Field Density Tests of Compacted Soils Method D-6938
Project: Proposed Residence Lot 105; Creekside Date:
Address: 8516 Cobblestone Drive, Fort Pierce, FL 34945 Order #:
Area Tested: ' Building Pad Permit-#:
Material Type: Brown Sand with Some Shell.,
Tech:
Client: D.R. Horton, Inc.
Address: 1430 Culver Drive NE
Palm Bay, FL 32907
August 22, 2017
17-DR-844
®� - 0,-x1/0
BK
Compaction Req.: 95%
Proctor Method: ASTM D-1557
Test
#
TEST LOCATION
Probe
Depth
p
. Elev.
Moist
,o
Dry
Density
PCF
Proctor
Value
PCF
Optimum
Moisture
%
:
Compaction
Pass
1
Center of Pad
12"
FL
7.4
104..6
107.0
1 13.0
97.8%
Yes
2
NW Corner of Pad
12"
FL
6.9
103.0
107 0
.13.0-
97.1 %
Yes
3
SE Corner of Pad
12"
FL
7.0
104.8
107.0
13.0
97.9%
Yes
4
5
6
7
8
9
10
11
12
13
14
KemarKS: See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer
This is a Compaction. Test only on the top 12" of the pad and is not a verification bfq oil B aring Capacity.
Legend for Elevation:
PR = Proofroll 1,2,3 = 1st, 2nd, 3rd Lift Submitted by: pL
SL = Springline FL = Final Lift -Keith LeBlanc,'P:E.
SG = Subgrade BG = Below Grade Federal Engineering &:Testing, Inc.
BC = Basecourse BOF = Bottom of Footing Florida Rey. No. 59394
TOP = Top of Pipe FG = Finished Grade = Certificate of Authorization #5471
As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization fn? publication of statements,
conclusions or extracts from or regarding our reports is reserved pending our written approval. A density, test detemilnes the Ale, ree'of^Lcm�action of the tested layer of
material only. A density does not replace a soil bearing capacity determination. These density tests do not certify,thr� underlyingoil_m tor;als below the proposed structure.
The results do not preclude or guarantee that future settlement.and cracking will not occur. A soil boring test is roquired_ fo certify Jt the underlying soils will support the
proposed structure without settlement. If no soil borings have been performed to verify the underlying soils, weirecomrnend that .oil, borings be performed to evaluate the
suitability of the underlying soil to support the proposed structure. After laying dormant for a period of 90 days or after heavy,ra?rJMtonns, retesting must be performed on this
work.
PAGE 1 of 2
Compa
Pursuant, to your request, Federal Engine
project on the reverse side. The purpose
material only. In no way, shall a compactii
performed by the client prior to constructio
12" of added fill material. FET was not c
the added fill material does not include
supporting the proposed structure without
materials or conditions below the tested tc
the proposed, structure, we recommend I
verify the underlying soil conditions.
Soils Method D-6938 Disclaimer
ring & Testing, Inc. (FET) has performed a compaction test at the referenced
of our test was to determine the degree- of compaction of the tested layer of
i test replace a soil bearing capacity determination. A soil boring test must be
to verify subsoil conditions. Our scope of services only included testing the top
ntracted to perform supervision of the building pad preparation. This testing of
i analysis of the underlying soil materials to determine if they are capable of
>ettlement. This density compaction test does not warranty any underlying soil
12 inches of material. If no soil borings have been performed in the location of
;rforming soil borings below all foundation areas of the proposed structure to
Environmental analysis of the soil materials is not part of the scope of services. If environmental analysis of the soils is
required, we can provide a proposal for performing an environmental analysis of the soil materials. The scope of services is
for determination of the degree of compaction of the tested layer of material only. No other analysis is implied or warranted.
Job project specifications were not available at the time the work was performed. Determination of the pass/fail compaction
results are based on current common .industry requirements of 95% of the ASTM D-1557 standard for building foundations
and 98% of the AASHTO T-180' standard for paved areas such as roadways and parking lots. If different specifications are
required, Federal Engineering & Testing, Ine. shall be notified.
Our findings are relative to the date and a�eas of our site work and should not be relied upon to represent conditions on
other areas or dates. Any subsequent "site disturbances due to water erosion, rain waters, construction activities,
excavations, overgrown, vegetation, traffic and other disturbances will void this test and the site must be re -compacted and
re -tested prior to construction.
As a mutual protection to clients, the public) and ourselves, all reports are submitted are the confidential property of clients
and authorization for use, publication of statements, conclusions or extracts from or regarding our reports is reserved
pending written approval.
It has been a pleasure working with you and) we look forward to doing so in the near future.
Page 2 of 2