Loading...
HomeMy WebLinkAboutREVISION 12-12-17OFFICE USE ONLY: DATE FILED: r a) / � REVISION FEE: �k- DO PERMIT # I IO� -6 LPq RECEIPT # PLANNING & DEVELOPMENT SERVICES BUILDING & CODE REGULATION DIVISION 2300 VIRGINIA AVENUE FORT PIERCE, FL 34982.5652 (772) 462.1553 APPLICATION FOR BUILDING PERMIT REVISIONS PROJECT INFORMATION LOCATION/SITE ADDRESS:,�- DETAILED DESCRIPTION OF PROJECT REVISIONS: CONTRACTOR INFORMATION: STATE of FL REG./CERT. #: ST. LUCIE CO CERT. #: BUSINESS NAME: A�'-CwAq— Dbl �J T*Y\- QUALIFIERS NAME: Q"3q ADDRESS: CITY: STATE: ZIP: PHONE (DAYTIME): FAX: OWNER/BUILDER INFORMATION: NAME: _ ADDRESS: CITY: PHONE (DAYTIME: STATE: ARCHITECT/ENGINEER INFORMATION: IWWA ZIP: NAME:r �IwrOw W, wIr IwI-�� ADDRESS: BlEm. I&N-I'VEFF, NE CITY: ST PHONE (DAYTIME): SLCCC:9123109 Revised 06130117 9 !I -BEAM .. z XB WOOD CAP • '•'. 4" THICK SOLID CAP BLOCK B"XB"X16" CONCRETE N +. ASONRY UNITS (DRY —STACKED) PIER "A" F-1 ;• EXISTING CONCRETE IHER TY MA MUM SLAB (GOOD CONDITION) sl AR Tn Tnp n T. 2 X8 WOOD CAP THE FOUNDATION IS DESFe ` O MEET THE REQUIREMENTS OF THE FEMA85 CODE IN WHICH THE FOUNDATION MUST RESIST FLOTATION, COLLAPSE, AND LATE' -' EDVEMENT DUE TO THE EFFECTS OF WIND AND WATER LOADSi AND ALL OTHER LOADS DL.,, fHE BASE FLOOD. IN ADDITION, THE FOUNDATION IS DESIGNED TO PROVIDE RESISTANCE TO UPLIFT AND OVERTURNING OF THE F. ' 4UE TO FLOOD AND WIND FORCES AT THE BASE FLOOD. 2-0-4 '- 4'-0" O.C. MAX r MAX T F.T. I 0 FACTORY I -BEAM I v m I 00 I 0 '-0" 5' �-4" TYP o 0 MAX 6'-0" MA) Li �0 I**4'-O" �(O.C. MAF!{ .yIA-SEAM FACTORY I -BEAM aoz 10 +•, B•XB•X16" CONCRETE w ASONRY UNITS to ,' (DRY -STACKED) re"VIER "B" SLAB (GOOD CONDITION) NOTE: PIER TYPE "B" UAS A SLAB TO TOP OF P T 2 X 80M STRUCTURAL LOAD LIMITATIONS: CODE EDITION: 2014 FLORIDA BUILDING CODE (5TH EDITION) & ASCE 7-10 1. ULTIMATE DESIGN WIND SPEED: 170 mph WIND SPEED 2. NOMINAL DESIGN WIND SPEED: 132 mph WIND SPEED 3. WIND EXPOSURE CATEGORY: "D" 4: IMPORTANCE FACTOR: 1.0 5. DESIGN ROOF LIVE LOAD: 20 PSF G. DESIGN FLOOR LNE LOAD: 40 PSF 7. MIN. ASSUMED SOIL BEARING CAPACITY: 1500 PSF S. OCCUPANCY CLASSIFICATION: R3 FACTORY 5'-2" TYP 6'-0" MA) 0 !'-014'—O" ( MAX MAX Uhl 6'-0" MAX SPACING - (MATELINE) TYPE -0" MAX 2'-0"I MAX Rn COLUMN LOADS 10 = 2080 LBS. Q2 = 2080 LBS. `1iI11rrrr NCEN g No. 5 6 �S''••4 OR \ECG\ ON AL" '•1146r,1�1b-16-2017 -2" TYP. I I/ -0" MAX 2'-p• 1 70$f� MAXI ST. LUCiE c0L�T" RtiII WING . nTTcinrr Q I REVIEWED FOR COMP NC REVIEWED BY DATE. - — PLANS AND PEPUNIIT+MUST BE INEPT ON JOB OR NO INSPECTION WILL BE 11IADE. 2'-0 MAX FLOOD ZONE INFORMATION tiLSE PLAINS AND ALL PROPO; - FEMA MAP INDICATES THAT THIS LOT IS IN A FLOOD ZONE ;r;E SUSjECT TC ., '.Y CORREC- AEWITHBASEFLOODELEVATIONATTNAVD88. -;EQUIREC 3'; . IELD-I^!SPECTOF -LOT SITE GROUND (ESTABLISHED) ELEVATION IS 3,8' MAY "F NECESSARY IN ORDER' -MINIMUM FINISHED FLOOR ELEVATION TO BE 7.0' ::061PLY WITH ALL APPLICABLE GROUND ANCHOR INSTALLATION A BRACKET OR EpUAL FAS'JENED TO PERIMETER RAIL W 10 WOOD SCREWS MIN. 1 PENETRATION MIN 14 ,nIR5Vj(S,—OR 50X SCREWHOLES FlFlFl��� ��� mmm �u:euFlFlFl�LLLLLL�EEEEDDD F.T, -FRAME TIE -DOWN FASTENED TO GROUND ANCHOR -COLUMN ANCHOR STRAP FASTENED TO GROUND ANCHOR 0 -OLIVER TECHNOLOGIES, TIEDOWN ENGINEERING, OR MINUTE MAN ANCHORS LONGITUDINAL & LATERAL BRACING SYSTEM ® -OLIVER TECHNOLOGIES, TIEDOWN ENGINEERING, OR MINUTE MAN ANCHORS LATERAL BRACING SYSTEM ONLY WA 0 Cr