Loading...
HomeMy WebLinkAboutFIELD DENSITY TESTJ RECEIVED Phone 954-784.2941 edera JAN 12 2018 800-848-1919 Fax 954-784-7875 & TESTING INC. ST. Lucie County, Permitting .fed-eng.com 250 SW 13th Ave Pompano Beach, Fl. 33069 - Field Density Tests of Compacted Soils Method ®-6938 Project: Proposed Residence Lot 121, Creekside Date: January 11, 2018 Address: 8456 Cobblestone Drive, Fort Pierce, FL 34945 Order #: 18DR033 Area Tested: Building Pad Permit #: /Q _ () 7yc Material Type: Brown Sand with Some Shell Tech: 'BK Client: D.R. Horton, Inc. Address: 1430 Culver Drive NE Compaction Req.: 95% Palm Bay, FL 32907 Proctor Method: ASTM D-1557 Test # TEST LOCATION Probe Depth p ' Elev. Moist % Dry. Density PCF Proctor Value PCF Optimum Moisture % Compaction Pass 1 SW Corner of Pad 12" FL 14.0 103.9 105.6 13.0 98.4% Yes 2 NE Corner of Pad 12" FL 13.7 103.1 105.6 13.0 97.6% Yes 3 SE Corner of Pad 12" FL 13.9 104.0 105.6 13.0 98.5% Yes 4 5 6 7 8 9 10 11 12 13 14 �----- ��11111HAI RemancS: See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer -SZ Ar-1 `C This is a Compaction Test only on the top 12" of the pad and is not a verification of Sgki altin Ca acJ ,� Legend for Elevation: C) PR = Proofroll 1,2,3 = 1st, 2nd, 3rd Lift Submitted by: ' =_ SL = Springline FL = Final Lift Keith LeBla—mIx�ST SG = Subgrade BG = Below Grade Q ATE Inc.; �� .- g Federal EnginegiiAft�$, Ies�ng, . � l� BC = Basecourse BOF = Bottom of Footing Florida Reg. No. • ;, TOP = Top of Pipe FG = Finished Grade Certificate of Autho�lt�l As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorizailQtfr�p�7r Qf�lS��ements, conclusions or extracts from or regarding our reports Is reserved pending our written approval. A density test determines the degree of compaction I he tested layer of material only. A density does not replace a soil bearing capacity determination. These density tests do not certify the underlying soil materials below the proposed structure. The results do not preclude or guarantee that future settlement and cracking will not occur. A soil boring test is required to certify that the underlying soils will support the proposed structure without settlement. If no soil borings have been performed to .verify the underlying solls, we recommend that soil borings be Performed to evaluate the suitability of the underlying soil to support the proposed structure. After laying dormant for a period of 90 days or after heavy rain/stones, retesting must be performed on this work. PAGE 1 of 2 APPROVED PPROED Compacted Sells Method D-6938 DisclaknAr Pursuant to your request, Federal Engineering &I Testing, Inc. (FET) has performed a compaction test at the referenced project on the reverse side. The purpose of our test was to determine the degree of compaction of the tested layer of material only. In no way shall a compaction test replace a soil bearing capacity determination. A- soil boring test must be performed by the client prior to construction to verify subsoil conditions. Our scope of services only included testing the top 12" of added fill material. FET was not contract d to perform supervision of the building pad preparation. This testing of the added fill material -does not include an anZ'sis of the underlying soil materials to determine if they are capable of supporting the proposed structure. without settlement. This density compaction test does not warranty any underlying soil materials or conditions below the tested top 12 inches of material. If no.soil borings have been performed in the location of the proposed structure, we recommend performing soil borings below all foundation areas of the proposed structure to verify the underlying soil conditions. Environmental analysis of the soil materials is no part of the scope of services. If environmental analysis of the soils is required, we can provide a proposal for performin an environmental analysis of the soil materials. The scope of services is for determination of the degree of compaction. of the tested layer of material only. No other analysis is implied or warranted. Job project,specifications were not available at the time the work was performed. Determination of the pass/fail compaction results are based on current common industry req irements of 95% of the ASTM D-1557 standard for building foundations and 98% of the AASHTO T-180 standard for pave areas such as roadways and parking lots. If different specifications are required, Federal Engineering & Testing, Inc. shall lbe notified. Our findings are relative to the date and areas of our site work and should not be relied upon to represent conditions on other areas or dates. Any subsequent site dis urbances due to water . erosion, rain waters, construction activities, excavations, overgrown, vegetation, traffic and othr disturbances will void this test and the site must be re -compacted and re -tested prior to construction. As a mutual protection to clients, the public and o l rseives, all reports are submitted are the confidential property of clients and authorization for use, publication of statemets, conclusions or extracts from . or regarding our reports is reserved pending written approval. It has been a pleasure working with you and, we forward to doing so in the near future. Page 2 of 2 p� '1 +mot (4clb�_ t1' 17 l � DEC J 1 20*17 Phone 954-784-2941 ederal PERN]ITTING 800-848-1919 8 TESTING INC. St. Lucie County, ('L Fax 954-784-7875 250 SW 13th Ave Pompano Beach, Fl. 33069 www.fed-eng.com Field Density Tests of Compacted Soils Method D-6938 Project: Proposed Residence Lot 109, Creekside. Date: November 24, 2017 Address: 3100 Yellowstone Circle, Fort Pierce, FL 34945 Order #: 17-DR-1152 Area Tested: Building Pad Permit #: 110 -- 4>7 Material Type: Light Brown Sand with Some Rock Tech: SL Client: D.R. Horton, Inc. Address: 1430 Culver Drive NE Compaction Req.: 95%. Palm Bay, FL 32907 Proctor Method: ASTM D-1557 Test # TEST LOCATION Probe Depth Elev. Moist % Dry Density Proctor Optimum value Moisture Compaction Pass PCF PCF % 1 NE Corner of Pad 12" FL 11.3 105.1 110.5 12.5 95.1 % Yes 2 Center of Pad 12" FL 9.8 106.4 110.5 12.5 96.3% Yes 3 SW Corner of Pad 12- FL 1 9.4 1 105.8 110.5 12.5 95.7% Yes 4 5 0 7 X 10 11 12 13 Remarks: See Reverse Side Page 2 of 2) for Additional Information for Disclaimer3F- This Is a Compaction Test only on the top 12" of the pad and is not a verification of S g Ca Legend for Elevation: 0 ' PR = Proofroll 1,2,3 = 1st, 2nd, 3rd Lift Submitted by: ; Q; SL = Springline FL = Final Lift Keith LeBlanc, P1r SG = Subgrade BG = Below Grade Federal En tneeri S'r �� ? BC = Basecourse BOF = Bottom of Footingg ,�y81j1't?Sting, Inc. Florida Reg. No. 59�8floit� i'COR_�®• TOP =Top of Pipe FG =Finished Grade Certificate of Authoriz'a�t{p�ls����.����,, As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and author. zalion fiE I�p{4q conclusions or extracts from or regarding our reports Is reserved pending our written approval. A density test determines the degree of liompactlon� pr tFtegt�e� � yartof material only. A density does not replace a soil bearing capacity determination. These density tests do not certify the underlying soil materials below the proposed structure. The results do not preclude or guarantee that future settlement and cracking will not occur. A soil boring test is required to certify that the underlying soils will support the proposed structure without settlement. If no soil borings have been performed to verify the underlying soils, we recommend that soil borings be performed to evaluate the suitability of the underlying soil to support the proposed structure. Aker laying dormant for a period of 90 days or after heavy rainstorms, retesting must be performed on this work. PAGE 1 of 2 _4. Compacteei foils Pursuant to your request, Federal Engineering & Tes{ project on -the reverse side. The purpose of our test material only. In no way shall a .compaction test repla performed by the ciient.prior to construction to verify st 12" of added fill material. FET was not contracted to the added fill material does not include an analysis supporting the proposed structure without settlement. materials or conditions below the tested top 12 inches the proposed structure, we recommend performing verify the underlying soil conditions. ethos& D-6938 Disclaimer ig, Inc. (FET) has performed a compaction test at the. referenced vas to determine the degree of compaction of the tested layer of a soil bearing capacity determination. A soil boring test must be isoil conditions. Ourscope of services only=included testing the top )erforrn supervision. of the building pad: preparation. This testing of the underlying soil materials to determine if they are capable of This density compaction :test .does not warranty any underlying soil if material. If no soil borings have been performed in the location of it borings below all foundation areas of the proposed- structure to Environmental analysis of the soil materials is not part of the scope of services. If environmental analysis of the soils is required, we can provide a proposal for performing an environmental analysis of the soil materials. The scope of services is for determination of the degree of compaction of'the tested layer of -material only. No other analysis is implied or warranted. Job project specifications were not available at the tirr results are based on current common industry- require and 98%. of the AASHTO T-180 standard for paved a required-, Federal_ Engineering & Testing, Inc. shall.be work was performed. Determination of the pass/fail compaction is of 95% of the ASTM.D-1557 standard for building foundations such as roadways and parking lots. If different specifications are Our findings are relative to the date and areas of out site work and should not be relied upon to represent conditions on other areas or dates. Any subsequent site distur kturbances n* due to water erosion, rain waters,. construction activities, excavations, overgrown, :vegetation, traffic and other will void this'test and the site must be re -compacted and re -tested prior to construction. As a mutual protection to clients, the public and and authorization for use, publication of stater pending written approval. It has been a pleasure working with you and we look ves, all reports are submitted are the confidential property of clients conclusions or extracts from or regarding our reports is reserved to doing so in the near future. Page 2.of 2