HomeMy WebLinkAbout30 DAY TEMPORARY POWER RELEASEUfAtion Div r,
�3flfl���i��ilitt�� •�v�
E�Ci EIaVEDR
7-72=
LS�T.ucie County, Permitting
R-esq:ue; dos=iay'�rnoiir'ry' iovii�r ieas�
Date= \� Permit Mrriber.
PMject Address;
P
THE UNDERSIGNED HER -EBY REQUEST RELEASE OF ELECTRICAL POWER TO THE ABOVE DESCRIBED
PROPERTY, FOR A• PERIOD NOT TO EXCEED THIRTY .(30) -QAYS, I=OR THE PURPOSE OF TESnNG SYSTEM
AND EQUIPMENT IN PREPAR�Q.N FOR A FINAL, INSPIrM- ON. IN CONSIDERATION OF APPROVAL OF THE
AtQu we Hair ACKNOWLENE ANb AGE ASF OLLOWS:
1. 7bis terrporary-pouuer reiease is- regdesWd for the above stated pt ose� only, and there Dili be no
oc6upancv of any Wpe, off' than that pemttbed by coi$DuLt on 'during this time.pedo'd.
2. AS witness bg.orir signatures, we hereby agree th abide.by all terms and conditions of this agreement,
indadiiig Building Division Policy, which is lncorparated h&eiih by reference.
3. All conditions and requirem fisted'In the attaehed document entitied "Requirements for 30 Day,
Power fnr Testingp have'beeri fulfilled and the premise is ready for compliance inspempan,
4, All req'uesis for an a tension beyppd 30 days must%,made in weltSrig to the Bu➢Wing OfFteiar'sWng
the rea50n fvr the request Power tw be rernoGed from the site and%r a Stop Work Order issued if
the Final Inspection has riot inn approved within 30 days. A fee 6f $100.00' will be required to rdt
the Stop Work Order.
WE HEREBY RELEASE AND AGREE. TO HOLD HARMLE$S, ST. LUCIE COUNTY, AND THEIR EMPLOYEES FROM
ALL LI BiLMES AND .CLAIMS & ANY TY0E OF NATURE WHICH KAY ARISE NOW' OR IN THE FUTURE OUT
OI= it-F.t;S TRANSACTION, INCLUDING. ANY DAACE'"ICfl'NtaY BE INCtJE?R�D•'DUE. TD THE
I33LSCONNEMON OF ELECTRICAL POWER, IN THE EVENT OF -VI LAMON OF Tf iItS AGREEMEpM
DATLE
DATE
OLt-d Z000/ZOOOd 980-1 999L8L8ZLL -WMA L9= L L 8 L £ L-90