Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
FIELD DENSITY TEST OF COMPACTED SOILS
eder�i'l Phone 954-784-2941 800-848-1919 Fax 954-784-7875 & TESTING INC. WWW.fed-eng.com 250 5W 13th Ave Pompano Beach, FL 33069 Field Density Tests of Compacted Soils Method D-6938 Project: Proposed Residence Lot 109, Creekside bate: November 24, 2017 Address: 3100 Yellowstone Circle, Fort -Pierce, FL 34945 Order#: ITDR=1152 Area Tested: Building Pad Permit Material -Type: Light Brown Sand with Some Rock Tech: SL Client: D.R. `Horton, Inc. Address: 1430 Culver. Drive NE Compaction Req.: 95% Palm Bay, FL 32907 Proctor Method: ASTM D-1557 Test # TEST LOCATION Probe De th p Elev. Moist % Dry. Density PCF . Proctor Value .. PCF Optimum, Moisture % Compaction Pass 1 NE Corner.of.Pad 12". FL 11..3 105.1 110.5 12.5.. 95.1% Yes 2 Center of Pad 12" FL .9.8 106.4 110.5 1 12.5 96.3% Yes 3 SW Corner of Pad 12" FL' 9.4 1058 110.5 125 95.7% Yes 4 5 6; T 8'1 9 10 12 DEC 11 2011 13 14- Remarks: See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer This is a Compaction Test only on the top 12" of the pad and is not a verification ,af 'S' it Searing Capacity. Legend for Elevation: PR = Proofroll 1,2,3 = 1st, 2nd, 3rd Lift Submitted by-. SL = Springline FL = Final Lift p e K6ith LeBlanc, P.E: % �� � �� SG = Subgrade BG = Below Grade ' Federal'Engi�teeting & (stiri , Inc. � BC = Basecourse BOF = Bottom of Footing FILE �0p _..,Florida Re No. 59394 TOR = Top of Pipe FG = Finished Grade Certificate :9nf, Authetization iM-5 471 As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property, of clients, and authorization for publication of statements, conclusions or extracts from or regarding our reports Is reserved pending our written approval. A density test'abteroiries the degrea'of 6,'Apa6tlon of the tested layer of material only. A density does not replace a soil bearing capacity determination. These density tests do not certify the• and©rlying soil materisls below the proposed structure. The results do not preclude or guarantee that future settlement and cracking will not occur. A soil boring test is rsquirevd to; certify tiiat Yee underlying soils will support the proposed structure without settlement. If no soil borings have been performed to verify the underlying soils, we recofnmend ithat'soll, borings be performed to evaluate the suitability of the underlying soil to support the proposed structure. After laying dormant for a period of 90 days or after hea'vyy'raih/stoims, retesting must be performed on this work. PAGE 1 of 2 C®mpa Pursuant to your request, Federal Engine project on the .reverse side. The purpose material only. In no way shall a compactic performed by the client prior to constructioi 12" of added fill material. FET was not ci the added fill material does not include a supporting the proposed structure without materials or conditions below the tested to the proposed structure, we recommend F verify the underlying soil conditions. Environmental analysis of the soil- mate required, we can provide a proposal for for determination of the degree of comp Solis Method D-6936 Disclaimer -ing & Testing, Inc. (FET) has performed a compaction test at the referenced )f our test was to determine -the degree of compaction of the tested layer of i test replace a soil bearing capacity determination. A soil boring test must be to verify subsoil conditions. Our scope of services only included testing the top itracted to perform supervision of the building pad preparation. This testing of analysis of the underlying soil materials to determine if they are capable of ettlement. This density compaction test does not warranty any underlying soil 12 inches of material. If no soil borings have been performed in the location of rforming soil borings below all foundation areas of the proposed structure to is not part of the scope of services. If environmental analysis of the soils is rming an environmental analysis of the soil materials. The scope of services is of the tested layer of material only. No other analysis is implied or warranted. Job project specifications were not available at the time the work was performed. Determination of the pass/fail compaction results are based on current common. industry requirements. of 95% of the ASTM D-1557 standard for building foundations and 98% of the AASHTO T-180 standard for paved areas such as roadways and parking lots. If different specifications are required, Federal Engineering & Testing, Inc. shall be notified. Our findings are relative to the date and 'areas of our site work and should not be relied upon to represent conditions on other areas or dates. Any subsequent site disturbances due to water erosion, rain waters, construction activities, excavations, overgrown, vegetation, traffic and other disturbances will void this test -and the site must be re -compacted and re -tested prior to construction. As a mutual protection to clients, the pubic and ourselves, all reports are submitted are the confidential property of clients and authorization for use, publication of statements, conclusions or extracts from or regarding our reports is reserved pending written approval. It has been a pleasure working with you and we look forward to doing so in the near future. Page 2 of 2