HomeMy WebLinkAboutNOTICE OF SPECIAL FLOOD HAZARD REA�ot4 -
Planning & Development Services
Building & Code Regulation Division
2300 Virginia Avenue
Fort Pierce, FL. 34982
Phone:(772)462-2172 Fax:(772)462-6443
NOTICE OF SPECIAL FLOOD HAZARD AREA
PERMIT NUMBER: 1706-0650
ADDRESS: 445 NETTLES BLVD
JENSEN BEACH
CONTRACTOR: DENNIE H NEW
DBA: DENNIE H NEW CONSTRUCTION CO
OWNER: BARRY L. SCHWARTZ •
NOTICE
This Notice is to inform you that your property is in a Special Flood Hazard Area.
DATE: 8/8/2017
The base flood elevation of the property is feet, NAVD. Federal law requires that a flood zone determination be done as a condition of
a federally backed mortgage to determine if the structure is in a Special Flood Hazard Area and if so, to require flood insurance. It is up to
the lender to determine whether flood insurance is required for a property.
NO CONSTRUCTION is to proceed beyond the 1st floor/slab inspection, or just prior to the second floor pour of a multi -story structure,
until the required elevation certification has been completed by a registered surveyor, and received and approved by the Building & Code
Regulation Division of the St. Lucie County Planning & Development Services Department.
Violation of the requirement will result in the scheduling of a public hearing before the St. Lucie County Code Enforcement Board. The
Board is empowered to levy a fine not to exceed $250.00 per day for each day the violation continues. A fine not to exceed $500.000 per
day may be levied for a repeat violation. The fine may become a lien upon the real or personal property of the violator.
The elevation certification may be submitted any time within 21 calendar days from the above; however, no further construction should
take place, nor will any inspections be made until the required certification has been received and approved.
� N
Signature
- V--)
Date
July 24, 2017
Called Stella with Dennie New construction at 9:48 AM. Stella stated that they are redoing engineering
pushing the wall back so that the parking will fit in a revision will not have to be submitted at final
survey. I will finish my review once the new documents have been submitted. William