HomeMy WebLinkAbout30 DAY TEMPORARY POWER RELEASERECEIVED
P1M.-nfg9 & Dev lopmen Ser iiCes
�11 JUN 2 2.2019
idlj*0 8C £ode Reiu' l-Ation DlVlSlon Permitting DeP a
St. Lucie rtmen•
20irgfriia Ave count,
Fort Pier ce; FL 34982
7-72-462-22165 Fax 772-462-6443
equ for 30-Day Temobrary'Pawer ftlease
Date, Permit •Number:
Primed Address.
THE UNDERSIGNED HEREBY REQUEST RELEASE OF ELECTRICAL POWER TO THE ABOVE DESCRIBED
PROPERTY, FOR A PERIOD NOT TO EXCEED THIRTY (30) DAYS, FOR THE PURPOSE OF TESTING SYSTEMS
AND EQUIPMENT IN PREPARATION FOR A FINAL INSPECTION. IN CONSIDERATION OF APPROVAL OF THE
REQUEST WE -HEREBY ACKNOWLEDGE AND AGRiEI= AS FOLLOWS.-
1. •This temporary power release is requested for the above stated purpose only, and tTtere Vol be no
occupancy of any type, oilier than that permitted by construction during this time perjbd.
2. A$ witness by, our signatures, we hereby agree to abide by all terrns and conditions of this agreemeri ,
including Building Division Policy, which is incorporated herein by reference.
3. All conditions and requirements• listed in the attached document entitled "Requirements for 30 Day
Power for Testing" have'been fulfilled and the premise is ready for compliance inspection.
4_ All requests for art extension beyond 30 days must be made in writing to the Building 'Offdal stating
the reatori for The request. Power may be removed from the site and%ar a Stop Work. issued if
the Final Inspe.ction has not been approved within 30 days. A fee of $100:0p will be required to lift
the Stop Work Order.
WE HEREBY RELEASE AND AGREE. TO HOLD HARMLESS,- S'I ; LUCIE COUNTY, AND THEIR EMPLOYEES FROM
ALL L TAB1UTIES AND CLAIMS OF ANY TYPE OF'iVATURE WHICH MAY ARISE NOW OR IN THE FUTURE OUT
OF THIS TRANSACTION, INCLUUDING ANY DAMAGE •v H.ICi4MAY BE INCURRED DUE TO THE
DISC ONNEC MN OF ELEi=CAL POWER IN THE- EVENT OF VIOLATION OF THIS AGREEMENT.
(-A'2'�),Vce
DA7E
DATE
6tg-d L000/ LOOOd I L L-1 999L8L83LL -Woad L0=0 L 8 L 33-90