HomeMy WebLinkAboutCERTIFICATE OF TERMITE TREATMENT 4-14-18COUNTY
F L O R I V A
Planning & Development Services
Building & Code Regulation Division
2300 Virginia Ave
Fort Pierce, FL 34962
772-462-2172 Fax 772-462-6443
CERTIFICATE OF TERMITE TREATMENT
,ONSTRUCT$ON SOIL TREATMENT
PERMIT # :�� ? i JOB AD ESS: S
'r
BUILDER/CONTRACTOR: J�
PEST CONTROL CONTRACTOR: EVICT -A -BUG TERMIT &PEST CONTROL INC.
PEST CONTROL LICENSE #: J8175775
We, the undersigned, hereby certify that we have pretreated the theve descstandardsPest rControibed �Associat onor
subterranean termites in accordance withhe standards of the National
S� DOMINION 2L
Square feet if area treated:
Chemicals used:
Percentage of solution: •05% Total gallons used:
Date of Treatment:
Time of Treatment: r
Footing
1st Treatment
Re -Treat `
Driveway
690- 1st Treatment
Re -neat
Other Y u1 a
X_15t Treatment
Re -Treat
Slab
1st Treatment
Re -Treat
Pools
1st Treatment
Re -Treat _
Perimeter for Final spection
Signature of Exterminator Date
wcpe-)
Note: There must be a completed form for each required treatment or re -treatment and this form must be on the job
site to be picked up by the Inspector at time of each inspection or the scheduled Inspection will fall and a re -inspection
fee charged.
FBC104.2.6 Certl>7cate of protective Treatment for prevention of termites A weather resistant jobsite posting board
shall be provided to receive duplicate Treatment Certificates as each required protective treatment Is completed,
providing a copy for the person the permit /s issued to and another copy for the building permit files The Treatment
Certlf/cate shall provide the product used, Identity of the applicator, time and date of the treatment, site location, area
llons used, to
record Of
treated, a tneata ent. used,
if the soil chemical barrier method for tencentration and number of rmite prevention establish
final exterior treatment shall
protective treatm
be completed prior to final building approval.
St Lucie Countg/ requires for the f nal inspection for CO, a permanent Sticker to be placed on
the e0ectrica0 panel bons cover, 018tita g a00 the treatments and dates of apPlicationso
Ravis ,d 7/24/2014