HomeMy WebLinkAboutLETTER- HOUSING AGREEMENTJoe Cicio
From: Jennifer Hance
Sent: Monday, August 28, 2017 2:40 PM
To: Joe Cicio
Subject: RE: 7008 Kenwood Road
Attachments: Step hanz-SOW.pdf
Hi Joe,
Please see the attached SOW. Please note that we will be doing a deductive change order to remove line item no. 2 in
the amount of $8,990 as the homeowner has decided he does not wish to have the septic system replaced.
Let me know if you need any additional information.
Thank you.
Y.
Jennifer Hance I Housing Program Specialist I Community Services
437 North 7th Street, Fort Pierce, FL 34950
P: 772-462-2376 1 F: 772-462-2855 1 E: hance jsducieco.org
faccbook.cotn/Sd u.cieGov twitter. coin/StLucieGov voutube.coit/StLucieGov
2016
Q�atR�
to vrork'
S7 Lt)C1�,COiiWtY..
From: Joe Cicio
Sent: Monday, August 28, 2017 2:33 PM
To: Jennifer Hance <hancej@stlucieco.org>
Cc: Joe Cicio <cicioj@stlucieco.org>
'Subject: 7008 Kenwood Road
Good afternoon Jennifer,
Could you please e-mail me the housing agreement for the above address
s
Thanks
Plans Examiner
Standard Building Inspector
Building Plans Examiner
One and Two Family Dwelling Inspector
One and Two Family Plans Examiner
St I- w,i & Cody PULE a*L& D WAorWt41VF Se rVUZ$1
1
St Lucie County Housing Rehabilitation Program
Work Write-Up/Bid Form
Owner: Kenneth Stephan,
Address: 7008 Kenwood Road, Fort Pierce, FL 34951
Phone: Home: (772) 464-0014
The work write-up/bid form is k general outline of the work to be performed. Please refer to the
project specification booklet for detailed instructions for each item noted below.
All items must be cost itemized in the space provided, each page of the bid documents that requite signature
. must be signed by the contractor and received before the deadline or the bid will be rejected.
*Items may be awarded on a line item basis due to budgetary constraints.*
Item #
Location
Description of Work
Price
• . Replace deteriorated and' decaying sections of the
siding and trim.. Pressure wash and paint entire
exterior. Homeowner to choose 1 trim color and
1 body color.
�
Exterior
• Remove. the wooden deck. Level ground and
$
q.qoo.1
install sod.
• Remove makeshift ramp at the front door and
install ADA compliant ramp.
• Pump septic tank and inspect septic system.
Provide the inspection report. Should the report
2
Plumbing
recommend system replacement, include the
$
replacement. in your bid price for this line item. .
• Replace damage interior door frame for the door
that goes from the house to garage.
Misc.
• Repair support slide to the second drawer under
1 / �
3
the oven.
I �J
• Install garage door opener.
• Replace wooden cabinet base under kitchen sink.
4
Carpet
` Remove and replace carpet and pad in all areas
$ • o^
3.6
where carpet currently exists.
O
TOTAL PROJECT COST $
*Bids must remain firm for a period of 90 days and award is contingent upon clearance of an
Environmental Review Record as required by the USDA,.*
/__V
/ , Page 9 of 10