Loading...
HomeMy WebLinkAboutFBC ENERGY CONSERVATIONr-111 L-,.j Planning & Development Services Building & Code Regulation Division 2300 Virginia Ave, Rm 201 Fort Pierce, FL 34982 • 772462-2165 Fax 772-462-6M FBC ENERGY CONSERVATION CODE Duct Sealing Certification Prescriptive and Performance Method Date: -7 =Z-7 Permit S'(— G 1-70r 0 C Y3 Contractor: Construction: *ost Construction Test llecefft JUt 1 Z018 Perml tt,, O St Lu% Coun m�" Lot#: Address: ❑ Rough -in Test Test Conditions: / Date: 7 — / 7 — /p Floor Area (ft2): % y6 Time: Z Primary Location of Supply Ductwork Indoor Temperature (F): "7 / Primary Location of Return Ductwork Outdoor Temperature(F): _ ? 7 Duct Leakage: e%lt ❑ Prop. Leak Free a Proposed On = Test Pressure: 2,f (Pa) Baseline Duct Pressure (optional) / (Pa) Duct Press. (Pa) Flow Ring Fan Press Flow (cim) Results: Testing Company Company Name: Pro Duct Services n Total Leakage (cfm): 3-7 Total Leakage per 100 sgft: Qi CFM25 x 100 divided by the CFA = Duct Leakage CFMN00 sqft. Address. 1915 Rio Vista Dr., Fort Pierce. FI. I hereby certify that the above Duct Seating Leakage results demonstrate compliance with 5"h Edition FBC Energy Conservation requirements in accordance with Section R403.2.2. Signature:_ Printed Name: Michael Faurot License/Certificate #: 5059122