluate the suitability of the underlying
soil to support the proposed structure. After laying dormant for a period of 90 days or after heavy rain/storms, retesting must be perfgWgd.o8lbls work.
PAGE 1 of 2 PARTIAPPL�111eeA. FP�YyPROVAL
Compacted Soils Method D-6938 Disclaimer
Pursuant to your request, Federal Engineering & Testing, Inc. (FET) has performed a compaction- test at the referenced
project on the reverse side. The purpose of our+test was to determine the degree of compaction of the tested layer of
material only. In no way shall a compaction test replace a soil bearing capacity determination. A soil boring test must be
performed by the client prior to construction to verify subsoil conditions. Our scope of services only Included testing the top
12" of added fill material. FET was not contracted to perform supervision of the building pad preparation. This testing of the
added fill material does not include an analysis of the underlying soil -materials to determine if they are capable of supporting
the proposed structure without settlement. This density compaction test does not warranty any underlying soil materials or
conditions below the tested top 12 inches of material. If no soil borings have been performed in the location of the proposed
structure, we recommend performing soil borings below all foundation areas of the proposed structure to verify the underlying
soil conditions.
Environmental analysis of the soil materials is not part of the scope of services. If environmental analysis of the soils is
required, we can provide a proposal for performing.an environmental analysis of the soil materials. The scope of services is
for determination of the degree of compaction of -the tested layer of material only. No other analysis is implied or warranted.
Job project specifications were not available at the time the work was performed. Determination of the pass/fail .compaction
results are based on current common industry requirements of 95% of the ASTM D-1557 standard for building foundations
and 98% of the AASHTO T-180 standard for paved areas such as roadways and parking lots.. If different specifications are
required, Federal Engineering & Testing, Inc. shall be notified.
Our findings are relative to the date and areas of our site work and should not be relied upon to represent conditions on other
areas or dates. Any subsequent site disturbances due, to water erosion, rain waters, construction activities, excavations,
overgrown, vegetation, traffic and other disturbances will void this test and the site must be re -compacted and re -tested prior
to construction.
As a mutual protection to clients, the public and ourse
and authorization for use, publication of statements,
pending written approval.
all reports are submitted are the confidential property of clients
lusions or extracts from or regarding our reports is reserved
It has been.a pleasure working with you and we look forward to doing -so in the near4uture.
Page 2 of 2
Palm Bay; FL. 32907
:: :.`
::
::
Proctor Method:
:ASTM D-1 57 :.
Test
Probe
Moist'.
Dry
Proctor '
'.Optimum :...
. • . : ; . :
;...
#
...:..
TEST LOCATION.'.
.Depth
Elev:
.%
Density.:
:
:Value
:-Moisture , :-
Compaction: •
.'-Pass:-
..
P CF: •
PCF" .
1 •
Center of Buildin Pad- :. ::
1�2"
FL
: 6:1
108.0 :
109:3 ::
12.5
98.8%
Yes
:
2.
SE•.Comer- of Buildin •Pad ::
:.
12"
FL.
. '.8.
:108:8 :
109.3 :
:.12:5 :
: 99:5%
.3•.
NW Corner -of Buildin :.Pad.
::. •
..12" ,
: FL:
Al.
108.3:.'
-.109.3:
- :12.5.•.
..99.1%0 ..•.
� : Yes
:
6
9:
13.
14
KemarKs:.. See; Reverse.Side (Pagid 2, of 2) for.Additional Inforrhation4or Disclaimer,:
This Is' a Compaction'Test.only on the'top .12" of the pad and is not a verification of S it Bearing Capaci '.
Legend for Elevation: :: • :: :: • -�
:PR =:Proofroll• 1;2:3 =1st, 2nd; 3rd:Lift; $utimitted: [iy:
SL SringlF=Final Lift
: eithUBlanr, P.E.
SG = Subgrade BG = Below. Grade, federal Engineering,4Testing; Inc.
BC = Basecourse BOF =Bottom -of Footing.. Florida Reg A1o, 59394
TOP ='Top of Pipe. FG Finished Grade Certificate of AUthdTizatiejn #5471:
:. As a mutual :protection to. clients, the public and ourselves; all reports are'submitted as the confidential propeq:of'clie ts,'and. authorisation for publication of, statements, :
.conclusions or extract's from or regarding our reports is reserved pending our written approval. A density te�;Ydetermines the degree of compaction of the tested layer:of material
only. A density does:not.replace'a soil: bearing capacity.determination. These density tests do: not certify th2 underlying soil mstedals: beloy7 tr'e' proposed'sfructure. The. results
do not preclude or guarantee.that:future settlement and cracking will not occur;A soil boring test is. requiredto.certify that the riridetlyinq�oHswill support the proposed structure
Without settlement- If no soil borings have been performed to verify the underlying soils; we recommend that'sgil tiartngshe perfoim- to evaluate ,the suitability of the underlying :
soil to support the proposed:structure. After laying dormant fora. period of;80 days or a$er:heavy rainstorms; retesting must ba. performed on this work.
PAGE 1 of.2 .
Color acted Soils :NiethodD-69.38 Disclaimer.
p
Pursuant to your request,Federal Engineering' &. Testing, Inc. '(FET) has 'performed a -do mpaction test: at: the'' referenced
project :on the. reverse aide:. The purpose of our test .was. to -determine 'the degree of . compaction of :the . tested: layer of'.
material only. :In 'no. way shall a compaction. test replace a soil bearing capacity :determination. 'A ;soil. boring -test:.must. be.
performed by the client.prior-to construction to verify subsoil -conditions.:0ur scope of. services only -included testing, the:top -
12"�of'added: fill material. FET Was not contracted to perform supervision of the building pad :preparation: This testing ofahe : added -fill material does:hot include an analysis. of the underlying soil materials to� determine if they are capable of, supporting
the proposed structure without settlement. " This density.compaction.test.does_hot'warranty any underlying.soil.materials. or
conditions below -the tested top 12� inches of material.' If no'soil borings have: been performed in.the location of the proposed
. structure., we recommend performing soil• borings below -.all .foundation.areas of-theproposed'structure to verify the underlying'
soil conditions:. .
Environmental analysis of; the: soil. materials: is not"part :of.the scope. of. services:. If environmental analysis ;of the soils is:
required,:'we'can'proyide a proposal for performing.an environmental; analysis of. the soil. materials. The scope of services is..
:for determination of. the degree of compaction of the-testedaayer of material.only..No other analysis is.implied orwarranted.
Job project specifications' Were: not available at: the time the work Was.'perfbt ed'. Determination of the pass/fail compaction.
results are based on current common. industry requirements, of 05%0 •of. the ASTM D-1557: standard. for building foundations
and :98% of the.AASHTO:T-180 standard 'for pave'd:areas such -as roadways and, parking lots.' If different specifications are:
required, Federal Engineering &Testing, .lnc: shall
�b ..
e notified. '
-Our findings are'relative to the -date and areas of our site work:and'should not be relied upon to represent conditions on other
areas .or' dates., Any subsequent .site .disturbance's due: to water erosion, rain waters; construction activities, excavations,:
overgrown; vegetation; traffic and other: disturbances will.vold this test and, the site must be re -compacted ;and:re-tested: prior' =
to. construction..
As a mutual protection to .clients; the public and ourselves, all reports are submitted are:the confidential: property of clients-
and:8uthorization for.use; -publication, of statements,, .conclusions :or:extracts •.from ,Or, regarding; Our ,reports. is .reserved .
pending written approval.
It has been ,a pleasure Working .with you and we look forward to doing: So in'the near:future..
Page 2.'of 2